1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Process Analysis Operations.
Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
1 Slide Process Analysis Fundamentals MGT Slide Process Definition  A process is a collection of operations connected by a flow of transactions.
Process Design and Analysis
PROCESS DESIGN AND ANALYSIS Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MBA 8452 Systems and Operations Management
Process Analysis. © The McGraw-Hill Companies, Inc., 2004 Operations -- Prof. Juran2 Outline Process Analysis Defined Key Terms and Metrics Process Flowcharting.
Operations Management
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
Chapter 4 Process design Shenval. Alamy.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
IV. Little’s Law and Labor Costs
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
from Prof. Goldsman’s lecture notes
MGTSC 352 Lecture 23: Congestion Management Introduction: Asgard Bank example Simulating a queue Types of congested systems, queueing template Ride’n’Collide.
Ch 3 Manufacturing Models and Metrics
Operating Processes process  A process is a set of tasks to be performed in a defined sequence  A process uses inputs to create outputs that are of value.
Chapter 6, Process-Flow Analysis
Irwin/McGraw-Hill 1 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
SESSION-9,10,11,12 Process analysis, Product Analysis and Development ECE AND EEE.
Introduction to Management Science
Dr. Cesar Malave Texas A & M University
1 Chapter 5 Flow Lines Types Issues in Design and Operation Models of Asynchronous Lines –Infinite or Finite Buffers Models of Synchronous (Indexing) Lines.
Operations Management Module 4 : Process Analysis S.Balachandran 2007 December 2007.
Process Analysis Process Flowcharting Types of Processes Process Performance Metrics OBJECTIVES.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Announcement-exam rules
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Operations Management
Managing Processes and Capabilities CHAPTER THREE.
Process Analysis process  A process is a set of tasks to be performed in a defined sequence  Process analysis describes how a process is doing and can.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Process Analysis CHAPTER 5. Learning Objectives 1. Recognize three basic types of processes: a serial flow process, parallel processes (such as what happens.
Operations Management For Competitive Advantage 1 Process Analysis Operations Management For Competitive Advantage Chapter 4.
Process Analysis I Operations -- Prof. Juran.
Process Characteristics
IE450 Models Relating Cycle-time, Throughput, WIP and Batch Sizes
MGTSC 352 Lecture 25: Congestion Management MEC example Manufacturing example.
Operations Fall 2015 Bruce Duggan Providence University College.
Activity Scheduling and Control
(C) J. M. Garrido1 Objects in a Simulation Model There are several objects in a simulation model The activate objects are instances of the classes that.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Key Learnings: Little’s Law
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Process-Flow Analysis
Analytical Tools for Process Analysis and Improvement
Process Design and Analysis
Queuing Theory Jackson Networks
Process Analysis.
Process Analysis Guanyi Lu September 18, 2018.
Chapter 5 Process Analysis.
Variability 8/24/04 Paul A. Jensen
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Chapter 5 Process Analysis.
Presentation transcript:

1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of Processes  Process Performance Metrics

2 Slides used in class may be different from slides in student pack Process Analysis Terms  Process: Is any part of an organization that takes inputs and transforms them into outputs.  Cycle Time: Is the average time between completions of successive units.  Utilization: Is the ratio of the time that a resource is actually activated relative to the time that it is available for use.

3 Slides used in class may be different from slides in student pack Process Analysis Terms  Process: Is any part of an organization that takes inputs and transforms them into outputs.  Cycle Time: Is the average time between completions of successive units.  Utilization: Is the ratio of the time that a resource is actually activated relative to the time that it is available for use.

4 Slides used in class may be different from slides in student pack Other Process Terminology  Blocking –Occurs when the activities in a stage must stop because there is no place to deposit the item just completed –If there is no room for an employee to place a unit of completed work, the employee will hold on to it and will not be able to start working on the next unit  Starving –Occurs when the activities in a stage must stop because there is no work –If an employee is waiting at a work station and no work is coming for the employee to process, the employee will remain idle until the next unit of work comes

5 Slides used in class may be different from slides in student pack Other Process Terminology (Continued)  Bottleneck –Occurs when the limited capacity of a process causes work to pile up or become unevenly distributed in the flow of a process –If an employee works too slow in a multi-stage process, work will begin to pile up in front of that employee. In this case the employee represents the limited capacity causing the bottleneck.  Pacing –Refers to the fixed timing of the movement of items through the process

6 Slides used in class may be different from slides in student pack Process Flowcharting Defined  Process flowcharting is the use of a diagram to present the major elements of a process. The basic elements can include tasks or operations, flows of materials or customers, decision points, and storage areas or queues.  It is an ideal methodology by which to begin analyzing a process.

7 Slides used in class may be different from slides in student pack Flowchart Symbols Tasks or operations Examples: Decision Points Examples:

8 Slides used in class may be different from slides in student pack Flowchart Symbols (Continued) Examples:Storage areas or queues Flows of materials or customers through the process

9 Slides used in class may be different from slides in student pack Example: Flowchart of Student Going to School Yes No

10 Slides used in class may be different from slides in student pack Multistage Process Stage 1Stage 2Stage 3

11 Slides used in class may be different from slides in student pack Multistage Process with Buffer Stage 1Stage 2 Buffer

12 Slides used in class may be different from slides in student pack Categories of Processes  Make-to-order –Only activated in response to an actual order. –  Make-to-stock –Process activated to meet expected or forecast demand. –

13 Slides used in class may be different from slides in student pack Types of Processes Design Source Manufacture Distribute FabricateAssemble Time

14 Slides used in class may be different from slides in student pack Process Performance Metrics  Throughput time =  Cycle time =  Throughput rate =

15 Slides used in class may be different from slides in student pack Process Performance Metrics (Continued)  Velocity =  Operation time =  Efficiency =

16 Slides used in class may be different from slides in student pack Process Performance Metrics (Continued)  Productivity =  Utilization =

17 Slides used in class may be different from slides in student pack Process Performance Metrics (Continued)  Little’s Law:

18 Slides used in class may be different from slides in student pack Cycle Time Example  Suppose you had to produce 600 units in 80 hours to meet the demand requirements of a product. What is the cycle time to meet this demand requirement?  Answer:

19 Slides used in class may be different from slides in student pack Example Continued  What is the throughput rate? Answer:  If the actual output of units in 80 hours was 550, what was the efficiency? Answer:  If the line was manned to run 80 hours over 2 shifts, but was shut down for 8 hours, what is the utilization? Answer:

20 Slides used in class may be different from slides in student pack A machine produces box A at a rate of 30 per minute. To switch the machine to A requires a setup of 30 minutes. How long will it take to make 10,000 A’s?  

21 Slides used in class may be different from slides in student pack If a refrigerator company has demand for 1000 refrigerators during a 7 hour shift, what is the required cycle time of the line?  What is the throughput rate?

22 Slides used in class may be different from slides in student pack You arrive at the customer service counter at Wal-Mart to find 11 customers ahead of you. If the counter can service 20 customers per hour, what is your throughput time in minutes?

23 Slides used in class may be different from slides in student pack Process Throughput Time Reduction  Perform activities in parallel -  Change the sequence of activities -  Reduce interruptions -  Reduce Distance -