CLEEN WORKSHOP 11-13 June 2007: ESRC Centre for Competition Policy University of East Anglia Energy Community for South East Europe: Implementation to.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

The South East Europe Natural Gas Market FABIO TAMBONE & SERGIO ASCARI (Autorità per lenergia elettrica e il gas)
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
Bosnia and Herzegovina
1 European Commission DG TREN / C: Conventional Energy The Regional Electricity Market in South East Europe: Mechanisms and Aims in Unified.
From Rehabilitation to Reform EC support to the energy sector European Agency for Reconstruction May 2006.
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward.
4 th Athens Forum Athens, June 3-4, 2004 Towards a Standard Market Design for the South- East European Electricity Market Prof. P. Capros chairman of RAE.
Position Paper Standard Market Design of the SE Europe Electricity Market 3 rd Athens Process Forum Sofia, October 2003.
Second Asia Gas Buyers’ Summit Mumbai, 2-3 February 2004
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Completing the EU internal energy market IFIEC, 22 November 2011
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Energy Regulators Regional Association - present and future - Maria Manicuta ERRA Bucharest APRIL 03-05, 2006 Black Sea Energy Conference.
Completing the EU internal energy market
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
4th PRS Western Balkans Forum, Athens, June 27 Regional co-operation in the energy sector: Perspectives for the Western Balkans and the European Union.
Number of players The number of players at wholesale level is very limited (more then 97% of sources /production + import/ in one /incumbent/ hand) New.
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Recent Regulatory Developments in the gas market of the Energy Community Dr. Michael Thomadakis Vice President, RAE Chairman of the Gas Working Group,
Guido Pier Paolo Bortoni President of Italian Regulatory Authority for Electricity Gas and Water (AEEGSI) UNIVERSAL ENERGY ACCESS A Focus on Universal.
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
Latvian electricity market Latest developments
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Organization of the electricity market and renewable energy sources in the Republic of Croatia" Dubrovnik, 2 nd October th Dubrovnik Conference.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Croatian Power System 1 The Electric Power System - Croatia -
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
1 The Energy Community of South East Europe 4th Poverty Reduction Strategies Forum June 26-27, 2007 Athens, Greece Henk Busz Europe and Central Asia Region.
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
The Eurasian Electricity Market – Ideas for Intergovernmental Co-Operation/Waern1 -The Eurasian Electricity Market - Ideas for Intergovernmental Co-Operation?
DRAFT Discussion Paper on the Options for the Transition Phase of the ECSEE Regional Energy Market Donors meeting Vienna, 13 July 2004.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
Energy Community Secretariat Committee on Industry, Research and Energy, European Parliament Energy Community Activities and Outlook for the Future Brussels,
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Bosnia and Herzegovina State Electricity Regulatory Commission ERRA Workshop on Regulatory Monitoring of Electricity Sector Almaty, 31 Jan – 3 Feb 2006.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
ELECTRICITY MARKET IN BULGARIA an attempt for realistic point of view Lubos Pavlas Regional manager of CEZ for Bulgaria Sofia,
International Conference
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

CLEEN WORKSHOP June 2007: ESRC Centre for Competition Policy University of East Anglia Energy Community for South East Europe: Implementation to date and open questions Rozeta Karova EUI, Law Department

Outline of the presentation Athens Process: Athens Memoranda & Energy Community Treaty Background information: generation & transmission National reforms: -Legislative framework -Institutional reforms -Economical structural reforms: restructuring & privatization -Unbundling -TPA -Eligible customers & opening the markets -Tariff reforms, PSO and affordability issue National market designs & standard market design for SEE REM Licenses Remaining obstacles

Athens Process Enlargement Process => regional integration central part of SAP -Common problems for SEE countries (energy prices below economic levels; inappropriate pricing/tariff structures; poor infrastructure; state- owned VIC; limited institutional capacity; energy policies, legislation and standards different from the EU; lack of transparency) -Benefits from regional integration (reliable, low-cost and environment- friendly sources of energy; better utilization of the existing capacities; attracting foreign investments; facilitating cross-border trade; lowering transaction costs; strengthening institutional arrangements and assisting in adoption of the EU standards for infrastructure development and regulation, having in mind the expected integration in the internal electricity market) Athens Memorandum 2002 Athens Memorandum 2003 Energy Community Treaty 2005

Energy Community Treaty Objectives Measures: -Adoption of the acquis in energy, competition and environment; -establishing common rules for the functioning of the national electricity markets and mechanisms for crisis situations – safeguard measures, -establishing REM – prohibition of taxes and quantitative restrictions for import and export of electricity, common rules for trade with third countries and -opening of the markets after a suitable transition period (all non- household markets to be open by 2008 and all household markets by 2015). Institutions : -Ministerial Council -PHLG -ECRB -Secretariat -Athens Forum

Background Information: Generation -Bulgaria and B&H = exporters; SEE region = net importer -SEE fuel mix: 40% coal, 23% hydro, 23% gas, 7% oil and 7% nuclear -Benefit from regional integration: substitution between thermal and hydro power in peak and off-peak periods; differences in the fuels price and periods of peak demand -GIS: 11.6GW installed capacity needs to be rehabilitated and 13.5GW new capacity needs to be installed, which would require EUR16 billion of investment BUT -Small size markets – concentration in generation after unbundling (1 in Kosovo and 3 generators in Montenegro; In Albania and Macedonia the biggest 4 generators have around 98%); competition could not be introduced at national level => integrating the markets = lowering their market power, -Significant participation of the multinational companies (for example, ENEL, ENI, CEZ) in the region, -long term contracts and PPAs required to attract investment.

Background information: Transmission In the past part of SFRY network, not made to be self-sufficient -Now all countries except Albania are connected to UCTE -GIS: necessity for investment in transmission lines and interconnections = EUR340 millions Example: Macedonian interconnections - 400kV level with Greece and Serbia, - two 110kV connections with Bulgaria and another 400kV transmission line is under construction, - not connected only with Albania. There are projects for strengthening the interconnections by upgrading the existing line North–South and establishing new one East–West.

National reforms Legislative framework Institutional reforms Economical structural reforms: restructuring & privatization Unbundling TPA Eligible customers & opening the markets Tariff reforms, PSO and affordability issue

National reforms 1 Legislative framework & Institutional reforms Legislative framework - All SEE countries - have adopted primary legislation - Some SEE countries - not fully adopted secondary legislation (especially regarding cross-border issues). Institutional reforms: all SEE countries have established NRA - appointed by Parliaments on proposal by the Government (usually), years with possibility for renewal of their term, - funding - own sources provided from collection of the license fees, - adopt methodologies for calculating tariffs, and setting tariffs for final regulated consumers BUT insufficient competences for filing complaints to the NRA, the management and allocation of interconnection capacity and fixing tariffs of access to the networks (Report on the implementation of the EnCT, May 2007 ).

National reforms 2 Economical structural reforms: restructuring & privatization Example: restructuring of the Electric Power Company of Macedonia (Elektrostopanstvo na Makedonija-ESM) -2000: public state-owned company -> JSC AD ESM -2005: AD ESM = AD MEPSO (Network Owner, TSO, MO) + AD ESM (production & distribution of electricity) -2005: AD ESM = (AD ELEM + TPP Negotino) generation + AD ESM (distribution & supply) -2006: privatisation of AD ESM (distribution & supply) by EVN AG Further examples: Bulgaria, Romania

National reforms 3 Unbundling & TPA Vertical unbundling Unbundling of the TSO: -Almost all SEE countries, except Albania, Bulgaria, Croatia and Montenegro -Croatia: subsidiary of a holding company, B&H: ISO Unbundling of the DSO: -Only Croatia and Romania Horizontal unbundling Unbundling in generation or retailing -Only in Bulgaria: privatisation of 32 small HPPs with an overall installed capacity of 243MW in 2003 TPA: Grid Codes and Market Rules

National reforms 4 Opening the Electricity Markets & Tariff reforms Non-household customers and households : B&H, Bulgaria, Croatia, Romania and Macedonia have set the timetable and took concrete measures to open the markets SEE tariffs: 2,8 to 7,6cents/kWh + payment discipline: 85% + high distribution losses: >22% Regulated Fixed Tariff Mechanism Questions whether: - all customers will be obliged to buy under regulated tariffs or will have possibility to choose? - distribution companies are eligible? - generators are regulated and obliged to sell at home?

National reforms 5 PSO & affordability PSO - provisions in the laws are adopted BUT no protection of vulnerable consumers, no supplier of last resort Affordability (Montenegro, Macedonia, Croatia and Serbia ) ECRB adopted Guidelines on protection of vulnerable consumers + Memorandum of Understanding on Social Issues in October 2007

National market designs Mostly bilateral contracts and 3 power exchanges in the SEE region Different in market designs: -Croatia (importing): bilateral contracts for supply of electricity (eligible customers & suppliers), trade of electricity (supplier, trader or producer), use of the network (eligible customers or producers & TSO/DSO), balancing (supplier of eligible customers & TSO). -Macedonia (importing): hybrid wholesale market with no competition, single buyer model (wholesale: regulated contracts between generators & TSO, unregulated contracts between TSO & other sources; retail: regulated contracts between DSO & TSO, DSO & distributed generation, DSO & tariff customers). -B&H (exporting): ISO and generators/distributors are vertically integrated in 3 different areas -Romania (exporting): multi generators & multi suppliers, bilateral contracts, voluntary DAM

Definition of the SEE REM Standard market design for SEE REM 7 REM in the EU, 8 th SEE is not defined yet SMD SEE REM (CEER, 2003): full competition at wholesale market achieved starting with bilateral contracts between the generators & eligible customers from different countries. -Bilateral contracts between generators & eligible customers + DAM at a later stage (as additional place where the generators will be able to place additional capacity serving the eligible customers, which in turn would be able to buy at time closer to real time) Licenses -Lack of consistency in the definitions trader / supplier - Bulgaria only trading license, Romania only supply license, Croatia and Macedonia both -Different regulatory procedures

Obstacles to trade in SEE (SEETEC study) Incomplete implementation of TSO issues (unbundling, TPA, access tariffs) Introduction of competition in generation and supply (market concentration, vertical foreclosure, operability of market rules) Issues specific to SEE (tariff issues, harmonisation of market models and licensing regime)

Summary of the achievements and remaining open issues Progress: development of legislation, unbundling, PSO provisions, TPA and overall wholesale market organization. Need for improvements: technical rules, unbundling of distribution and supply, unbundling of generation, development of a retail market, tariff reform and protection of vulnerable consumers and appointment of a supplier of last resort. Open questions: -the definition of the geographical scope of the SEE region, -harmonisation of market rules and national market designs, -licensing regime, -regulators activity with regard to tariff reforms.