Market Mitigation Concept Group Update Jim Galvin April 26, 2004.

Slides:



Advertisements
Similar presentations
TNT Commercial Operations Working Meeting Betty Day, Kenneth Ragsdale, BJ Flowers April 6&7, 2004.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
SCED Power Balance Penalty Curve
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
February 2012 CMWG Constraints Competitiveness Tests (CCT)
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
Revisiting the Mitigation Proposal Clayton Greer Constellation Power Source.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
Congestion Management Working Group WMS update 11/7/2012.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Unit-Specific Bid Limits based on Modified Generic Cost.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.
1 WMS Report TO TAC April 2007 (which is in March)
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
CMWG Update to WMS Report of CMWG Meeting of
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
CRR Deration and NPRR821 WMS 09/06/2017.
Exceptional Fuel Costs in LMP
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Resource Cost Working Group
General Overview Of Resource Costs
Resource Cost Working Group
Settlements Analysis due to SFT Deration Issue
Briefing on 2017 CAISO Policy Initiatives Roadmap
Presentation transcript:

Market Mitigation Concept Group Update Jim Galvin April 26, 2004

5/26/20162 Purpose of the Today’s Report  Identify the status of the MMCG Whitepaper  Introduce key items of consensus  Identify open items for vote at the May 10 th TNT meeting  Educate and answer questions

5/26/20163 Key items of Consensus  Purpose of Mitigation  Independent Market Monitor Language  Definitions with exception of definition of Market Power which will come from PUCT rulemaking  Competitive Test has general agreement in content but requires additional analysis of ERCOT constraints

5/26/20164 Key items of Consensus  Competitive Test  Element Competitiveness Index (ECI)- MMCG defines this as a HHI base algorithm for determining market concentration  Testing of known ERCOT constraints is ongoing  ECI is the preferred method while additional constraints are studied

5/26/20165 Key items of Consensus  Competitive Test (Cont)  Annual test will identify the competitive constraints for the year  Monthly tests will be conducted to allow constraints to change competitive status for the given month based on an appropriate index parameter  Daily tests will be conducted to allow change in competitive status for that day at an appropriate index parameter

5/26/20166 Key items of Consensus  Competitive Test (Cont)  An assigned committee of the ERCOT Board will review the ECI Competitive Test and make a recommendation for Board approval by April 1, 2005  Appendix A of the whitepaper will include potential options if ECI does not meet stakeholder requirements  Analysis of actual data on ERCOT constraints has been deemed valuable and worth the additional time to ensure the effectiveness of the ECI method

5/26/20167 Decision Points for Vote  Floor Prices (page 7)-  Consensus that the system software design should be able to accommodate Floor Prices  Option 1 is identified floor at -$1000  Option 2 proposes a -$75.00/MWh floor for Renewable and Nuclear Resources and -$30.00/MWh for all other Resources

5/26/20168 Decision Points for Vote  System Wide Mitigation Cap (pages 7-9)-  Option 1- No CSM (Competitive Solution Method) Bid curve will extend to $1000 above its offer curve (or output schedule) upper limit to its HASL and the Offer Floor below its offer curve lower limit to its LASL  Option 2- CSM method where cap is lesser of $1000 or System-wide Mitigation Cap (1.5% x 95% of all energy offers)

5/26/20169 Decision Points for Vote  System Wide Mitigation Cap (pages 7-9)-  Option 3- No Market Participant may submit an Offer curve containing prices exceeding $300/MWh with a slope that exceeds $15/MWh per MW for the portion of the Offer curve priced above $300/MWh

5/26/ Decision Points for Vote  Extending offer curve if there is no offer (pages 9- 10)-  Option 1- Extend offer curve to the Offer Floor  Option 2- Resource technology specific

5/26/ Decision Points for Vote  Mitigation of CRR revenue shortfall due to oversold CRR’s (pages 11-13)-  Option 1- All constraints that have oversold CRR impacts shall have their available capacity allocated pro-rata to the impacted CRRs for CRR settlement purposes. Impacted CRR holders shall be refunded the amount paid for the oversold capacity based on the Shadow Price of the constraint in the CRR Auction where the impacted CRR was bought

5/26/ Decision Points for Vote  Mitigation of CRR revenue shortfall due to oversold CRR’s (pages 11-13)-  Option 2- The Mitigated Offer Floors shall be applied to all Resources for capacity above its LASL that have shift factors greater than 1/3 of the largest Resource shift factor relative to the import terminal of the constraint and that are owned and/or operated by a QSE and its Affiliates that own more than 25% of the capacity of the constraint in CRRs (floors are resource technology specific)

5/26/ Decision Points for Vote  Mitigation of CRR revenue shortfall due to oversold CRR’s (pages 11-13)-  Option 3- Resources with absolute shift factors greater than 1/3 of the largest Resource absolute shift factor relative to the import terminal of a derated, oversold and binding constraint and that are owned and/or operated by a QSE and its Affiliates that own CRRs that impact the same constraints may be required to refund a portion of their CRR payments if the Resources offered energy for capacity above its LASL (including by offer curve extension) at prices below the Technology-specific Safe Harbor Prices

5/26/ Decision Points for Vote  Mitigation of CRR revenue shortfall due to oversold CRR’s (pages 11-13)-  Option 4- No mitigation, with responsibilities placed on the Independent Market Monitor

5/26/ Work in Progress  Mitigation for EHDAM (pages 13-15)  The Relaxed Mixed Integer Programming (MIP) method used to reflect Start-up Cost and Minimum- energy Cost in the corresponding nodal LMP shall be investigated for desirability and feasibility  Relaxed MIP results in LMP’s that include Make Whole and minimizes uplift  Energy offers in EHDAM may be mitigated to System- wide Mitigation Cap or not mitigated  CRR mitigation in EHDAM in discussion

5/26/ Work in Progress  Mitigation for Ancillary Services (pages 15-17)  Option 1- $1000 offer cap  Option 2- No Market Participant may submit an Offer curve containing prices exceeding $300/MW with a slope that exceeds $15/MW per MW for the portion of the Offer curve priced above $300/MW  Option 3- CSM

5/26/ Work in Progress  Real Time Mitigation  Board remanded the vote taken on March 31 st back to TNT  Real Time Mitigation included the following:  Mitigated Offer Cap for all Resources is equal to 14.5 MMBtu/MWh x FIP. Resources may provide the ERCOT Independent Market Monitor with verifiable costs requesting its individual pre-approved Mitigated Offer Cap be set at verifiable cost plus 15%.  This vote also included elimination of the 25% adder in the DARUC Cost Allocation provision

5/26/ Future Meeting Dates  Joint meetings with Congestion Management Concept Group April 29 and 30  Will schedule additional meetings as needed to bring the items reviewed today for vote on May 10 TNT General Session

5/26/ Actions for TNT  TAKE A DEEP BREATHE!  Please review the whitepaper in detail for vote on May 10