April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Performance Appraisals
Enhance the Attractiveness of Studies in Science and Technology WP 6: Formal Hinders Kevin Kelly Trinity College Dublin WP 6 Co-ordinator.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan Plan Summary Comment Q&A June 17, 2011.
PROJECT RISK MANAGEMENT
N.Toge on SB20091 SB2009 Rebaselining Proposal Document - How do we get it done? /10/2 N.Toge (KEK) for SB2009 Efforts.
WP 6, Milan, 10 February,2011 Laura Currie, Fiona Godfrey.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
Quality Consulting Overview of Reports Module. Quality Consulting Dashboard Reports Dashboard Reports module provides project highlights for users of.
Web Design Project Plan Objective: –Get the new Web site to go live Approach: –Review current status –Identify remaining work –Prioritize remaining work.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
More on Data Mining KDnuggets Datanami ACM SIGKDD
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
Project Management Tools A Loose Guideline on how to use shovels and rakes at AIAA A presentation for New Hires October 6, 1999.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Lecture 32 Risk Management (Cont’d)
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
City of Watsonville Climate Action Plan and Carbon Fund Project Technical Advisory Committee Meeting #7 Final Meeting April 9, 2014.
Honors Level Course Implementation Webinar Honors Rubric and Portfolio Review Process October 7, 2013.
Hannover 9 February  Important professional, ethical, regulatory, cultural and other factors interact with financial incentives to influence provider.
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
Don Wells Hess Corporation
Operational Excellence in Effort Reporting Phase 3 Testing Information Meeting: June , 2012 Vision Statement: Implement a compliant, streamlined,
K E M A, I N C. TCA/KEMA ERCOT Cost Benefit Analysis Implementation Impacts Assessment ERCOT CBCG May 4, 2004.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
WLE Operations Update Emma Greatrix 11 March 2013 WLE Management Committee Meeting.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
APEC-TEL Broadband Study TEL03/2009A – status report Bangkok, May 20 th.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Introducing Project Management Update December 2011.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Feasibility Study.
An Update of COSO’s Internal Control–Integrated Framework
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
Curriculum Project for Information Extraction. Task definitions Task 1: Entity detection and recognition Task 2: Relation detection and recognition Both.
Work Package 6 2nd Consortium meeting, Provincia di Reggio Emilia, 3rd May.2011 Blaz Jemensek, PIL Klemen Gostic, PIL.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
GINA WP4.2 Business and Exploitation Plan March 10 th 2010 Lisbon GNSS for INnovative Road Applications.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Project Progress Tracking Advantages –Automatic request for reporting. –Uniform Reports available in a central location. –Management at all levels can.
John Carwardine Editing updates, pdf build for top-level editing LCWS session on TDR 1 TEB Webex: 8 th October Global Design Effort John Carwardine.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort Accelerator System Kick-off Meeting e- Summary Day 1 25 Sept 2007 SLAC Marc Ross.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
Template for CORAS Risk Analysis. The eight steps of a CORAS risk analysis.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
MODULE 6: PLANNING FOR GOVERNANCE AUDIT GOVERNANCE AUDITOR ACCREDITATION COURSE.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Preparation of the Self-Study and Documentation
On Campus Internship Work Plan Creation
Service Management World Class Operations - Impact Workshop.
Oct 22 Group Leaders Planning meeting
An Innovative Approach to Structured Onboarding Orientation for Nurses
LCLS Linac Technical Design Review Charge
CHANGE MANAGEMENT SYSTEM (CMS) PROCESS DOCUMENTATION
End of Fieldwork Debriefing
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
RF System (HLRF, LLRF, Controls) EDR Plan Overview
An Update of COSO’s Internal Control–Integrated Framework
Studio day : Monday February 4
European Commission, DG Environment Air & Industrial Emissions Unit
Presentation transcript:

April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007

Apr 1, 07 Global Design Effort S4: 2 For today’s discussion Preliminary conclusions from S4 –we have discussed the draft –will need to add more on ATF2 and other WPs –need to decide if will send this document to WP leaders now, to get more feedback The overall schedule table –we have discussed it –several more systems added Risk analysis in BDS –this document was not requested from S4, and is being prepared to address the cost risk analysis, however it may be useful to consider its implications for S4 EDR planning Work Packages, partners and resources in BDS –very rough draft without real resources numbers

Apr 1, 07 Global Design Effort S4: 3 Preliminary conclusions Open PDF file… –… –comments ?? –send to WP leaders ??

Apr 1, 07 Global Design Effort S4: 4 Open PDF for better view… –several systems added –comments? Overall schedule

Apr 1, 07 Global Design Effort S4: 5 Risk analysis in BDS … Primary goal, to evaluate BDS cost risk This document can have many uses … Timeline is incorporated into analysis –Assumption in RDR / Initial Risk –Mitigation / detection in EDR –Remaining probability of failure at the end of EDR & cost impact –Mitigation / detection in construction & commissioning –Probability of failure in construction & commissioning & final cost impact Open PDF file …

Apr 1, 07 Global Design Effort S4: 6 … Risk analysis in BDS There are comments for this analysis which are not yet implemented Are there categories which are missing?

Apr 1, 07 Global Design Effort S4: 7 WP description Include WP description; sub-description; Lab/University; name of WP leader; assignment status; category; FTE & M&S for (all numbers so far are placeholders) and certainty of status. Open Excel file …

Apr 1, 07 Global Design Effort S4: 8 WP description Various summary tables can be generated Open Excel file …

Apr 1, 07 Global Design Effort S4: 9 Discussion…