Exploiting the Grid to Simulate & Design the LHCb Experiment Eric van Herwijnen (CERN) Glenn Patrick (Rutherford Appleton Laboratory) National e-Science.

Slides:



Advertisements
Similar presentations
Ying Ying Li Windows Implementation of LHCb Experiment Workload Management System DIRAC LHCb is one of the four main high energy physics experiments at.
Advertisements

CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001
Slide 1 Steve Lloyd Grid Brokering Meeting - 4 Dec 2006 GridPP Steve Lloyd Queen Mary, University of London Grid Brokering Meeting December 2006.
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Tony Doyle GridPP – Project Elements AstroGrid Meeting MSSL, 26 Jun 2002.
Tony Doyle Executive Summary, PPARC, MRC London, 15 May 2003.
Stephen Burke - WP8 Status - 9/5/2002 Partner Logo WP8 Status Stephen Burke, PPARC/RAL.
ATLAS/LHCb GANGA DEVELOPMENT Introduction Requirements Architecture and design Interfacing to the Grid Ganga prototyping A. Soroko (Oxford), K. Harrison.
GridPP Building a UK Computing Grid for Particle Physics A PPARC funded project.
David Britton, 28/May/ TeV Collisions 27 km circumference m 8.36 Tesla SC dipoles 8000 cryomagnets 40,000 tons of metal at -271c 700,000L.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
LHCb Bologna Workshop Glenn Patrick1 Backbone Analysis Grid A Skeleton for LHCb? LHCb Grid Meeting Bologna, 14th June 2001 Glenn Patrick (RAL)
11 th RAL Masterclass Introduction Glenn Patrick Rutherford Appleton Laboratory 12 – 14 March 2008.
LHCb(UK) Meeting Glenn Patrick1 LHCb Grid Activities in UK LHCb(UK) Meeting Cambridge, 10th January 2001 Glenn Patrick (RAL)
Why LHC? Tara Shears, University of Liverpool. To understand the universe … Fundamental particles atoms stars and galaxies NOW Investigate with astrophysics,
Voodoo D0 on EDG. Get certificate certificate.nikhef.nl Organization nikhef ? Open ssl necessary on dors?
EU 2nd Year Review – Jan – Title – n° 1 WP1 Speaker name (Speaker function and WP ) Presentation address e.g.
INFSO-RI Enabling Grids for E-sciencE Workload Management System and Job Description Language.
The Biggest Experiment in History. Well, a tiny piece of it at least… And a glimpse 12bn years back in time To the edge of the observable universe So.
CERN The European DataGrid Project Technical status Bob Jones (CERN) Deputy Project Leader.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
The LHC Computing Grid Project Tomi Kauppi Timo Larjo.
Production Planning Eric van Herwijnen Thursday, 20 june 2002.
Using The EDG Testbed The European DataGrid Project Team
11 Dec 2000F Harris Datagrid Testbed meeting at Milan 1 LHCb ‘use-case’ - distributed MC production
Exploiting the Grid to Simulate and Design the LHCb Experiment K Harrison 1, N Brook 2, G Patrick 3, E van Herwijnen 4, on behalf of the LHCb Grid Group.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
Particle Physics and the Grid Randall Sobie Institute of Particle Physics University of Victoria Motivation Computing challenge LHC Grid Canadian requirements.
Petabyte-scale computing challenges of the LHCb experiment UK e-Science All Hands Meeting 2008, Edinburgh, 9 th September 2008 Y. Y. Li on behalf of the.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
LHCb Applications and GRID Integration Domenico Galli Catania, April 9, st INFN-GRID Workshop.
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
8th November 2002Tim Adye1 BaBar Grid Tim Adye Particle Physics Department Rutherford Appleton Laboratory PP Grid Team Coseners House 8 th November 2002.
Nick Brook Current status Future Collaboration Plans Future UK plans.
DataGrid is a project funded by the European Union VisualJob Demonstation EDG 1.4.x 2003 The EU DataGrid How the use of distributed resources can help.
Nadia LAJILI User Interface User Interface 4 Février 2002.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
November SC06 Tampa F.Fanzago CRAB a user-friendly tool for CMS distributed analysis Federica Fanzago INFN-PADOVA for CRAB team.
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
J.J.Blaising April 02AMS DataGrid-status1 DataGrid Status J.J Blaising IN2P3 Grid Status Demo introduction Demo.
The European DataGrid Project Fabrizio Gagliardi EU DataGrid Project Leader CERN
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
The LHCb CERN R. Graciani (U. de Barcelona, Spain) for the LHCb Collaboration International ICFA Workshop on Digital Divide Mexico City, October.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
ATLAS is a general-purpose particle physics experiment which will study topics including the origin of mass, the processes that allowed an excess of matter.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
LHCb computing model and the planned exploitation of the GRID Eric van Herwijnen, Frank Harris Monday, 17 July 2000.
The EDG Testbed Deployment Details
Moving the LHCb Monte Carlo production system to the GRID
Gridifying the LHCb Monte Carlo simulation system
LHC DATA ANALYSIS INFN (LNL – PADOVA)
D. Galli, U. Marconi, V. Vagnoni INFN Bologna N. Brook Bristol
Hunting the Higgs Boson at the CERN Large Hadron Collider
CERN, the LHC and the Grid
LHCb Distributed Computing and the Grid V. Vagnoni (INFN Bologna)
Gridifying the LHCb Monte Carlo production system
Status and plans for bookkeeping system and production tools
Presentation transcript:

Exploiting the Grid to Simulate & Design the LHCb Experiment Eric van Herwijnen (CERN) Glenn Patrick (Rutherford Appleton Laboratory) National e-Science Centre 25th April 2002

Moun Yoke Vertex Shielding Tracker Calorimeters RICH-2 Coil Muon Detector RICH-1 LHCb Experiment Weight = 4,270 tonnes Magnet alone weighs 1500 tonnes! 18m x 12m x 12m 1.2 million electronic channels. Located 100m underground at the Large Hadron Collider (LHC). Due to start operation in 2006.

Large Hadron Collider – CERN, Geneva 7 TeV protons colliding with 7 TeV protons 27km circumference

8000 cryomagnets 8.3 Tesla magnetic field. 40,000 tons of metal cooled to -271°C 1.8 million Amperes without electrical dissipation 40 MWatts needed for cooling LHC Recreating the conditions seconds after the Big Bang 2835 bunches/beam protons/bunch 40MHz crossing rate

Netherlands Brazil France Germany Italy PRC Romania Spain Switzerland Ukraine UK PolandRussia Finland Design and construction of LHCb undertaken by 500 scientists from 48 institutes in 14 countries around the world. Studying the subtle differences between matter and anti-matter. Over 1000 million short-lived particles of matter and anti-matter called B and B-bar mesons will be studied at LHCb each year. In order to design the detector and to understand the physics, many millions of simulated events also have to be produced. b d B meson b d quarks

10 mm Typical decay of B o meson and anti-B o meson. Lifetime is only seconds. Travel a few millimetres before decaying into other particles which have to be detected.

DesignSimulation/Reconstruction Complex interactionsUnderstanding

Grid – A Single Resource Peta Bytes of data storage Many millions of events Many samples Distributed resources Many 1000s of computers required GRID A unified approach Worldwide collaboration Various conditions Heterogeneous operating systems

DataGrid Sites DataGrid Sites Dubna Moscow RAL Lund Lisboa Santander Madrid Valencia Barcelona Paris Berlin Lyon Grenoble Marseille Brno Prague Torino Milano BO-CNAF PD-LNL Pisa Roma Catania ESRIN CERN HEP sites ESA sites IPSL Estec KNMI (>40) Europe Status Testbed 1 Status

Update bookkeeping database Transfer data to mass store Data quality check Submit jobs remotely via Web Execute on farm Analysis

Using Grid Middleware and DataGrid Tools 1. Authentication grid-proxy-init 2. Job submission to DataGrid dg-job-submit 3. Monitoring and control dg-job-status dg-job-cancel dg-job-get-output 4. Data publication and replication globus-url-copy, GDMP 5. Resource scheduling – use of CERN MSS JDL, sandboxes, storage elements

Job Submission dg-job-submit /home/evh/sicb/sicb/bbincl jdl -o /home/evh/logsub/ bbincl jdl: # Executable = "script_prod"; Arguments = " ,v235r4dst,v233r2"; StdOutput = "file output"; StdError = "file err"; InputSandbox = {"/home/evhtbed/scripts/x509up_u149","/home/evhtbed/sicb/mcsend","/hom e/evhtbed/sicb/fsize","/home/evhtbed/sicb/cdispose.class","/home/evhtb ed/v235r4dst.tar.gz","/home/evhtbed/sicb/sicb/bbincl sh","/home /evhtbed/script_prod","/home/evhtbed/sicb/sicb dat","/home/evht bed/sicb/sicb dat","/home/evhtbed/sicb/sicb dat","/home/ evhtbed/v233r2.tar.gz"}; OutputSandbox = {"job txt","D ","file output","file err","j ob txt","job txt"};

Monitoring and Control

Job Local disk Compute Element globus-url-copy Replica Catalogue NIKHEF - Amsterdam CERN TESTBED REST-OF-GRID Job Storage Element replica-get publish register-local-file Storage Element mss Data Data Publishing & Replication

Publish Data on Storage Element Copy data file to storage element: globus-url-copy file:///${chemin}/L69999 gsiftp://lxshare0219.cern.ch/flatfiles/SE1/lhcb/L69999 Register stored data in the catalogue: /opt/globus/bin/globus-job-run lxshare0219.cern.ch /bin/bash -c "export GDMP_CONFIG_FILE=/opt/edg/lhcb/etc/gdmp.conf;/opt/edg/bin/gdmp_register_ local_file -d /flatfiles/SE1/lhcb" Publish catalogue: /opt/globus/bin/globus-job-run lxshare0219.cern.ch /bin/bash -c "export GDMP_CONFIG_FILE=/opt/edg/lhcb/etc/gdmp.conf; /opt/edg/bin/gdmp_publish_catalogue -n"

Resource Scheduling: Use of CERN MSS Copy output to MSS: rfcp L /castor/cern.ch/lhcb/mc/L JDL to specify use of CERN MSS: Executable = "script_prod"; Arguments = " ,v235r4dst,v233r2"; StdOutput = "file output"; StdError = "file err"; OutputSE = "lxshare0219.cern.ch"; InputSandbox = {"/home/evhtbed/scripts/x509up_u149","/home/evhtbed/sicb/mcsend", "/home/evhtbed/sicb/fsize","/home/evhtbed/sicb/cdispose.class","/ home/evhtbed/v235r4dst.tar.gz","/home/evhtbed/sicb/sicb/bbincl sh","/home/evhtbed/script_prod","/home/evhtbed/sicb/sicb dat","/home/evhtbed/sicb/sicb dat","/home/evhtbed/sicb /sicb dat","/home/evhtbed/v233r2.tar.gz"}; OutputSandbox = {"job txt","D ","file output","file er r","job txt","job txt"};

Analysis Improved Design