CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.

Slides:



Advertisements
Similar presentations
1 Accelerator R&D for Future Large Colliders at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V.
Advertisements

Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
LAPP electronics developments Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC WS 12-16/10/2009.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
BPS Location in CTF3/CLEX Area Mechanics with PCB Electronics Test Results BPS Linearity Error A linear fit of the wire test measures was done (left) for.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
B EAM STEERING EXPERIENCE AT CTF3 Davide Gamba 14 June 2014 Americas Workshop on Linear Colliders Fermilab.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
Status of the ILC Main Linac BPM R&D Thibaut Lefevre CERN Claire Simon CEA Sacley Sebastien Vilalte LAPP Manfred Wendt Fermilab 11/19/20081ILC08 Main Linac.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC meeting 09/ Lars Søby, CERN AB/BDI1 PBPM: Precision Beam Position Monitor. WBCM: Wide Band Current Monitor. EUROTeV Diagnostics WP5
Collimator BPM electronics – Results from the lab, SPS and LHC
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Beam Test status and Plans of the ILC Main LINAC BPM
An Inductive Pick-Up (IPU) for Beam Position and Current Measurement
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
STORM Beam Instrumentation First ideas Lars Søby on behalf of the CERN Beam Instrumentation Group.
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
Context of CERN-LAPP collaboration HS,
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Oleksiy Kononenko CERN and JINR
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
16/01/12DITANET Topical Workshop on Beam Position Monitors Reentrant Beam Position Monitors DITANET Topical Workshop on Beam Position Monitors 16 th –
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
1Ben ConstanceCTF3 working meeting – 09/01/2012 Known issues Inconsistency between BPMs and BPIs Response of BPIs is non-linear along the pulse Note –
The LHC Beam Position System Ad-hoc Working Group on LHC Experiment-Machine Parameter and Signal Exchange 26 th March 2002 Rhodri Jones (SL/BI)
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
CLIC Drive beam BPM Requirements and cost estimate.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
EUROTeV Diagnostics WP5
Phase Feed-Forward Piotr Skowroński (CERN)
First Year of Operation at the Two-beam Test Stand
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
LAPP BPM Read-out Electronics
CLEX* Status and Plans CTF3 complex CLEX
CLIC Workshop 2016: Main Beam Cavity BPM
CTF3 Collaboration Technical Meeting January 2008
AWAKE status and readiness for phase #2
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Status of muon monitor R&D and construction
CLIC Beam Instrumentation
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1

Agenda Different types of BPMs Electronics Radiation problems From CTF3 to CLIC October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 2

DL TL1 CRM CR TL2 CLEX CLIC Test Facility 3 3 TL1 & CRM commissioned fall 2006 Linac: commissioned with beam Delay Loop: commissioned with beam CR commissioning since 2007 TL2 and TBTS commissioning started August 2008 October 18-22/2010 IWLC2010 CTF3 BPMs A total of 137 BPMs

Electrostatic Pick-up (BPE) October 18-22/2010 IWLC2010 CTF3 BPMs 4 Feed-through’s RF contacts Electrode, C~100pF Developed by L. Søby, CERN

October 18-22/2010 IWLC2010 CTF3 BPMs 5 Electrostatic PU (BPE) BPE sum signals Electrodes charging up due to beam halo! Buffer amplifier, R L = 1 MΩ HT bias

Inductive Pick-Up’s (BPM, BPI, BPS, EuroTeV) October 18-22/2010 IWLC2010 CTF3 BPMs 6  Robust and well know design (LPI)  Electrodes outside ceramic chamber  Each transformer has one calibration turn.  Provides current measurement.  Many different parts gives limited absolute accuracy  Resolution limited to ~ 50um. Ferrite Electrode Current transformer Titanium

October 18-22/2010 IWLC2010 CTF3 BPMs 7 Inductive pick-up’s (BPM) 46 BPM’s installed as from march 2008 Developed by M. Gasior, CERN

October 18-22/2010 IWLC2010 CTF3 BPMs 8 Inductive Pick-up’s (BPI) 52 BPI’s installed as from march electrodes installed on racetrack chamber Current transformer with 30 turns and R L =14Ω Developed by A. Stella, Frascati

EuroTeV Inductive BPM October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 9 Stdev 1PBPM _1.5A= 0.6µm

Inductive BPS October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 10 BPM developed by Juan J. Garcia-Garrigos, IFIC Valencia, Spain Electronics by: G. Montero UPC, Barcelona, Spain Noisy and wrong measurements close to PETS

Button Pick-up’s (BPR) October 18-22/2010 IWLC2010 CTF3 BPMs 11 Developed by L. Thorndahl et al.

Button Pick-up’s (BPR) October 18-22/2010 IWLC2010 CTF3 BPMs 12 Button electronics Phase set to minimum Phase set to maximum.

October 18-22/2010 IWLC2010 CTF3 BPMs 13 Button Pick-up’s (BPR) BPR – RF phase monitor Phase advance per turn (3GHz) Simulated signal Combination factor 4 Combination factor 4 with + 5  error Plot by R. Corsini Combiner ring path length

October 18-22/2010 IWLC2010 CTF3 BPMs 14 Button Pick-up’s (BPR) Waveguide electronics RF in Shorter bunches means more power in the WR 2 8

Re-entrant Cavity BPM (CALIFES) Re-entrant geometry for a higher frequency separation between the monopole and dipole modes. → Better CMRR Resolution: ~ 1um (CALIFES ~5um) Q ld = 50 → Time resolution ~ 2-3ns ID 18mm; Length ~100mm. October 18-22/2010 IWLC2010 CTF3 BPMs 15 Developed by M. Loung, C. Simon, Sacley

October 18-22/2010IWLC2010 CTF3 BPMs16 Re-entrant cavity BPM electronics Re-entrant Cavity BPM (CALIFES) Only one BPM at a time 

October 18-22/2010 IWLC2010 CTF3 BPMs 17 Acquisition system: Linac, CR Tunnel Control room Front-end electronics gives improved CMRR. Calibration of position and intensity. Observation of analogue signals “Standard” acquisition system

October 18-22/2010 IWLC2010 CTF3 BPMs 18 LAPP Acquisition system: TL2, CLEX Tunnel CLEX Gallery Front-end electronics maintained. Signals digitized in tunnel ☺→ Big reduction in cable costs No analogue signal observation.

LAPP acquisition system October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 19 Designed to withstand 300 GY. FPGA sensitive part. Communication link died rather quickly due to too high radiation doses. LAPP is developing new front end acquisition system. To be used on each CLIC module not only for BPMs, but for all “clients”

Calibration October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 20

From CTF3 to CLIC October 18-22/2010 IWLC2010 CTF3 BPMs Lars Søby 21 AccuracyResolutionStabilityBandwidth Beam tube aperture Available length How many? Used in RT Feedback MB 5µm5µm 50nm100nm20MHz8mm< 80mm4176Yes DB 20µ m 2um20MHz23mm~100mm43000Yes CTF3 ~300µ m <50µm?100MHz40mm?~200mm135No High accuracy and resolution as well as big numbers eliminates inductive BPM’s! If 1% of our BPMs fail we have more than 500 BPMs not working and which must be repaired. IN CTF3 we have had only 2 BPMs failing…….

Main linac BPM’s (baseline) October 18-22/2010 IWLC2010 CTF3 BPMs Lars Søby 22 Main beam BPMDrive beam BPM

IWLC2010 CTF3 BPMs From CTF3 to CLIC Large scale projects come along very rarely at CERN SPS  LEP 13 years LEP  LHC 19 years LHC  CLIC ? Experience is unfortunately lost along the way Few of the LEP BI construction team saw beam in LHC Similar mistakes were probably made again Main Points Retained from LHC Experience (1000 BPMs) Clear functional specifications required very early Clear project management structure essential from the outset R&D, design & testing times largely underestimated Especially true when designing for radiation environments Standardisation across domains improves effectiveness as a whole Quality assurance procedures important for large scale production Host laboratory personnel time to be foreseen for collaborations Lars Soby 23 October 18-22/2010 Slide by R. Jones

Summery New CLEX and TL 2 acquisition system has problems with CPU load, due to too many clients. Work around being looked into by CERN controls group. New calibration GUI is very useful. Noisy signals on BPS close to PETS in TBL line. This is an important information for CLIC and is being looked into. Radiation damage of first generation FE digitizers has shown the need for a robust, simple and standard module acquisition system. CLIC is very different (numbers) from CTF3 and it is very difficult to draw any other conclusions which can be used for CLIC. October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 24