M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair.

Slides:



Advertisements
Similar presentations
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 30, 2009 Eric Winkler, Ph.D. Project.
Advertisements

M&V Decision Tool Sub-Committee Report Venkat Kumar Satish Kumar FEMP-ESCO Meeting 6 th June, 2002 Palm Springs, CA.
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
A-16 Supplemental Guidance Document FGDC Annual Report Ken Shaffer FGDC Deputy Staff Director FGDC Coordination Group November.
TIA Engineering Manual 6 th Edition Preview and Overview.
1 Meeting Agenda Introduction Meeting Purpose Review CEST Mission & Organization Review Working Group Role Review Schedule Assignments Next Meetings Materials.
Using Uncertainty Modeling to Optimize M&V in ESPC Projects Discussion Document 10/31/02.
M&V Planning Working Group Update M&V Summit, New Orleans 5/5/03 Satish Kumar and Venkat Kumar.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
1 Load Research Sampling (LRS) Project Summary 12/16/2004.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Big Ten Sustainability Conference November 14-15, 2010 Funding Strategies: Energy Savings Projects and Seed Grants Funding Strategies.
1 SIMPLIFIED VOLTAGE OPTIMIZATION M&V PROTOCOLS Regional Technical Forum August 4, 2009.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
1 M&V Training M&V Summit 5 November 2002 Kansas City, MO.
DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Highlights from the FEMP Advanced Metering Workshop September 25, 2003 Golden, Colorado.
Project Plan. Project Plan Components Project Overview – Description and Strategy Business Case Summary Key Deliverables and Scope Critical Success Factors.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
Financial ESPC Training Work Session. Proprietary Information Of Energy 2013 Assistance from DOE National Laboratories FEMP works with DOE National Laboratories.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002.
Annual Reporting Working Group Update Lia Webster, Nexant New Orleans M&V Summit May 2003.
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
WYE CITY GROUP on Statistics on Rural Development and Agricultural Household Income Naman Keita FAO, Statistics Division Way forward for the Wye City Group:
M&V Reporting Lia Webster, Nexant. M&V Summit - Nov 2002 Current M&V Reporting - IDIQ Requirements (C.4.2): Post-Install M&V report –Contents to be specified.
Developing An Army INRMP Template Todd Wills Training Support Division Army Environmental Center 13 April R Mar2005Todd Wills / SFIM-AEC-TSR /
1 M&V Cx Working Group Report New York City - M&V Summit Steve Dunnivant - Chair This presentation will probably involve audience discussion, which will.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
Training Module: APD Template County APD Process Training November 16, 2007 California Health and Human Services Agency - Office of Systems Integration.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
COMET Working Group Progress Report. Purpose of Report Provide Team Updates Potential Future Voting Items Draft Competitive Meter Ownership Timeline.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Charlie Conner, Project Manager Performance Contract Energy Conservation Measures September 30, 2013.
Real Property Policy Update Planning and Development Committee August 4, 2015.
REPC Draft Consultant Contract September 25, 2009.
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Project Management PTM721S
Project Management PTM721S
Project Project Objective Component 1 Component 2 Component n …
The Federal programs department September 26, 2017
Implementation Strategy July 2002
Enterprise Content Management Owners Representative Contract Approval
CAFE SG 23 November Brussels
Digitization and Modernization Project
Far Experimental Hall Hutches Civil Construction
Start-Up Meeting <Project No. / Project Name>
CIC BIM Competition Presentation Template & Content Guide
Report of the Technical Subcommittee
Overview of The Bidder Response Form and Changes to the IT RFP Template March 8, 2019.
[Ballot code, contract number] [Project title]
Presentation transcript:

M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair

Working Group Highlights Date Formed: June 2003 Objectives: Create generic M&V plan Define minimum requirements for use in Federal sector Without constraint of existing contracts

Background on Goals Air Force developing recommended M&V strategies for specific ECMs Develop format for M&V plans first, then develop content Improve quality & uniformity of M&V across Federal sector

Draft Deliverables Ready! M&V Plan Outline Post-Installation M&V Report Outline

Development process Very aggressive schedule – WG formed at New Orleans Summit Consistent participation by ESCOs, PFs & Labs Compared FEMP format (existing) and Air Force format (under development) Identified shortcomings of existing formats

M&V Plan Development 3 sections: Executive Summary / M&V Overview Whole Project Data / Global Assumptions ECM Specific M&V Plan Baseline, post-install, and periodic activities separated for each ECM

M&V Plan Development M&V plan includes schedule and content for all M&V reporting items: Commissioning Plan Post-Installation M&V report Commissioning report Annual report Integration with Commissioning a challenge Place holder in M&V Plan to define Cx report format & content TBD by Cx working group

M&V Plan Development Uncertainty is included throughout Global – define requirements for uncertainty analysis ECM specific – variables impact on uncertainty O&M reporting requirements included Does not include repair & replacement or operation & maintenance requirements Define requirements for government witnessing Dispute resolution in Global section Executive Summary has % Total Site Usage Saved (if available)

Post-Installation M&V Report For DOE contract, post-installation M&V report is required and will contain Commissioning results For projects using Option A, most important M&V report Started with Annual Report Outline Included installation verification, commissioning results, and construction period savings

Next steps… Commissioning WG to define reporting requirements for inclusion in M&V Plan Outline WG recommends M&V Team accept & adopt package of draft deliverables Disband M&V Plan WG Consider creation of new WG to reconcile: M&V Plan Outline Post-Install Report Outline Annual Report Outline

Next Steps… Review for compliance with Army ESPC contracts Start using templates – include in DO RFP or similar FEMP will revise sample M&V plans into new format Consider drafts living documents and modify as needed (

Thanks for everyone’s hard work! Dave WardBonnie Piest Dale SartorMike Cross Lia WebsterDarryl Matsui Satish KumarRon Araujo Doug DahleBalaji Santhanakrishnan David WilliamsMax Hogan Scott JudsonEric Vaughn Steve DunnivantMark Stetz