IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.

Slides:



Advertisements
Similar presentations
Extra Large Telescope Wind Engineering. Wind and Large Optical Telescopes Wind is a key factor in the design of large telescopes: larger wind-induced.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Joel V. Madison Ebara International Corporation Cryodynamics Division Sparks, NV AIChE Spring Meeting April 26-30, 2009 Tampa, Florida.
Vacuum Vessel Production Readiness Review
Pipe Supports and Restraints
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
CHE/ME 109 Heat Transfer in Electronics LECTURE 7 – EXAMPLES OF CONDUCTION MODELS.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Applied Precision Design 1 of 8 Strictly Confidential Design Portfolio: Applied Precision Design, LLC Amir Torkaman Jamie Nam 155 Acalanes Dr Suite #23.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
PEEM III Endstation Design Review
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
1 Jun Watanabe R&D status of highly efficient Stirling-type cryocooler for superconducting drive motor J Watanabe, T Nakamura, S Iriyama, T Ogasa,
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
October 27-28, 2004 HAPL meeting, PPPL 1 Overview of the Components of an IFE Chamber and a Summary of our R&D to Develop Them Presented by: A. René Raffray.
LISA STUDIES AT THE UNIVERSITY OF COLORADO Michael J. Nickerson, Ellery B. Ames, John L. Hall, and Peter L. Bender JILA, University of Colorado and NIST,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Physics Jeopardy 2nd Trimester Review
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
PicoTRAIN IC Only oscillator (no MOPA design)  more simplicity and reliability Dimensions: 480*200*101.6mm3 ongoing volume production High stability.
HAPL Concepts and Requirements for GIMM Structures Thomas Kozub, Charles Gentile, Irving Zatz - PPPL Mohamed Sawan - FTI UW John Pulsifer, Mark Tillack.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Applied Precision Design 1 of 8 Strictly Confidential HIGH TEMP ROTARY SPINDLE IN VACCUM MULTI-AXIS SHUTTER MECHANISM RELIABILITY CYCLING TEST-BED MECHANISM.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 LHC-DFBX Shipping Specification Steve Virostek LBNL Presented at the DFBX RFP Review October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
HAPL Concrete Shielding Requirements Mohamed Sawan UW Fusion Technology Inst. HAPL Project Meeting UW-Madison October 22-23, 2008.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Engineering Division 1 M321/M331 Mirror Switchyard Design Review Tom Miller
An alternative spectrograph mount Bruce C. Bigelow University of Michigan Department of Physics 5/14/04.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Copyright by Team 5- Group Document contains personal property from a team effort and Patent Protection will be supported, this is a message of intent.
Requirements for Cryomodule What have to be inevitably realized?
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
1 Computational Modeling of Magnetic Intervention D. V. Rose* Voss Scientific, LLC A. E. Robson, J. D. Sethian, and J. L. Giuliani Naval Research Laboratory.
January 5, 2006 at Fermilab1 LAr TPC Wire Experiments B. Hansen.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Kinematic Mount Design of Line Replaceable Units at the National Ignition Facility ME Precision Machine Design - Dr. Furman April 8, 2003 Dennis.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Possible italian contributions to the IAXO telescope structure M.Riva.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
WELCOME.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
St. George Infrastructure
Requirements for Efficient CW SRF Cryomodules
Light-Matter Interaction
Neutronics Issues for Final Optics of HAPL Mohamed Sawan, Ahmad Ibrahim, Tim Bohm, Paul Wilson Fusion Technology Institute University of Wisconsin,
Produktentwicklung und Maschinenelemente
Concepts and Requirements for GIMM Structures
Vertex Detector Mechanical R&D Design Questions and Issues
PUMPS AND DRIVERS NCCER
Presentation transcript:

IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL

HAPL 2 Overview Conceptual Development of an Integrated IFE Facility Structural Design Incorporates Several Interconnected Design Requirements: –Basic Structure for Facility Core –Provide Stable Platform for Optics –Provide Necessary Shielding –Incorporate Methods for Plant Servicing –Meet all Regulatory Requirements All Elements are Integrated into an Single Efficient Design

HAPL 3 Conceptual Structural Design (with current MI core design)

HAPL 4 View with Dome and Outer Wall Removed

HAPL 5 IFE Plant Model Section Views

HAPL 6 Generic Structural Design Major facility dimensions are fixed as determined by optical geometry and shielding requirements Any reactor chamber core design that fits within the 40m diameter bio-shield can be accommodated with this design Integrated multifunctional use of components to efficiently meet multiple requirements

HAPL 7 Fundamental Design The basic design is very simple, a combination of spheres and cylinders. The inner most concrete structural component is the spherical “bio-shield” which contains and supports the reaction chamber and all associated components. The bio-shield is contained within a larger structural sphere composed of the interconnected GIMM outer supports struts and connected to the bio-shield through the GIMM shielding units. This spherical GIMM shield support structure is integrated into a series of cylinders carrying the load to the foundation. These cylinders are interlinked with radial arches.

HAPL 8 Fundamental Design For the tulip magnetic intervention concept, the suggested vessel chamber is a cylinder with hemispherical ends. This geometry will contain all necessary core components while minimizing vacuum volume and will fit completely through the service opening.

HAPL 9 Analysis Methodology Optimize the static structural design to withstand dead loads and mechanical loads. Perform a modal and, if necessary, a frequency and transient analysis to determine the structural adequacy of the design subjected to dynamic loads. If necessary, optimize the design of GIMM and other relevant components to assure performance will be within the specified displacement and vibration criteria. Optimize material utilization and function.

HAPL 10 FEA Model

HAPL 11 Optical Platform Stability Design Requirements: –Static support of the GIMM structures to the facility's foundation. –Structural elements to maintain stability and alignment within the prescribed tolerances of the optical components. –A GIMM base that provides a mirror surface flatness to a quarter wavelength. –Elimination of high frequency vibration at GIMM that is beyond the dynamic tracking response of the steering mirrors. –Methods for mounting the GIMM within the vacuum beam duct at the several various required orientations. –Necessary features for the installation, adjustment, servicing and replacement of the GIMM components.

HAPL 12 Current GIMM Geometry Drawing by Malcolm McGeoch

HAPL 13 GIMM Structural Shielding Block Unit Section

HAPL 14 GIMM Vibration Isolated Base Support

HAPL 15 GIMM Shield Units form an Integrated Structural Component of the Facility Providing the Dual Functions of Load carrying structure and shielding

HAPL 16 Sources of Vibration Reducing the sources of vibration to an minimum is as important as the attenuation of vibration. Sources of vibration grouped by strength of coupling to the GIMM: –Sources acting directly on the GIMM. –IFE Process sources acting on the central core structure. –Facility and other sources dispersed throughout the plant.

HAPL 17 Sources of Vibration Acting Directly on the GIMM Thermal shock from target detonation –Impulse at rate ~5Hz Thermal shock from laser pulse –Impulse at rate ~5Hz Flow of GIMM coolant –Continuous source Electromagnetic effects –To be determined

HAPL 18 IFE Process Sources of Vibration Through the Facility Structure Target detonation impulse –Ion, radiation and thermal impulse at ~5Hz Magnetic Intervention field pulse –Field force response into structure at ~5Hz

HAPL 19 Facility and Other Sources of Vibration Rotating machinery: pumps, motors, etc. Valves operating Fluid flow through pipes Transformers and other electrical devices Elevators, cranes, trucks, doors External sources through foundation Atmospheric and Seismic

HAPL 20 Primary Servicing Design Dome incorporates a large crane with a 1500 ton capacity (Typical “ship yard” type) Upper level platform for locating large service components of up to 1500 ton each Upper four GIMM shield units are removable Bio-Shield incorporates a 22m removable plug for vessel access

HAPL 21 Example illustrations with and without removable core components

HAPL 22 Major Service Loads (Current MI Design) Mirror Shield Unit1200 ton Bio-Shield Plug1100 ton Vessel Dome500 ton Vessel Cylinder1000 ton MI Core Components<500 ton each

HAPL 23 Conclusions This design strategy provides a scalable and flexible approach to meeting the structural requirements of an evolving project. This design efficiently incorporates the required shielding materials into the core structure providing increased stability and functionality This design rigidly binds together critical components and infrastructure while minimizing the effects vibration.

HAPL 24 Future work Complete static load and vibration mode finite element analysis Optimization and volume reduction of structural elements GIMM mounting: –Vibration isolator design –Refinement of the GIMM shield units –Cooling methods minimizing vibration –Servicing features and details Integrated facility structural details