1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb.11 2004, PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

First Wall Heat Loads Mike Ulrickson November 15, 2014.
COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
T. YOSHIDA, J. OYAMA, T. HIGUCHI, T. ABE and T. HIRAYAMA Department of Electrical and Electronic Engineering, Nagasaki University, Japan ON THE CHARACTERISTICS.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
PXIE: SSR1 Section Focusing Lens 1.Requirements table 2.Developed at FNAL 3.Available from vendors 4.Used at ANL 5.Layout of the SSR1 cryomodule 6.Case.
Study on supporting structures of magnets and blankets for a heliotron-type fusion reactors Study on supporting structures of magnets and blankets for.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Talk outline 1 st talk: –Magnetic forces –Quench in the absorber cryostat 2 nd talk: –Shielding of magnetic fringe fields.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Stellarator magnets L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting March 8-9, 2004.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Test of the high voltage strength of Pelletron’s gas insulation (18-Dec-2008) Recycler Meeting January 21, 2009 A. Shemyakin.
1 Calorimeter Thermal Analysis with Increased Heat Loads September 28, 2009.
Status of CEPC Detector magnet
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
14 August Magnetic Field in the ATLAS Muon Spectrometer Masahiro Morii for the ATLAS Group Harvard University Laboratory for Particle Physics and.
Status of COBRA Magnet Wataru OOTANI MEG review meeting July 11 th, 2003 PSI Switzerland.
Status of the COBRA Magnet Wataru OOTANI MEG review meeting Feb. 3, 2003 PSI Switzerland.
SuperB Meeting, May 2008 Status of the magnetic design of the first quadrupole (QD0) for the SuperB interaction region S. Bettoni on behalf of the whole.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IR Quad Heaters.
Alain Hervé, ILD Workshop, Seoul 17 February 2009, 4365-ILD-T-Coil-Developments.ppt Possible Coil Developments ILD Workshop - SEOUL - 17 February 2009.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Magnet for ARIES-CS Magnet protection Cooling of magnet structure L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting UCSD January.
WAMSDO-2013, New Techniques, GdR WAMSDO, January 2013 Gijs de Rijk CERN 1 NEW TECHNIQUES.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Status of ATF Fast Kicker Experiment
1 RQ7000M High Speed Automatic machine for Fishing and Marine industry 24-Nov,2010.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
ATLAS LAr Forward Calorimeters C. Zeitnitz (Universität Wuppertal) for the ATLAS LAr Community.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Magnet Issues 1/19 Nov 2013 MICE MAGNET ISSUES Brief update on –Coupling Coils (CC) –Spectrometer Solenoids (SS) Both are US responsibilities Details of.
Soumen Kar 1,2, Xiao-Fen Li 1, Venkat Selvamanickam 1, V. V. Rao 2 1 Department of Mechanical Engineering and Texas Center for Superconductivity University.
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Sextupole Single Coil Test Results Giovanni Volpini on behalf of the LASA Team Giovanni Volpini, CERN, 22 April 2015.
AUGUST 3, 2010 BRYCE AUSTELL UNIVERSITY OF ILLINOIS FERMILAB SIST INTERN ADVISOR: RYUJI YAMADA Muon-to-Electron Conversion Experiment (Mu2e) Detector Solenoid.
Magnetics Program Highlights VLT Conference Call September 13, 2000 presented by J.V. Minervini MIT Plasma Science and Fusion Center.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
24 June 2013 GSI, Darmstadt Helmholtz Institut Mainz Bertalan Feher, PANDA EMP First Measurements for a Superconducting Shield for the PANDA Polarized.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Study of a Superconducting Shield for a Transverse Polarized Target for PANDA 2012 Paris Helmholtz Institut Mainz Bertalan Feher, PANDA EMP Session Status.
F. Kircher CLIC concept meeting 12/15/08 1 Some points about the superconducting magnet for a CLIC detector F. Kircher (CEA Saclay/DSM/Irfu/SACM) December.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Results from the cold test of the first QD0 prototype
BNL-SLAC-Annecy TeleConference
D1 and D2 powering and protection
Quench Simulation at GSI
MMI^2T limits for magnets, what are they and how where they developed
EuroCirCol: 16T dipole based on common coils
Pierre-Alexandre Thonet
Compact and Low Consumption Magnet Design The DESY Experience
Large aperture Q4 M. Segreti, J.M. Rifflet
Japan research of thermal propagation test
The superconducting solenoids for the Super Charm-Tau Factory detector
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
Review of Quench Limits
Electron Collider Ring Magnets Preliminary Summary
S. Bettoni on behalf of the whole team
Presentation transcript:

1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI COBRA Magnet Status

2 First Excitation Test in June’03 Summary First excitation test was carried out in Japan last June. The test was not completed because of some problems. Some of the quench protection heaters were burned. Cold spots on the cryostat inner wall. Superconducting magnet was tested up to 83% excitation. Compensation coils were successfully tested up to 110% excitation. Field measurement device was tested. Field profile in the bore and fringing field around photon detector region were roughly measured. Summary First excitation test was carried out in Japan last June. The test was not completed because of some problems. Some of the quench protection heaters were burned. Cold spots on the cryostat inner wall. Superconducting magnet was tested up to 83% excitation. Compensation coils were successfully tested up to 110% excitation. Field measurement device was tested. Field profile in the bore and fringing field around photon detector region were roughly measured.

3 First Excitation Test in June’03 Design field Measured field Graded field profile measured at 200A

4 Problems in First Test Protection heaters were burned. All heaters were replaced with larger heaters and back-up heaters were added. Cold spots on the cryostat wall Too thick super Insulation layers in narrow gap of the cryostat. Radiation shield cylinder was slightly displaced. Protection heaters were burned. All heaters were replaced with larger heaters and back-up heaters were added. Cold spots on the cryostat wall Too thick super Insulation layers in narrow gap of the cryostat. Radiation shield cylinder was slightly displaced. The problems were quickly fixed and the second excitation test was carried out last August.

5 Second Excitation Test The second test was done in Japan last August. The magnet was successfully tested up to 380A (5.6% higher than the operating current, 360A) No cold spot No protection heater was broken. The second test was done in Japan last August. The magnet was successfully tested up to 380A (5.6% higher than the operating current, 360A) No cold spot No protection heater was broken.

6 Quench Tests Quench propagation observed by voltage taps, temperature sensors and superconducting quench detectors (SQDs). Severest test: heater quench test at central coil at 360A. Quench induced by firing a heater in the central coil, which is the farthest coil from the refrigerator. DC OFF and quench protection heater ON after the quench is detected. Quench propagation observed by voltage taps, temperature sensors and superconducting quench detectors (SQDs). Severest test: heater quench test at central coil at 360A. Quench induced by firing a heater in the central coil, which is the farthest coil from the refrigerator. DC OFF and quench protection heater ON after the quench is detected. Quench was propagated in the magnet fast enough to keep ΔT and ΔV below the acceptable level.

7 SQD Reaction in Quench Test Time[msec] -130Heater at central coil is fired 0SQD reacted at central coil +54Protection heaters ON +74DC OFF +( )SQDs reacted at the other coils

8 Voltage Change in Quench Test Maximum voltage across the central coil of 1200V was observed ~500msec after the quench in the central coil.

9 Temperature Rise in Quench Test Temperature was peaked at 110K in the central coil 16sec after the quench occurred.

10 Mechanical Strength Strains in the central coil and support cylinder measured up to coil current of 380A. Fairly linear relation between strain and I 2 Strains in the central coil and support cylinder measured up to coil current of 380A. Fairly linear relation between strain and I 2 360A 380A Sufficient mechanical strength

11 COBRA arrived at PSI COBRA arrived at PSI Nov.12&13, Placed in SLS hall for the initial test before the installation in πE5, which is planned this April. System check after the transportation was carried out last December and no serious problem was found. COBRA arrived at PSI Nov.12&13, Placed in SLS hall for the initial test before the installation in πE5, which is planned this April. System check after the transportation was carried out last December and no serious problem was found. Main body Power supply, compressor, mapping machine, etc

12 Excitation Test at PSI COBRA is placed at Axis34-36 in SLS. Excitation test was done between Jan.17-27,2004. Full excitation for SC and 8% excitation for NC because of limited utility at SLS. COBRA is placed at Axis34-36 in SLS. Excitation test was done between Jan.17-27,2004. Full excitation for SC and 8% excitation for NC because of limited utility at SLS. COBRA in SLS hall MEG magnet team

13 Excitation Test at PSI COBRA seems to survive long journey from Japan. 5.6% over excitation was successfully done at PSI.

14 Excitation Test at PSI Mechanical strength Temperature Voltage Good performance was confirmed in quench test up to 360A.

15 Influence of Fringing Field PositionB requirement B COBRA GPS(πM32)< 20mG2~3G LTF(πM32)< 20mG~1G μLAN(πE3)< 1-2G4~5G πM3 beam line?5~10G COBRA COBRA fringing field would affect neighboring facilities.

16 What Can We Do? COBRA is placed inside shielding box Strong EM interaction bw/ shield and COBRA Destroy field suppression around photon detector Beam time sharing The beam lines are supposed to be used all the time. Iron walls between π E5 and neighboring beam line (passive shielding). Active shielding for each device in neighboring beam line COBRA is placed inside shielding box Strong EM interaction bw/ shield and COBRA Destroy field suppression around photon detector Beam time sharing The beam lines are supposed to be used all the time. Iron walls between π E5 and neighboring beam line (passive shielding). Active shielding for each device in neighboring beam line Not possible

17 Effect of Iron Wall 3cm-thick and 5m height soft iron wall Finite element calculation with 3D model 3cm-thick and 5m height soft iron wall Finite element calculation with 3D model Iron wall π M3

18 Effect of Iron Wall Some effect (25-45% reduction), Not sufficient especially for GPS and LTF B field at this level can be distorted easily by surrounding materials not only in direction but also in strength Difficult to predict what actually happens. Some effect (25-45% reduction), Not sufficient especially for GPS and LTF B field at this level can be distorted easily by surrounding materials not only in direction but also in strength Difficult to predict what actually happens. PositionWithout wallWith wall GPS(πM32)1.9 Gauss1.1 Gauss LTF(πM32)0.8 Gauss0.6 Gauss μLAN(πE3)4.8 Gauss2.6 Gauss

19 Active Shielding Cube shape active shielding composed of six compensating coils. B field in any direction can be canceled. Two settings of coil current are necessary corresponding to two states of COBRA magnet (ON & OFF). More efficient and much lighter. This type of active shielding is already working in GPS and LTF in π M3 to compensate earth field. Details of effect are being investigated. Cube shape active shielding composed of six compensating coils. B field in any direction can be canceled. Two settings of coil current are necessary corresponding to two states of COBRA magnet (ON & OFF). More efficient and much lighter. This type of active shielding is already working in GPS and LTF in π M3 to compensate earth field. Details of effect are being investigated. Active shielding in LTF of π M3

20 Possible Solution COBRA Magnet has only two states (ON and OFF). COBRA field will be highly stabilized within 0.1%. Active shielding is already working in GPS and LTF of π M3 to compensate earth field. What is reasonable solution? Active shielding with two settings of compensating coil current corresponding to COBRA ON and OFF. Passive shielding can be added if necessary. Possibility that existing compensating coils in π M3 can cancel COBRA fringing field. It has to be tested after the installation of COBRA in π E5. We plan to measure the fringing field around π E5 after the installation. COBRA Magnet has only two states (ON and OFF). COBRA field will be highly stabilized within 0.1%. Active shielding is already working in GPS and LTF of π M3 to compensate earth field. What is reasonable solution? Active shielding with two settings of compensating coil current corresponding to COBRA ON and OFF. Passive shielding can be added if necessary. Possibility that existing compensating coils in π M3 can cancel COBRA fringing field. It has to be tested after the installation of COBRA in π E5. We plan to measure the fringing field around π E5 after the installation.

21 Summary The second excitation test of the COBRA magnet was successfully performed last August in Japan after fixing the problems in the first test. The magnet was tested up to 380A(5.6% higher than normal operating current). Good quench propagation and mechanical performance were observed. The magnet was transported to the PSI. The excitation test was carried out in SLS hall between Jan.17 and 27 and the magnet was successfully tested up to 380A. Field mapping study is starting in SLS hall and COBRA is planned to move to πE5 this April. COBRA is going to be used in various tests (LXe, timing counter,...) this year and final field measurement will be done after arrival of BTS around at the end of this year. Reasonable solution to fringing field problem might be a combination of active and passive shielding. Further investigation needed. The second excitation test of the COBRA magnet was successfully performed last August in Japan after fixing the problems in the first test. The magnet was tested up to 380A(5.6% higher than normal operating current). Good quench propagation and mechanical performance were observed. The magnet was transported to the PSI. The excitation test was carried out in SLS hall between Jan.17 and 27 and the magnet was successfully tested up to 380A. Field mapping study is starting in SLS hall and COBRA is planned to move to πE5 this April. COBRA is going to be used in various tests (LXe, timing counter,...) this year and final field measurement will be done after arrival of BTS around at the end of this year. Reasonable solution to fringing field problem might be a combination of active and passive shielding. Further investigation needed.