April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: 6.5.7.1.11 Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
Real-Time Transmission Congestion Management & Market Effects
February 2012 CMWG Constraints Competitiveness Tests (CCT)
EE 369 POWER SYSTEM ANALYSIS
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Proposed Revision to the Shadow Price Cap and Power Balance Penalties in SCED Same Transmission Element.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
SCED Security Constrained Economic Dispatch Linear vs. Quadratic Programming Model.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Chad Thompson, ERCOT Special ROS PGRR011 Workshop October 21 st, 2011 SCED Overview and Results.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
1 WMS Report TO TAC April 2007 (which is in March)
1 Nodal Stabilization Market Call December 27, 2010.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT/IMM/PUCT Proposal for Redaction of State.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Market Trials Update NATF March 2,
Exceptional Fuel Costs in LMP
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
RTDF Overview of Data Analysis & Status of “Consesus Items”
ERS Procurement Methodology
Congestion Management and Ramp Rate for Delivering Ancillary Services
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
ECEN 460 Power System Operation and Control
LMP calculations Congestion evaluation
ECEN 460 Power System Operation and Control
Presentation transcript:

April, 2008 Maximum Shadow Price

April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow Price for each constraint as part of the definition of contingencies. The cost calculated by SCED to resolve an additional MW of congestion on the constraint is limited to the maximum Shadow Price for the constraint. ERCOT shall develop a policy for setting maximum Shadow Prices for approval through the PRR process.

April, 2008 Need for Maximum Shadow Price: Maximum Shadow Price limits the cost of resolving the constraints. i.e for a given energy offer curve, it prevents dispatching Resources with Shift Factor below a certain level. for a given Shift Factor, it prevents dispatching Resources with offer above a certain price. i.e. indirectly putting a upper limit on the energy offer and lower limit on the shift factor of the resources selected for re-dispatching to resolve the constraint. The relative value of the Maximum Shadow Price determines the priority order in which the constraints will be violated by SCED if needed.

April, 2008 Effects of Maximum Shadow Price value: It is the coefficient of the slack variable corresponding to the constraint in the SCED objective function. i.e. it is the maximum allowed increase in production cost for resolving 1MW of the constraint. Objective = Min ( Cost of generation dispatch + Sum ( Max Shadow Price * Slack variable) LMP at any electrical bus is Energy Component = Shadow price of Power Balance constraint + Congestion Component = - sum ( Shift Factor * Shadow Price for the constraint )

April, 2008 Zonal Vs Nodal : The nodal prices could be much higher than what we get in zonal. Some of the factors are In Zonal Only Zonal Congestion affects the price Shift Factors are fixed and low Ramp Rate can be violated Ramp Rate is not reserved for AS In Nodal All constraints will affect price There will be electrical buses with +1 and others with -1 HDL/LDL constraints can not be violated SURAMP = Normal ramp rate – regulation responsibility / 5

April, 2008 Finding the right value: Difficulties in finding the right value: If the value is too low then most constraints will be violated in SCED. If it is too high then –Resources with very low shift factor will be moved for solving the constraint and –drastic increase in price could happen for negligible increase in reliability. We need to resolve the constraints passed to SCED since only those constraints that need to be resolved are passed to SCED.

April, 2008 Constraint Processing: TCM –Constraints are passed to SCED only if they are approved by the operator. Several processes help determine the severity of the constraint RTCA –SPS/RAP implementation –SPS / RAPs associated with the monitored element/ contingency are implemented and color coded if the violation can be resolved by the SPS / RAPs DRAP –Develops generation dispatch patterns for resolving constraints. –Violations lower than load shed limit that can be removed by generation dispatch during the next SCED cycle are color coded

April, 2008 Constraint Processing: Operators should only pass the post contingency violations that can not be resolved by RAP/SPS/DRAP. RAPs should be implemented before a base case violation is passed to SCED. SPSs will be implemented automatically when the contingency happens RTCA – SPS/RAP DRAPTCMSCED Operator

April, 2008 Calculating the value: Typical maximum heat rate in ERCOT – 16 MMBTU/MWhr Average fuel Index Price – $7.00 per MMBTU Typical maximum Energy Offer Curve – $112 / MWhr (16*7) If SCED needs to move a Resource with 0.03 Shift Factor when Energy Offer Curve is equal to or less than $111 / MWhr, then the maximum Shadow Price should be $3700 (111/0.03)

April, 2008 For simplicity reasons ERCOT proposes to assign default maximum Shadow Price to monitored elements based on voltage level along with assigning higher or lower values based on operational experience. Default value for different kV levels 69kV – 2800 (~ 111/0.04) 138 kV – 3700 (~ 111/0.03) 345 kV – 5600 (~112/0.02) Proposed Maximum Shadow Price :

April, 2008 Variation from default values: In current EDS market trial, the Maximum Shadow Prices are hard coded based on the voltage level of monitored element. We are working on a design in which the values can be changed from the default values and stored at a monitored element level. ERCOT plans to do periodic evaluation of the Maximum Shadow Price and adjust it accordingly. ERCOT, with input from CMWG, will present an NPRR that will define the methodology for setting the Maximum Shadow Price and for periodic review of these Maximum Shadow Prices.

April, 2008 Special Cases : Voltage Collapse / Base Case Violation Voltage Collapse / Base case violation needs to be resolved for system reliability To move resources with Shift Factor >0.05 even at SWCAP, the Max Shadow Price should be (3000/.05) But this could result in very high price.

April, 2008 Example: Consider an electrical bus with 5 lines and a load connected to it. If the 3 lines are violated at the base case and SCED is unable to resolve these constraints and Maximum Shadow Price for base case is set to then the LMP at the electrical bus will be of the magnitude of 3*60000 = [ Energy Cost – (-1* * * 60000)]

April, 2008 A reasonable value of maximum Shadow Price ($6000) for Voltage Collapse and Base Case violation was developed after discussion with market monitor For SCED to move a Resource up with energy offer of $112/MWhr and Shift Factor >0.02 and to move a Resource down at $-10/MWhr with no shift factor to the constraints, the max shadow price should be ( )/0.02 ~ 6000 Special Cases : Voltage Collapse / Base Case Violation

April, 2008 Special Cases : Power Balance Power Balance constraint should never be violated and hence the maximum shadow price for it should be a relatively high number. It is set to $100,000 in the current EDS market trial environment. Effect: If the Power Balance constraint is violated then the prices will be of the order of $100,000.

April, 2008 Next steps : CMWG will meet on April 28 th and will discuss the CCT process, the CSCs for 2009 and the development of maximum shadow price cap(s) used in SCED. NPRR will be developed based on the discussion.