03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
EDCM update Mo Sukumaran (on behalf of CMG)
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
Update from DCUSA Michael Walls DCUSA Secretariat 02 February | Energy Networks Association - DCMF.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
Governance and Charging Methodology for User Pays Services 10 th January 2007.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Managing Exceeded Capacity. 10 September The Issue of Exceeded Capacity DNO Connection Charging Methodologies: customers who increase Maximum Capacity.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
Customer Charge On behalf of all DNs 25 October 2010.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Transitional Exit Capacity Proposals -Update
LDZ System Charges – Structure Methodology 26 July 2010
Exit Capacity Substitution and Revision
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Joint Office Presentation for Modification 0678
QSEC auction timetable
Proposed Transitional Gas Exit Arrangements
Ofgem presentation to Gas Transmission Workstream
Incremental Entry Capacity Release Methodology Statement
Charging For Active Network Management / Flexible Connections
Presentation transcript:

03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORK ASSOCIATION PRESENTED BY TONY McENTEE & NEIL FITZSIMMONS

03 April 2009 energynetworks.org 2 WS 4 – Work to Date Key focus on harmonising approach across DNOs Baseline methodology Identified Other Options for Change Option 1 – Revised Boundary for Sharing Costs; Option 2a – Revised CAF: Total Approach; Option 2b – Revised CAF: Incremental Approach; Option 2c – Revised CAF: Incremental Approach with Headroom; Option 3 – Allowance for Deferment of Asset Replacement; To issue a consultation on way forward

03 April 2009 energynetworks.org 3 Baseline Methodology Produced common set of words for Connection Charging Methodology Greater clarity and consistency in application across DNOs Areas covered Minimum Scheme Cost Allocation Costs to be paid in full by the distributor; Costs to be paid in full by the customer; Costs to be apportioned between the customer and the distributor; and Recovery of costs for previous Reinforcement Recovered Equipment and Deferment of Asset Replacement Electricity (Connection Charges) Regulations 2002 (ECCR) Speculative Developments

03 April 2009 energynetworks.org 4 Option 1 – Revised Boundary for Sharing Costs; Baseline The costs of Sole Use Assets and Extension Assets are to be charged in full to the customer. The costs of Reinforcement are to be apportioned between the customer and the distributor. Option The costs of Sole Use Assets are to be charged in full to the customer. The costs of Extension Assets and Reinforcement are to be apportioned between the customer and the distributor.

03 April 2009 energynetworks.org 5 Option 2a – Revised CAF: Total Approach Baseline Required Capacity: the design capacity of the connection, agreed with the customer. For customers requiring increases in capacity this is defined as the incremental capacity. New Network Capacity: the secure capacity following Reinforcement of the assets. Option Required Capacity: the design capacity of the connection, agreed with the customer. For customers requiring increases in capacity this is defined as the total capacity following the increase. New Network Capacity: the secure capacity following Reinforcement of the assets. Same approach for Fault Level CAF – x3 in Baseline and in Option

03 April 2009 energynetworks.org 6 Option 2b – Revised CAF: Incremental Approach; Baseline Required Capacity: the design capacity of the connection, agreed with the customer. For customers requiring increases in capacity this is defined as the incremental capacity. New Network Capacity: the secure capacity following Reinforcement of the assets. Option Required Capacity: the design capacity of the connection, agreed with the customer. For customers requiring increases in capacity this is defined as the incremental capacity. New Network Capacity: the increase in secure capacity following Reinforcement of the assets. Same approach for Fault Level CAF – x3 in Baseline and No x3 in Option

03 April 2009 energynetworks.org 7 Option 2c – Revised CAF: Incremental Approach with Headroom; Baseline Required Capacity: the design capacity of the connection, agreed with the customer. For customers requiring increases in capacity this is defined as the incremental capacity. New Network Capacity: the secure capacity following Reinforcement of the assets. Option Required Capacity: the design capacity of the connection, agreed with the customer. For customers requiring increases in capacity this is defined as the incremental capacity. New Network Capacity: the increase in secure capacity following Reinforcement of the assets. Same approach for Fault Level CAF – x3 in Baseline and No x3 in Option

03 April 2009 energynetworks.org 8 Option 3 – Allowance for Deferment of Asset Replacement Baseline The customer will not receive any credit for the value of any deferment of asset renewal expenditure by the distributor. Option The customer will receive a credit for the value of any deferment of asset renewal expenditure by the distributor in accordance with the following table. Asset to be replacedCredited Value Within x years[x%] of replacement cost Greater than x yearsNo credit given

03 April 2009 energynetworks.org 9 WS 4 – Next Steps Issue Consultation (after Easter) Consider responses and discuss with Ofgem DNOs to bring forward formal modification proposals for implementation 1 April 2010.