RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer Naval Probability of Program Success (PoPS)

Slides:



Advertisements
Similar presentations
TARGET AFFORDABILITY AND CONTROL COST GROWTH David G. Ahern Portfolio Systems Acquisition Office of the Assistant Secretary of Defense (Acquisition) April.
Advertisements

1 Probability of Program Success Component Standardization : Status Brief Ms. Jane Rathbun Special Assistant, Program Management Improvement OSD(AT&L)(A&T)(PSA)
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
National Fighter Procurement Secretariat Secrétariat national d’approvisionnement en chasseurs Overview of the work of the National Fighter Procurement.
Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
IT Governance and Management
Architecting and Engineering the Naval Force Warfare Systems and Systems of Systems Engineering Mr. Carl Siel ASN(RDA) Chief Systems Engineer
GTM for Product Leaders Project Overview A project that guides product leaders and their teams in developing a successful go-to-market strategy.
1 United States Army EVM and The Army: An Update Presented By: Keith Samuels.
(8/21/2015) Program Independent Assessment (PIA) Joe Kusick SAS Senior Manager, Program Independent Assessment Chairman, Raytheon EVMS Council.
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
1 Navy Center for Earned Value Management (CEVM) January 2007.
May Agenda  PeopleSoft History at Emory  Program Governance  Why Upgrade Now?  Program Guiding Principles  High-Level Roadmap  What Does This.
Enterprise IT Decision Making
Overview of NIPP 2013: Partnering for Critical Infrastructure Security and Resilience October 2013 DRAFT.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Case Study on how the Navy DASN Acquisition Cut Allocated Web Technology Budget by Two- Thirds.
1 ProgramSuccessMetrics Al Moseley DSMC - School of Program Managers How will you measure your program’s success? PMSC 8 Dec.
Gate Review Process presented at DODCAS 2009 DON Session CAPT Jim Baratta Deputy Director, NCCA.
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Capital Planning and Investment Control (CPIC) Revisions to the Construction.
RDA CHSENG DA HIEF YSTEMS NGINEER 1 Naval Probability of Program Success (PoPS) 24 February 2010 Mr. Ricardo Cabrera ASN (RD&A) Chief Systems Engineer.
1 Probability of Program Success Component Standardization : Status Brief Ms. Jane Rathbun Special Assistant, Program Management Improvement OSD(AT&L)(A&T)(PSA)
Presented to: NDIA PMSC By: Keith A. Kratzert Date: August 17, 2005 Federal Aviation Administration EVM at the FAA.
Air Armament Center Mr. John Mistretta Technical Director, AAC/EN War-Winning Capabilities…On Time, On Cost Systems Engineering Update AAC.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
1 Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV) Dr. Jeffrey Beach Naval Surface Warfare Center Carderock Division; Survivability,
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.
Business Case Analysis (BCA) Workshop DAU 20 Feb 03 Michael Skratulia DASN(L) Support.
Department of Navy Logistics Community Update to Logistics FIPT 28 January 2004 DoN Log. Community = 25 Job Series & 11,458 people.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
CAPT Joe Spruill Office of Deputy Assistant Secretary of the Navy (Logistics) September 29, 2005 Managing Obsolescence within a Performance Based Logistics.
Surface Navy Association 16 January, 2013 Nickolas H. Guertin, PE DASN RDT&E.
PMO Update to PRS Troy Anderson Program Management Office March 23, 2006.
ASN(RDA) DASN M&B EVM 31 JAN – 1 FEB New in RDA –Assistant Secretary of the Navy (RDA) Dr. Delores M. Etter –RDA Chief of Staff John S. Thackhah.
Unlocking Potential Naval Open Systems Architecture Nickolas H. Guertin, PE Director for Transformation DASN RDT&E SEA AIR.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® U.S. ARMY CORPS OF ENGINEERS CIVIL WORKS TRANSFORMATION: SMART PLANNING AND RESCOPING CHARETTES.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of: 02 Mar 051 Partnering with Industry on System Safety & MIL-STD-882D.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
1 Discussion Brief on the Center for Earned Value Management (CEVM)
Independent Expert Program Review (IEPR) February 2006.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Laboratory Operations Board
IT Acquisition Management Transformation Rapid Improvement Team (RIT) PM / Pilot Team Meeting 19 November 2002.
RDA CHSENG DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer Naval Probability of Program Success (PoPS) Background.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
Condition Based Maintenance Plus (CBM+) Overview
Power to the Edge A Net-Centric DoD NII/DoD CIO IT Acquisition Management Transformation Rapid Improvement Team (RIT) Principals Meeting November 18, 2003.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Internal Audit Quality Assessment Guide
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
DMSMS Management at NAVICP
NAVAIRINST D.
Identify the Risk of Not Doing BA
New Space Systems Acquisition Policy
Background and How Being Used
Naval Probability of Program Success (PoPS)
Program Control Services – Overview
SECNAV Instruction “Department of the Navy Cost Analysis” Presented to Service Forum at DODCAS 2009 by Mr. John McCrillis, NCCA.
DMSMS Management at NAVICP
Continuity Guidance Circular Webinar
Business Case Analysis (BCA) Workshop
Independent Expert Program Review (IEPR)
Presentation transcript:

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer Naval Probability of Program Success (PoPS) Executive Brief NDIA / ICPM Naval Probability of Program Success (PoPS) Executive Brief NDIA / ICPM 1 June 2009 Mr. Carl Siel ASN(RDA) Chief Systems Engineer

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Agenda Background DON Acquisition Governance Core and Naval PoPS PoPS v1.0 Structure Products and Tools Guidebook, Handbooks, Visuals, Templates How used Individual Program Portfolio of Programs Identification of Systemic Issues Gate Review Path Forward

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER DoN Acquisition Governance The Secretary of the Navy o With CNO, CMC, ASNRDA, SYSCOM Commanders o Comprehensive review of the Acquisition process o Challenges in Program Planning and Execution. Enhance the Acquisition Governance process o Inject Early Senior Leadership o Continuous Engagement and Transparency Increase discipline during each phase of Program Maturity Codified by SECNAVNOTE on 26 February 2008 Incorporated into SECNAVINST D “Two Pass / Six Gate”

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER DoN Acquisition Governance First Pass - Requirements Establishment Second Pass - Acquisition Execution System Design Specification Capability and Performance Expectations Gates - Reviews to Assess Readiness to Proceed Program Health Assessment at each Gate

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Gate Review Core and PoPS “Core” = Detailed information germane to the Gate Decision “PoPS” = Holistic view of overall program health and readiness to proceed

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER PoPS Background 19 Jan 2008 PDASN Memo - Interim use of Air Force “PoPS Spreadsheet Operations Guide” to Assess Program Health During Gate Reviews 6 October 2008 PDASN Memo Naval PoPS Guidance Directed the use of the methods and tools described in the Naval PoPS Guidebook and supplemental Handbooks Required for all DON Gate Reviews (ACATs I & II) Shall serve as the standard DON method of representing the health of all ACAT Programs and any other programs subject to the DON Acquisition process Consistent means to assess program health Used any time program health is discussed

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Agenda Background DON Acquisition Governance Core and Naval PoPS PoPS v1.0 Structure Products and Tools Guidebook, Handbooks, Visuals, Templates How used Individual Program Portfolio of Programs Identification of Systemic Issues Gate Review Path Forward

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Leveraging Air Force PoPS 8 Relocated Removed Added DON Interim PoPS 5 Factors 22 Metrics Subjective Criteria Naval PoPS Factors 17 Metrics More Objective Criteria

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Naval PoPS v1 9 *Notional representation of Criteria. Criteria are Gate- and Metric-specific. The number of Criteria will vary. Program Health 4 Factors 17 Metrics Criteria*

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Naval PoPS Criteria (Gate 2 Example) Metric Factor Criteria 10

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Naval PoPS Process – R/Y/G Thresholds 11  Criteria Color Thresholds Green = 100% of max score Yellow = 66% of max score Red = 33% of max score  Metric, Factor and Program Health Color Thresholds Green = % of max score Yellow = 60-<80% of max score Red = <60% of max score Example of Criteria Color Thresholds Example of Green Threshold for “Parameter Status” Metric G Y R G Y R

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Naval PoPS Scoring Gate 2 Example 17 Metrics 4 Factors 4 pts each Criteria G = 100% Y = 66% R = 33% G=80-100% Y=60-<80% R=<60% G=80-100% Y=60-<80% R=<60% 77.49/100 G=80-100% Y=60-<80% R=<60% 26.21/ / /295.96/ /2 4 2/26.93/1414/147.47/92.48/52.66/39/9.83/11.55/2 2.15/33.46/4.86/1 2.49/32.15/31.32/2 12 Gate 2

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Factor and Metric Level Maximum Scores

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER “Killer Blow” Metrics 14 A Killer Blow is interpreted as a negative situation exists for the program of such significance that it must be remedied..

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER 15 Naval PoPS from Tool Gate 2 Review without “Killer Blows”

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER 16 Naval PoPS from Tool Gate 2 Review with “Killer Blows”

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Naval PoPS Products Guidebook, Handbook, Visuals and Templates Naval PoPS Guidebook oOverview information on Naval PoPS methodology and implementation Naval PoPS Criteria Handbook and Spreadsheets oComplete listing of Program Health Criteria per Gate, per Metric oInstructions on completing Program Health Assessments in Criteria Spreadsheets Naval PoPS Visuals Handbook, Spreadsheets, and Templates oComplete set of Program Health Visual Templates for each Gate Review oInstructions on creating Visual graphs/charts using Visuals Spreadsheets 17

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER How we’re using PoPS  Individual Program Reviews o Identify matters that affect Program Health  PEO Portfolio Reviews o Health of all ACATS within a PEO  Senior Leadership assistance  Identify Systemic Issues o Action Item Tracking by PoPS Metrics o “Advocates” by PoPS Metrics  Establish action teams to address issues with Department implications

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER ‘Portfolio of Portfolios’ Approach Gate 6 Review Sub-Portfolio Gate 6 Review Sub-Portfolio Gate 6 Review Sub-Portfolio Program A (ACAT _) Program B (ACAT _) Program C (ACAT _) Each program within a sub portfolio will complete a PoPS Gate 6 Program Health Assessment. Gate 6 Review Non-Active Programs Portfolio Program XX (ACAT _) Program X (ACAT _) Program Y (ACAT _) Gate 6 Review Sub-Portfolio PEO / Team Portfolio Health Assessment Pre-Gate 6 Review ACAT Programs PEO / Team Portfolio Health Assessment Post-Gate 6 Review In-Service Programs PEO / Team Portfolio Health Assessment Gate 6 Sufficiency Review ACAT Programs Program X1 (ACAT _) Program Y1 (ACAT _) Program A1 (ACAT _) Program B1 (ACAT _) Program C1 (ACAT _) Program X2 (ACAT _) Program Y2 (ACAT _) Program X3 (ACAT _) Program Y3 (ACAT _)

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER PEO / Team Overall Portfolio Health

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Systemic Issue Advocates  Acquisition Management– Principal Civilian DASN (PCD)  Manning – PCD  Contract Execution DASN A&LM  Industry / Company Assessment – DASN AIR and SHIPS/IWS)  Sustainment – DASN A&LM  Interdependencies – DASN C4I  Budget – DASN M&B and EXW  Cost Estimating – ASN FMB  CONOPS – OPNAV / HQMC  Government – DASN C4I  Program Advocacy – DASN C4I  Scope Evolution – DASN M&B with Product DASNs  Parameter Status – RDA CHSENG  T&E – DON T&E Executive  Technical Maturity – RDA CHSENG  Naval POPS – RDA CHSENG  NOTPOPS Other – RDA CHSENG  NOTPOPS Life Cycle Costs – DASN A&LM

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Agenda Background DON Acquisition Governance Core and Naval PoPS PoPS v1.0 Structure Products and Tools Guidebook, Handbooks, Visuals, Templates How used Individual Program Portfolio of Programs Identification of Systemic Issues Gate Review Path Forward

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER 23 Gate Review Update New DoDI (Dec 2008) 2 Post-IBR Post-CDR CPD  Reassess Core Entrance / Exit and Program Health Criteria  Functional Sub Groups addressing emergent initiatives  For each, determine needed revisions to o Entrance and Exit Criteria o Core Templates o Program Health Criteria and Templates  Align Gates to the new DODI o Risk Management o Configuration Steering Board o T&E o Open Architecture o Technology Protection o Sustainment o TOC o Cost Estimating

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Gate Review Core and Program Health The Gate Review process is being used and updated to: o Inject Senior Leadership early o Ensure continuous engagement and transparency o Increase discipline during each phase of Program Maturity

RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER Questions?