Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.

Slides:



Advertisements
Similar presentations
Site Conceptual Models
Advertisements

Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
BoRit Superfund Site Timeline
The Voluntary Remediation Program Progress In An Evolving Program September 2012 Keith Bentley Chief, Land Protection Branch Georgia EPD.
ENVIRONMENTAL UNIT IN AN ICS STRUCTURE. EU Mission Statement The Environmental Unit is established to provide technical and scientific expertise and capabilities.
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
Remediation Programs Update MSECA Quarterly Meeting March 13, 2012.
INTRODUCTION TO THE USE OF CERCLA FOR ENVIRONMENTAL CLEANUP PROJECTS USDA FOREST SERVICE Grants and Agreements Workshop February 28, 2002 Great Falls,
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Institutional Controls Pamela Elkow and Richard Fil.
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
Wellhead Protection Strategies: Keys to Success Prepared by: Mr. Brian Oram, PG, Licensed Driller, PASEO B.F Environmental Consultants and Wilkes University.
Common Issues for Exposure Scenarios without GNS VAP CP Summer Coffee July 14 th, 2015 Mike Allen Ohio EPA CO- Supervisor
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
Legal Perspectives May 19, 2014 Jay Fox Regional Counsel FTA Region III.
Gradient CORPORATION Vapor Intrusion Attenuation Factors (AFs) – Measured vs. EPA Defaults A Case Study Presented by Manu Sharma and Jennifer DeAscentis.
DTSC VAPOR INTRUSION GUIDANCE California Industrial Hygiene Council 16 th Annual Conference Dan Gallagher Department of Toxic Substances Control California.
Brandon Real Estate Board - June 19/20031 Your Logo Here ENVIRONMENTAL SITE ASSESSMENTS Phase I ENVIRONMENTAL SITE ASSESSMENTS Phase I.
Vapor Intrusion and Environmental Liability Learning From Past Mistakes EDR Insight Webinar, February 12, 2013 Presented by: Joseph Maternowski Hessian.
Prioritize Contaminated Sites With a Known Release and a Pathway That Poses the Greatest Threat of Exposure  Pathways to surface water Freshwater wetlands,
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.
Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC.
Italy: developments in the new legislation and progress in the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Italy: the new legislation on the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting 5-7th June 2006, Athens,
The Contaminated Sites Cleanup Process (18 AAC 75)
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
USEPA Region 2 Vapor Intrusion Study Cayuga Groundwater Contamination Site March 4, 2009.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
Preparing a Site Conceptual Model. Typical Site Management Problems: Site complexities  Complicated hydrogeology  Multiple contaminants of concern (COCs)
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Environmental Considerations prior to purchasing Properties Sabine E. Martin, Ph.D., P.G. Center for Hazardous Substance Research Kansas State University.
FAIR Meeting April 6, Groundwater Results – Fall 2003 Benzene ND 1,000 ug/L Product.
Massachusetts Waste Site Cleanup Program _________________________________ Privatized program since 1993 Direct oversight of only the highest priority.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
Tacoma Smelter Plume Yard Program Technical Workshop April 11, 2013 Wilson High School.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
Avoiding Future Shock: Long Term Solutions for Brownfields Ignacio Dayrit, City of Emeryville Brownfields 2004.
RE-Powering America’s Land: Siting Renewable Energy on Potentially Contaminated Land, Landfills and Mine Sites.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
Wisconsin’s New Approach to Land Use Controls Presented by Mark F. Giesfeldt Wisconsin Department of Natural Resources.
1 ICs at the WDI Superfund Site Brownfields 2004 St. Louis, MO Sarah Mueller U.S. Environmental Protection Agency Office of Regional Counsel Region 9,
Proposed Plan for No Further Action
The Prepared Process: The Next Generation
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
East Hennepin Avenue Site
Chemical Metals Industries, Inc. (CMI)
Welcome.
Connecticut Remediation Standard Regulations: Volatilization Criteria
Chemical Metals Industries, Inc. (CMI)
Institutional Controls At Voluntary Cleanup Sites
Preparing a Site Conceptual Model
Presentation transcript:

Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC

Areawide vs. Site Specific Approach  Sites viewed in context with others, not individually  Data can be shared, eliminating redundancy  Co-mingling issues more easily resolved  Variability of scale allows new information to emerge

For ADEC Map site locations Map site locations Determine site status (open, closed, how much work is needed) Determine site status (open, closed, how much work is needed) Identify preliminary data gaps Identify preliminary data gaps Identify PRPs Identify PRPs Possibly involved in data collection, investigation, coordination, cleanup if necessary Possibly involved in data collection, investigation, coordination, cleanup if necessary

Fairbanks Areawides

Common ADEC Requirements for All Responsible Parties 1)Delineate nature and extent (18 AAC ) 2)Evaluate risk to current and future land users 3)Protection of current & future land users through ICs 4)Cleanup and management plans 5)Consistent and compatible reporting for purposes of information dissemination Proactive and solution oriented

1) Delineate contamination Identify all possible sources and COCs Identify all possible sources and COCs Identify conditions that could result in ongoing releases (buried piping, tanks, abandoned injection wells, etc.) Identify conditions that could result in ongoing releases (buried piping, tanks, abandoned injection wells, etc.) Delineate extent of contaminants in soil and groundwater (on and off-property) Delineate extent of contaminants in soil and groundwater (on and off-property) Long-term monitoring necessary to monitor groundwater quality

FAIR Coordinated Sampling Spring Sampling – 3 rd week in April Spring Sampling – 3 rd week in April Fall Sampling – 3 rd week in September Fall Sampling – 3 rd week in September Common benchmark for groundwater elevation Common benchmark for groundwater elevationProblems Shared groundwater data (EDDs) Shared groundwater data (EDDs) Shared reporting (currently handled by DEC) Shared reporting (currently handled by DEC)

FAIR Coordinated Sampling General Results Product present on every site Dissolved Benzene/GRO at highest concentrations at southern end DRO/RRO throughout area Off-site delineation not complete

2) Evaluate Risk FAIR Risk Management Zones – Commercial/Industrial FAIR Risk Management Zones – Commercial/Industrial CSM needed for this area CSM needed for this area Hydrogeologic characteristics Hydrogeologic characteristics Contaminant location and transport characteristics Contaminant location and transport characteristics Possible Exposure Pathways Possible Exposure Pathways Are there risks to human health or the environment that need to be controlled or mitigated? Are there risks to human health or the environment that need to be controlled or mitigated? Wells or dewatering activities? Wells or dewatering activities? Indoor air quality problems? Indoor air quality problems? Risks should be mitigated through cleanup or risk management

FAIR Risk Management Plan

Risk Management Zones

3) Cleanup and Management Plan What are the site-specific requirements? What are the site-specific requirements? Control risk Control risk Remove source/product Remove source/product Reduce the life of the plume and long-term monitoring requirements (flexible) Reduce the life of the plume and long-term monitoring requirements (flexible) Compatible with the land owner needs? Compatible with the land owner needs? Schedule? Schedule? Plan should balance cleanup and management options with expected site use and cost considerations

4) Institutional Controls Necessary now – not later Necessary now – not later Better long-term management of contamination is priority for DEC Better long-term management of contamination is priority for DEC IC plan should be coordinated with Railroad IC plan should be coordinated with Railroad RP will continue to be responsible when utilities or other parties encounter contamination RP will continue to be responsible when utilities or other parties encounter contamination Compliance review is necessary Compliance review is necessary If managed properly, contamination should NOT prevent property transactions or reuse

Construction Projects: Balloon Tracks Minnie Street Connector Illinois Street Widening

5) Information Management Must be able to articulate useful information to the public regarding contaminated sites Must be able to articulate useful information to the public regarding contaminated sites In order to clarify potential liability considerations In order to clarify potential liability considerations Reduce economic impacts - adjacent and future property use/sale/development Reduce economic impacts - adjacent and future property use/sale/development Must know extent of impacts Must know extent of impacts Plume maps Plume maps Estimated areas of soil contamination Estimated areas of soil contamination

Summary Delineate Delineate CSM/Risk Evaluation CSM/Risk Evaluation IC Plan IC Plan Cleanup and Management Plan Cleanup and Management Plan

Milestones Milestones ADEC send letter requesting CSM and explanation ADEC send letter requesting CSM and explanation Need information on downgradient MSLUG wells (ADEC) Need information on downgradient MSLUG wells (ADEC) Contaminated site map with addresses – provide CIMMS website (ADEC) Contaminated site map with addresses – provide CIMMS website (ADEC) Workplan (provide schedule or work) – May 30 Workplan (provide schedule or work) – May 30 Need entry permit from railroad for drilling or sampling on railroad party Need entry permit from railroad for drilling or sampling on railroad party Need letter of consent from tenants Need letter of consent from tenants Off-site delineation (characterization) Off-site delineation (characterization) Preliminary CSM – Characterization report Preliminary CSM – Characterization report Wells, surface soil exposure, indoor air issues? Wells, surface soil exposure, indoor air issues? Groundwater sampling (third week April 2005) Groundwater sampling (third week April 2005) Product sample from Chevron and Railroad Product sample from Chevron and Railroad Look into common lab – Look into common lab – Coordinate sampling protocol (document that this will happen in the workplan) Coordinate sampling protocol (document that this will happen in the workplan) Share data for interpretation by each party Share data for interpretation by each party Janice – ADEC contact Janice – ADEC contact

FAIR – Solvents at North End (HIDE)