43 rd Annual Western States Highway Equipment Managers Association Conference Washington State Department of Transportation Presentation August 29, 2011.

Slides:



Advertisements
Similar presentations
Financial Planning 1 Introduction and Budgeting. Learning Objectives Understand the importance of linking planning and budgeting Understand the importance.
Advertisements

Retroreflectivity: Raising the Nighttime Brightness of Traffic Signs and Markings Office of Technology Applications Peter Hatzi.
Speaker Name & Title Larry Campbell, CPFP Director of Fleet Management, Ft. Wayne, IN Samuel P. Lamerato, CPFP Superintendent of Fleet Maintenance, City.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
Equipment Fleet Management Maximizing your fleet performance at least cost. County Road Administration Board.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
January 24, Maryland Climate Action Plan  Maryland Climate Action Plan  Required by Governor’s Executive Order (January 2007) - Released August.
Current as of: Feb.06, New Economic Recovery Package: Not the Cure Federal government is working on a one-time economic recovery package Package.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
Breaking Down Barriers to Energy Efficiency Utility Revenue Decoupling and other Revenue Stabilization Tools Jim Lazar, RAP Senior Advisor Presented to:
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
Five-Year Mass Transit Fund Financial Forecast April 6,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
Workforce Management System presented by Crystal Woods, Human Resources Division Head Arkansas State Highway and Transportation Department.
Energy Management System (EnMS) Awareness
Less is More: SEE Action and the Power of Efficiency Hon. Phyllis Reha Commissioner, Minnesota PUC Co-Chair, SEE Action Customer Information and Behavior.
Kelly Reagan Administrator Division of Fleet Management Administrator Division of Fleet Management City of Columbus.
Dick Anastasi Lydia Sellie Board Study Session December 8, 2009.
Energy Efficiency Opportunities (EEO) Program 2nd International Conference on the Global impact of Energy Management Systems: ‘Creating the right environment.
THE CONDITION OF OUR SURFACE TRANSPORTATION INFRASTRUCTURE How Do We Adequately Finance Our System?
2014 Budget Department Presentations Infrastructure Funding Options.
Sustainability and Total Cost of Ownership Strategies for Higher Education.
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
M aintenance Efficiency & Cost Effectiveness Initiative Robert M. Peda, P.E. Director, Bureau of Maintenance & Operations, PennDOT MQA Peer Exchange October.
Western States Highway Equipment Managers Association AASHTO Equipment Management Technical Services Program Partner 43 rd Annual Conference WSDOT Fleet.
Presentation to the Central Lane MPO Policy Committee March 08, 2012 Oregon Sustainable Transportation Initiative Statewide Transportation Strategy Statewide.
How the State of California Can Play A Greater Role in Addressing Global Warming Leonard Robinson – Chief Deputy Director California Department of Toxic.
CHAPTER 9 Decision Strategies in Transportation. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 9-2 Areas in.
PUT TITLE HERE GSN Briefing Capital Programs Branch Ministry of Education OASBO March 27, 2008.
Department of Water and Power City of Los Angeles Energy Cost Adjustment Factor Modification August 2009 MODIFIED PROPOSAL WILL BE SUBMITTED ON DECEMBER.
Beyond the Crossroads National Conference on Transportation Infrastructure and Regulatory Policy May 27, Denver, CO Future Infrastructure Needs,
Energy Law, Fall 2010 Natashia Holmes
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
TIGGER Program Public Webinar April 8, 2009 The American Recovery & Reinvestment Act of 2009.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
1 EPA’s Climate Change Strategy Robert J. Meyers Principal Deputy Assistant Administrator U.S. EPA, Office of Air and Radiation December 3, 2007.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Washington State: Climate Initiative
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
National Action Plan for Energy Efficiency eeactionplan The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy.
Projects of National and Regional Significance Program.
Who Does What Susan Handy TTP282 October Players Government Industry Citizens/ Consumers.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
30-Year National Transportation Policy Framework to the Future September 12,
Quantifying the Value of Research in Indiana Tommy Nantung INDOT Research and Development Division AASHTO RAC Annual Meeting July 29, 2015 Portland, Oregon.
Class Project Report, May 2005 ME/ChE 449 Sustainable Air Quality Highway Transportation: Trends from 1970 to 2002 and Beyond By Scott Kaminski Instructor.
STRATEGIC BUDGET COMMITTEE CHARGE Develop model for a 5 year sustainable budget. The model budget should include strategies for cost reductions, recommendations.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Proprietary & confidential. © Decision Lens 2012 Modeling Best Practices in Transportation Jon Malpass Director, Decision Solutions.
What Part Does Transportation and Land Use Play in Tackling Climate Change & Greenhouse Gas Emissions? Gordon Garry Director of Research and Analysis,
Industrial Footprint Project Carol Kraege Washington State Department of Ecology May 9, 2006.
Fleet Equipment. Fleet Makeup, NMDOT NMDOT FUNDING  Annual Legislative allocation, currently 8.5M per year for FY12  FY13 expected to be 9.5M  Fleet.
Transportation Department Review November 5, 2012.
Hernando County Fleet Maintenance. Hernando County Fleet 3 Major Functions Acquisition and Surplus of Equipment Acquisition and Surplus of Equipment Maintenance.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Department of Public Works FY 2015 Operating Budget May 19, 2014.
Road Investment Decision Framework
Why Conservation Matters
Enterprise Asset Management Proposal to Expand AiM :
Village of Ruidoso Water and Wastewater Systems
Construction and Materials Management System
MTA 2019 Final Proposed Budget November Financial Plan
Twin 33s Update Monday, June 10, 2019.
Presentation transcript:

43 rd Annual Western States Highway Equipment Managers Association Conference Washington State Department of Transportation Presentation August 29, 2011 Greg Hansen Fleet Administrator

Equipment Plays a Critical Role in Operating and Maintaining The Highway System 2 2

4,800 Vehicles & Construction Equipment 10,000 Pieces of Supporting Equipment TEF Equipment 4,500 - Wireless Radio System Components 1,350 - Equipment Attachments (primarily snow and ice) Fuel System Components and Generators 40 - Reproduction and Photogrammetry Pieces Field Engineering Survey Equipment 1,700 - Materials Lab Testing Equipment 1,110 - Message Signs and Impact Attenuators Equipment and Lab Trailers 3

4

5 Expenditures Planned For The Biennium $145.8 Million To Deliver Essential Program Services

Supported Customers 6

Work Force 7

Doing More … With Less 8

Expenditures Planned For The Biennium $145.8 Million To Deliver Essential Program Services 9

Fuel Usage and Cost 10

Where we’ve been Because of budget constraints across all department programs over the past several biennia, the department limited the total amount of revenues that TEF was authorized to collect from rental charges to department programs. As a result, TEF has not been able to increase equipment rental rates to fully match the significant increases in equipment costs, fuel, labor, and other operating costs that occurred. In order to make up the funding shortfall, equipment lifecycles were extended and equipment purchases were deferred. While that worked in the short term to plug the gap, it did not solve the problem long-term, as there is now a significant backlog of equipment that needs to be replaced. Equity In The Fleet Has Been Depleted 11 Pressures on TEF Program Comments Legislature transfers funds-$3,500,000 -$5,000,000 Transferred to MVF Unfunded fuel costs -$6,000,000-$2,000,000 Fuel costs were not fully funded Unplanned increase in fuel usage -$1,300,000 Increases occurred due to the Construction Programs tempo Unfunded COLA increases -$1,400,000 OFM oversite Inventory adjustment -$1,000,000 Non cash working capital adj. Unfunded inflationary equipment costs -$1,000,000-$1,500,000-$300,000 Inadequate funding available to purchase all "Meets Criteria" equipment -$14,000,000-$12,000,000-$17,000,000Leadership Team decision Subtotal -$13,000,000-$6,200,000-$14,300,000-$12,000,000-$17,000,000 Actions Taken Deferred "Meets Criteria" equipment $4,000,000$2,000,000$3,300,000$12,000,000$17,000,000Aged beyond its economic life Extended equipment life cycles $9,000,000$4,200,000$11,000,000 Defers replacement to out years Subtotal $13,000,000$6,200,000$14,300,000$12,000,000$17,000,000 Variance$0

Time and Effort Repairing Equipment has Dramatically Increased Repair Hours and Dollars – The life cycle of the existing fleet have been substantially extended. Equipment breakdowns are now common. For instance, 2009 required the equivalent of 10 additional mechanics to keep up with required repair work. Why Do We Need To Invest In Equipment Replacment? 12

Why do we need to fund now? We’ve reached the tipping point Time and Effort Repairing Equipment has Dramatically Increased Repair Hours and Dollars – The life cycle of the existing fleet have been substantially extended. Equipment breakdowns are now common. For instance, 2009 required the equivalent of 10 additional mechanics to keep up with repair work 13

14 Aging the Fleet A Tale of Two Trucks

Risks Associated with Aging the Fleet  Equipment availability will go down  Longer response times  Efficiency decline in day to day operations 15  Unreliable equipment effects the ability of Maintenance and Construction delivering their programs  Potential to adversely affect the traveling public and freight mobility

Performance Measures In Service Time Equipment Availability Preventive Maintenance Labor Pie Charts 16

In Service Time 17

Equipment Availability 18

Statewide PM Completed on Time 19

Mechanic Labor Hours 20

Energy conservation and air quality concerns continue to be significant issues for our agency. Over the years, policies have been developed and implemented to ensure that limited resources are utilized in the most cost-effective, efficient manner possible. Therefore, results of third party analysis and testing of new products, devices and technology for fuel savings and emission reductions must be provided by the vendor(s) prior to implementing the use of a new products, devices and technology with regards to the agency’s fleet and equipment. Prior to using a new fuel additive or fuel and emission reduction device and technology, testing and product evaluation from the U.S. Environmental Protection Agency’s (EPA) “Gas Saving and Emission Reduction Devices Evaluation” program is required. WSDOT will review the evaluation and determine if the product merits field testing. The link to the EPA’s “Gas Saving and Emission Reduction Devices Evaluation” program is Fuel Additives 21

Questions? Contact: Greg Hansen - Title: Fleet Administrator - Phone: