A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.

Slides:



Advertisements
Similar presentations
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Advertisements

Monday 24 May 2004DAPNIA/Pierre-Francois Honore1 DAPNIA site report.
Microsoft Terminal Server at CLRC Current Use and Future Plans Chris Brew Thanks to Mark Enderby (SRD), Tony Valente (ISIS) and Mike Waters (ITD) for extra.
Liverpool HEP – Site Report May 2007 John Bland, Robert Fay.
Liverpool HEP - Site Report June 2008 Robert Fay, John Bland.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH Home server AFS using openafs 3 DB servers. Web server AFS Mail Server.
LAL Site Report Michel Jouvin LAL / IN2P3
23rd April 2002HEPSYSMAN April Oxford University Particle Physics Site Report Pete Gronbech Systems Manager.
Birmingham site report Lawrie Lowe HEP System Managers Meeting, RAL,1 st July 2004.
UCL HEP Computing Status HEPSYSMAN, RAL,
24-Apr-03UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS SECURITY SOFTWARE MAINTENANCE BACKUP.
Winnie Lacesso Bristol Site Report May Scope User Support / Servers / Config Security / Network UKI-SOUTHGRID-BRIS-HEP Upcoming: major infrastructure.
RAL Particle Physics Dept. Site Report. Gareth Smith RAL PPD About 2 staff mainly on windows and general infrastructure About 1.5 staff on departmental.
Computing Infrastructure
Chris Brew RAL PPD Site Report Chris Brew SciTech/PPD.
Martin Bly RAL CSF Tier 1/A RAL Tier 1/A Status HEPiX-HEPNT NIKHEF, May 2003.
Birmingham site report Lawrie Lowe: System Manager Yves Coppens: SouthGrid support HEP System Managers’ Meeting, RAL, May 2007.
Site Report HEPHY-UIBK Austrian federated Tier 2 meeting
Virtual Network Servers. What is a Server? 1. A software application that provides a specific one or more services to other computers  Example: Apache.
PPD Windows update 2009 Christmas lecture (16/12/2009) By Kevin Dunford.
SouthGrid Status Pete Gronbech: 4 th September 2008 GridPP 21 Swansea.
Gareth Smith RAL PPD HEP Sysman. April 2003 RAL Particle Physics Department Site Report.
Edinburgh Site Report 1 July 2004 Steve Thorn Particle Physics Experiments Group.
UCL Site Report Ben Waugh HepSysMan, 22 May 2007.
Laptops and Computer Security Gareth Smith. Current Situation in PPD Standardised on Dells (D400, D600) Total bought to date by department: ~50. Loan.
PPD & CLRC's response to the (IS) Security Threat Gareth Smith PPD/CG Christmas Lectures 2002.
27/04/05Sabah Salih Particle Physics Group The School of Physics and Astronomy The University of Manchester
US ATLAS Western Tier 2 Status and Plan Wei Yang ATLAS Physics Analysis Retreat SLAC March 5, 2007.
RAL PPD Site Update and other odds and ends Chris Brew.
Southgrid Technical Meeting Pete Gronbech: 16 th March 2006 Birmingham.
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
HEPiX/HEPNT TRIUMF,Vancouver 1 October 18, 2003 NIKHEF Site Report Paul Kuipers
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
28 April 2003Imperial College1 Imperial College Site Report HEP Sysman meeting 28 April 2003.
RAL PPD Computing A tier 2, a tier 3 and a load of other stuff Rob Harper, June 2011.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Architecture and ATLAS Western Tier 2 Wei Yang ATLAS Western Tier 2 User Forum meeting SLAC April
Mobile Computing for Mac Users By Alan Doo PPD Christmas Lectures 2009.
1st July 2004HEPSYSMAN RAL - Oxford Site Report1 Oxford University Particle Physics Site Report Pete Gronbech Systems Manager.
Manchester Site report Sabah Salih HEPP The University of Manchester UK HEP Tier3.
Tier1 Andrew Sansum GRIDPP 10 June GRIDPP10 June 2004Tier1A2 Production Service for HEP (PPARC) GRIDPP ( ). –“ GridPP will enable testing.
The DCS lab. Computer infrastructure Peter Chochula.
Brunel University, School of Engineering and Design, Uxbridge, UB8 3PH, UK Henry Nebrensky (not a systems manager) SIRE Group.
26/4/2001LAL Site Report - HEPix - LAL 2001 LAL Site Report HEPix – LAL Apr Michel Jouvin
RAL Site report John Gordon ITD October 1999
RAL Site Report John Gordon HEPiX/HEPNT Catania 17th April 2002.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
Gareth Smith RAL PPD RAL PPD Site Report. Gareth Smith RAL PPD RAL Particle Physics Department Overview About 90 staff (plus ~25 visitors) Desktops mainly.
11th October 2012Graduate Lectures1 Oxford University Particle Physics Unix Overview Pete Gronbech Senior Systems Manager and GridPP Project Manager.
ClinicalSoftwareSolutions Patient focused.Business minded. Slide 1 Opus Server Architecture Fritz Feltner Sept 7, 2007 Director, IT and Systems Integration.
Macromolecular Crystallography Workshop 2004 Recent developments regarding our Computer Environment, Remote Access and Backup Options.
January 30, 2016 RHIC/USATLAS Computing Facility Overview Dantong Yu Brookhaven National Lab.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
Tier1A Status Martin Bly 28 April CPU Farm Older hardware: –108 dual processors (450, 600 and 1GHz) –156 dual processor 1400MHz PIII Recent delivery:
Scientific Computing in PPD and other odds and ends Chris Brew.
The RAL Tier-1 and the 3D Deployment Andrew Sansum 3D Meeting 22 March 2006.
TCD Site Report Stuart Kenny*, Stephen Childs, Brian Coghlan, Geoff Quigley.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
RAL Plans for SC2 Andrew Sansum Service Challenge Meeting 24 February 2005.
HEPSYSMAN Summer June 2017 Ian Loader Chris Brew
LCG Deployment in Japan
Grid Computing for the ILC
Glasgow Site Report (Group Computing)
UK GridPP Tier-1/A Centre at CLRC
HEPSYSMAN Summer th May 2019 Chris Brew Ian Loader
HEPSYSMAN Summer June 2017 Ian Loader Chris Brew
Presentation transcript:

A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD

RAL PPD About 90 staff, plus visitors Computing Support is: –About 2 staff mainly on windows and general infrastructure – About 1.5 staff on departmental Linux and Tier 2. – Part of one manager – Year in Industry (gap year) student summer 05 – summer 06.

Desktops & Laptops Desktop Policy is Windows XP on desktop with access to Linux systems via X-server (eXceed). –Windows systems updated using Update Expert 3 rd party tool. Small number of Linux systems on desktop, some users have two systems. Sprinkling of MACs Laptops Standardised on Dell Latitude series. Select model according to users need.

Servers Make use of central CLRC services (Exchange, PPTP) as well as AFS cell. Windows servers: –File, Print, DHCP, anti-virus (Sophos) repository, Terminal Server for some special apps (Citrix), Web (Includes hosting –Backup via ADIC Scalar 24 loader and SDLT. Linux servers: –File, web, CVS –Backup to RAL tape store Upgrading main Windows and Linux departmental servers (file and web) to Dell rack mount servers (PowerEdge 1850, Dual 3Ghz Xeon) with PowerVault 220 disk arrays (300GB SCSI disks).

Organisational changes in CCLRC Fit for the Future Combine departments into business units PPD combined with Space Science. Business (Windows) computing will be supported by a group at the business unit level. Two staff moved into this group.

Scientific Computing Grid/Departmental Unix Combined the General User (heplnx) service with the Grid UIs –3 x Dual 1.4 GHz PIII Usual Grid Services: –CE, (dCache) SE, RGMA, LFC, NetMON, Kickstart/PXEboot, ganglia and 44 WNs –Generally 100% CPU Occupation –Disk utilisation currently 10%

2005/6 Grid Purchase Quadruple Purchase –Delayed 2004/5 Purchase + Lab Infrastructure funds –Avoided EU tender by piggybacking the Tier 1 tender Order ended up being of comparable size to T1 –52 x Dual Core Dual CPU Opteron WNs –8 x 8TB SATA RAID servers (Areca controller) Also need power work in our Machine Room Order placed 7/2/06 for with target delivery 15/3/06 and a deadline of 20/03/06

Problems Slipping delivery: –15/3 and 20/3 missed –10% Delivered 10/4 –Still awaiting rest Hardware Issues –Raid Servers: Hot System Disk –CPU Boxes: Motherboard/Memory Electrical Work Backlog –due to end of year spend –Should go ahead this week

Room for Expansion