Rio Vista Park: GPS Inventory & Land Management Brian SingerJohn Elkins Amy CogdillChris Rollins.

Slides:



Advertisements
Similar presentations
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Advertisements

Texas Hydrological Innovations Group: Ben Bates, Jason Pickett, Mark Pillion, Yasmin Sierra.
Proposal to Create and Implement a Geodatabase for Freeman Center, Texas State University San Marcos, TX.
Evacuation Safety Planners * Jason HaycockRobert Broussard Colleen Grentz Project Manager Analyst & Webmaster Analyst & Project Designer.
World Printing Production Team members: Sean Whitehead,Project Manager William Shamburg,Asst. Project Manager Regan Presley,GIS Analyst Erik Olden,GIS.
Progress Report : Design and Creation of a Geodatabase on the Colorado River Refuge Owned by Pines and Prairies Land Trust Arma-Geo Products Geography.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 20 – 11 – 2011 College Of Computer Science and Information, Information Systems.
Visions of a Truly Green Eugene GIS 248 Final Project By: Lindsey Mendell.
Graphic Vision of Environment Threat in New Orleans Area after Katrina Student: Ke Yang Mentors: Dr. Wendy Zhang, Dr. Ju Chou COMPUTER SCIENCE, COLLEGE.
Background: This study is part of a broader research ‘Development of a decision support system (DSS) and data needs for the Beaver Lake watershed.’One.
GIS On A Budget: Simple Applications for Real World Solutions Marty Scholl Calaveras County Environmental Health 10 th Annual LEA/CIWMB Conference October.
UNDERSTANDING SPATIAL DISTRIBUTION OF ASTHMA USING A GEOGRAPHICAL INFORMATION SYSTEM Mohammad A. Rob Management Information Systems University of Houston-Clear.
Rebecca Boger Earth and Environmental Sciences Brooklyn College.
COMPREHENSIVE DATABASE FOR SPRINGS IN TEXAS Prepared by: Ben Bates, Jason Pickett, Mark Pillion, Yasmin Sierra Status Report.
World Printing Production Team members: Sean Whitehead,Project Manager William Shamburg,Asst. Project Manager Regan Presley,GIS Analyst Erik Olden,GIS.
Prepared by: Jennifer McKee With support from: in partnership with: Introduction to ArcPad NSF DUE
Lecture 4 Data. Why GIS? Ask questions Solve a problem Support a decision Make Maps Involve others, share data, procedures, ideas.
The City of New Braunfels Parks and Recreations Asset Management Project.
Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
╬Cory Vardaman Project Manager ╬Joe Clark Assistant Manager ╬Lisa Albanese GIS Technician, Web Master ╬Ethan Roberts GIS Analyst, Graphics Design.
By: GeoTrek. Hunter Krenek: Remote Sensing analyst & GIS analyst Joe Dowling: Assistant Project Manager & GIS analyst Peter Vogt: Website Designer & GIS.
BaCon Makes Everything Better!. Ekaterina Troudonochina Julian Montejano Mark Hiler Veronica Gentile Team Manager Webmaster, GIS Analyst GIS Analyst Pwpt.
Tracy DeLiberty Department of Geography University of Delaware Kymberlie Kelly Civil Engineering Technology Delaware Technical.
TOURISM PLANNING OF ALMATY INFRASTRUCTURE IN GEOINFORMATION SYSTEMS Erkin H. KakymzhanovErkin H. Kakymzhanov.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
Jennifer ZingeryAbel AvilezKatie KunzAya Udagawa CONSULTANTS:
Katy Morris: Project Manager Nick Down: Assistant Manager Travis Hamel: GIS Analyst.
Proposal for Geodatabase on 5 Mile Dam Soccer Complex Daniel Cohen – Project Manager Samuel Boesch – Assistant Manager Mathew Riggan – GIS Consultant.
Rio Vista Park: GPS Inventory & Land Management Brian SingerJohn Elkins Amy CogdillChris Rollins.
Wimberley Market Days Progress Report Site Addressing and Management Analysis.
DeWitt County Emergency Response Handbook 1 of 14 Project Manager: Robert Gannon Assistant Project Manager: Matt Ahrens GIS Analyst: George Caracostis.
Flash Flood Pilot Project: Prepared for Texas Department of State Health Services and Texas Flash Flood Coalition Sarah Eason, Mark Tijerina, Cooper Sims,
Wendy Welch ADAPTING THE ARC HYDRO DATA MODEL AND TOOLS TO A HYDROGEOLOGIC FRAMEWORK KITSAP PENINSULA, KITSAP, MASON AND PIERCE COUNTIES, WASHINGTON.
San Marcos Municipal Airport Airspace Planning Project Prepared for: Texas Department of Transportation.
Evacuation Safety Planners * Jason HaycockRobert Broussard Colleen Grentz Project Manager Analyst & Webmaster Analyst & Project Designer.
Project Management Formal Methods. How do you monitor a project?
Utilizing Handheld GIS Technology Wisconsin Land Information Association Annual Conference.
 Affordable housing in San Marcos, TX is in short supply.  Housing is unavailable for certain income levels.  The ratios between rent-occupied and.
BaCon Makes Everything Better! Final Report. Ekaterina Troudonochina Julian Montejano Mark Hiler Veronica Gentile Team Manager Webmaster, GIS Analyst.
Introduction The Austin metro area is one of the fastest growing in the country – State Highway 130; easing the pressure – Study of Sections 5-6 How GTG.
Cody Clarke - Project Team Leader Sherry Priddy - Project Assistant Team Leader Jason Baker - Information Analyst Les Stewart - Data Collection Randy Guzman.
Jennifer ZingeryAbel AvilezKatie KunzAya Udagawa CONSULTANTS:
Mitigation of Urban Heat Island Effect via NeighborWoods Tree Program- Austin, Texas Project Manager-Clancy Taylor GIS Analyst/Web Designer-Will Johnston.
San Marcos Municipal Airport Airspace Planning Project Prepared for: Texas Department of Transportation.
San Marcos Flooding EAGLE Project Manager Justine Williams Assistant Manager Joshua Bridges Web Master Alexander Nankervis GIS Analysts David Smith David.
Fire Hydrant Analysis and Distribution Chayse Jackson and Robert Crigger.
Krystal Zwinggi Project Manager John McClintock GIS Analyst Lance English Webmaster Michael Stanley GIS Analyst.
W. E. T. Water Elevation Technologies David Lynch Project Manager Miriam Mosher GIS Analyst Jeff Gravett GIS Analyst Clinton Buehring GIS Analyst.
Peer Teaching Assignment CTCH 603 Chris Braun John Wallin.
City of Woodcreek, TX Project Proposal GEO 4427 Advanced GIS II.
GIS for the LEA Ted J. Terrasas, REHS Senior Environmental Health Specialist Monterey County Health Department November 8, 2005.
We thank the Office of Research and Sponsored Programs for supporting this research, and Learning & Technology Services for printing this poster. Where.
An Analysis of Land Use/Land Cover Changes and Population Growth in the Pedernales River Basin Kelly Blanton-Project Manager Paul Starkel-Analyst Erica.
Assessment of Hill Country Land Use: Records at the County Level Loma Environmental Strategies.
Daniel Cohen Matt Riggan Sam Boesch. Introduction  The five mile dam complex needs a geodatabase to keep up with modern technology when repairing features.
Campus Storm Water Proposal A Storm Water Solutions Project.
URBDP 422 Urban and Regional Geo-Spatial Analysis Lecture 4: GIS Applications to Solve Spatial Problems Team Work Time I: GIS Project January 16, 2014.
Logo Amy Jagge, Project Manager, GIS Analyst Steven Ferguson, Assistant Manager, GIS Analyst Blake Durant, GIS Analyst, GPS Tech Jacob Waterman, GIS Analyst,
TEXAS STATE (SAN MARCOS) MAP VISUALIZATION C TO 2015 PROJECT Proposal Submission to the Texas State University Archives 1 Project Manager: Christian.
Texas State (San Marcos) Campus Map Visualization, c Final Presentation by Project Manager: Christian T. Hartnett GIS Analysts: Corby Schaub.
DeWitt County Emergency Response Handbook 1 of 9 Project Manager: Robert Gannon Assistant Project Manager: Matt Ahrens GIS Analyst: George Caracostis.
References/Acknowledgments
Introduction City of San Marcos fastest growing city for 3rd consecutive year. Portions of San Marcos River designated State Scientific Area. City commitment.
Digitizing the San Marcos Cemetery
WVDOT Geospatial Transportation Information
Analyzing Inlets, Outfalls, and Land Cover Using Spatial and Network Analysis Within the San Antonio Sewershed Aspen Navarro, Project Manager, GIS Analyst.
About Austin Ridge Riders
Geospatial Resources Texas A&M University Cecilia Smith, Ph.D.
Digitizing the san Marcos cemetery
Introduction San Marcos Cemetery is a 45-acre plot located along Ranch Road 12, just West of the intersection of 12 and W Holland St. Some burials data.
Presentation transcript:

Rio Vista Park: GPS Inventory & Land Management Brian SingerJohn Elkins Amy CogdillChris Rollins

Introduction Central Texas Geospatial Consulting is working with the City of San Marcos to create an inventory of Rio Vista park features Further research will be done to solve the issue of impervious coverage in the park Impervious Cover - “concrete or asphalt, they can be roofs or parking lots, but they all have at least one thing in common – water runs off of them, not through them” (Frazer 2005) Potential Harm – “Impervious surfaces collect automobile contaminants, phosphates from residential and agricultural fertilizers, and dozens of other pollutants” (Frazer 2005) 2/25/20152CTGC

Scope 2/25/20153CTGC

Purpose The City of San Marcos needs a digital inventory of their parks and green spaces Construct a user-friendly inventory of park and green space features Provide suggestions to eliminate some of the negative outcomes from the impervious coverage around the park Helping the ecosystem of the river 2/25/20154CTGC

Minimize & Mitigate Porous Concrete/Asphalt Mulch Crushed rock Transformation of impervious cover Vegetation and rainwater collection 2/25/20155CTGC

Data Most of the data for this assignment will be collected in situ by CTGC, using a Trimble GeoXT GPS unit Park boundaries, river boundaries, GPS monuments for reference and the City’s own Land Development Code can all be downloaded from the City’s page Central Area Council of Governments, USGS and Ebsco 2/25/20156CTGC

Software Adobe Photoshop & Illustrator Microsoft Excel, PowerPoint and Word ArcMAP, Pathfinder, ERDAS Imagine and ArcGIS Online 2/25/20157CTGC

Timeline Phase I Data Collection Six Weeks Phase II Data Processing and Analysis Four Weeks Phase III Editing, Revision, Document Production Two Weeks 2/25/20158CTGC

Methodology Collect initial data from client and other sources Compile list of known features Collaborate with other City of San Marcos group Add feature list to database Test collection of single feature class, points, lines, polygons Revise database, adding and subtracting features Finish feature collection Merge our data dictionary with other group Begin analysis for the mitigation of impervious cover Measure existing impervious cover Investigate the spatial attributes of existing IC Research different options for mitigating IC Propose changes to IC, and model with maps 2/25/20159CTGC

Methodology Begin post processing of the data with emphasis on making the database as user friendly as possible Transfer GPS data into database Finally, assemble the following deliverables: amenity geodatabase, map of the park with feature classes, report and visual model of proposed changes to the IC 2/25/201510CTGC

Budget Services/ SalariesSupplies, Equipment, and Overhead Project ManagerArcGIS subscription: $600 $4500 for 20 days workTrimble GPS rental: $3750 Web Master/ ResearcherWorkstation rental: $7500 $4300 for 20 days workOffice supplies: $500 GIS TechnicianInsurance: $5000 $4300 for 20 days workTransportation: $1000 Researcher/ Editor $4300 for 20 days work Salaries Subtotal: $17,400Equipment Subtotal: $17,850 Total Budget: $35,250 2/25/201511CTGC

Conclusion Central Texas Geospatial Consulting will provide the City of San Marcos with: User friendly model Visual representation of the parks with the newly collected data Provide a visual representation of the proposed changes to the imperious coverage 2/25/201512CTGC

References Frazer, Lance. "Paving Paradise: The Peril of Impervious Surfaces." Environmental Health Perspective. 11 July Web. 12 Feb B. Corrozi, Martha, Gerald Kauffman, and Kevin Vonck. "Impervious Cover." Guide to Natural Resource Based Planning. Newark and Lewes, Print. 2/25/201513CTGC