Evaluating a Single Project

Slides:



Advertisements
Similar presentations
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Advertisements

Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
13-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 13 Breakeven and Payback Analysis © 2012 by McGraw-Hill.
Capital Investment Analysis
CTC 475 Review Matching period and interest interval Continuous Compounding.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Engineering Economics Outline Overview
1 Dr. Lotfi K.GAAFAR Eng. Ahmed Salah RIFKY ENGR 345 Engineering Economy.
Chapter 5: Evaluating a Single Project
COMPARING ALTERNATIVES
Chapter IV Examples.
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
Flash back before we compare mutually exclusive alternatives.
Dealing With Uncertainty
Lecture slides to accompany Leland Blank and Anthony Tarquin
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
CTC 475 Review Matching period and interest interval Matching period and interest interval Continuous Compounding Continuous Compounding Continuous Flow.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Applications of Money- Time Relationships MARR by PW Method r r All cash inflows and outflows are discounted to the present point in time at an interest.
Rate of Return One Project Lecture slides to accompany
FINAL EXAM REVIEW Spring Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Intro to Engineering Economy
FINAL EXAM REVIEW Fall Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present Worth.
Present Worth Analysis Lecture slides to accompany
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 7-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
EGR Rate of Return Analysis Rate of Return (ROR) is the rate paid on the unpaid balance of borrowed money, or the rate earned on the unrecovered.
Mutually Exclusive Independent Are compared only against do-nothing More than one can be selected Are compared against each other Only one can be selected.
1 Chapter 7 Rate of Return Analysis. 2 Recall the $5,000 debt example in chapter 3. Each of the four plans were used to repay the amount of $5000. At.
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
Exam 3 Practice Problems For Engineering Economy By Douglas Rittmann.
Warren Reeve Duchac Accounting 26e Capital Investment Analysis 26 C H A P T E R human/iStock/360/Getty Images.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
1 Introduction to Accounting and Business 26 Capital Investment Analysis Student Version.
Engineering Economics, Ejaz Gul, FUIEMS, 2009 Engineering Economics Lecture # 8 MARR, Analysis of Alternatives.
CHAPTER © jsnyderdesign / iStockphoto 9 CAPITAL BUDGETING.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Chapter 5: Evaluating a Single Project
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Variations in Present Worth Analysis
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Evaluation Alternatives Present Worth Analysis
Chapter 5: Evaluating a Single Project
Evaluation Alternatives Present Worth Analysis
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Chapter 7 Present Worth Analysis
Evaluation Alternatives Present Worth Analysis
Rate of Return One Project Lecture slides to accompany
Chapter 5: Evaluating a Single Project
RATE OF RETURN ANALYSIS CHAPTER 7
Engineering Economic Analysis
Chapter 5: Evaluating a Single Project
Capital Budgeting Techniques
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Presentation transcript:

Evaluating a Single Project Chapter 5 Evaluating a Single Project The objective of Chapter 5 is to discuss contemporary methods for determining project profitability.

Proposed capital projects can be evaluated in several ways. Present worth (PW) Future worth (FW) Annual worth (AW) Internal rate of return (IRR) External rate of return (ERR) Payback period

To be attractive, a capital project must provide a return that exceeds a minimum level established by the organization. This minimum level is reflected in a firm’s Minimum Attractive Rate of Return (MARR).

The present worth method. The present worth (PW) is found by discounting all cash inflows and outflows to the present time at an interest rate that is generally the MARR. A positive PW for an investment project means that the project is acceptable (it satisfies the MARR).

PW = $4,671.40  This is a good investment! Example: Consider a project that has an initial investment of $50,000 and that returns $18,000 per year for the next four years. If the MARR is 12%, is this a good investment? PW = -50,000 + 18,000 (P/A, 12%, 4) PW = -50,000 + 18,000 (3.0373) PW = $4,671.40  This is a good investment!

Assumptions of the PW method It is assumed we know the future with certainty. It is assumed we can borrow or lend money at the same interest rate.

Bond value is a good example of present worth. Two type of payments: A series of periodic interest payments will be received until the bond is retired. A single payment when the bond is retired or sold. (Bond’s maturity date is reached ) Face, Par, or value = Bond value (received after N periods ) Redemption or disposal price = bond value Bond rate = nominal interest per interest period N = number of periods before redemption i = bond yield rate per period

Bond value = 10,000$ Bond rate = 8% / 4 = 2% per 3 months (quarter) i = 10% / 4 = 2.5% per 3 months (quarter) N = 8×4 = 32 quarters. Uniform received payments = Bond value × Bond rate = 0.02 ×10,000 = 200$ per quarter P = 10,000 (P/F, 2.5%, 32) + 200 (P/A, 2.5%, 32) = 8907.6$

Bond value = 5,000$. Bond rate = 8% per year. i = 10% per year. N = 20 quarters. Uniform received payments = Bond value × Bond rate = 0.08 ×5,000 = 400$ per year P = 5,000 (P/F, 10%, 20) + 400 (P/A, 10%, 20) = 4148.4$ (b) P = 4600$ find i? 4600 = 5,000 (P/F, i%, 20) + 400 (P/A, i%, 20) By trial and error, i = 8.9%

Capitalized worth CW Capitalized worth is the present worth of all revenues or expenses over an infinite length of time. If only expenses are considered this is sometimes referred to as capitalized cost. The capitalized worth method is especially useful in problems involving endowments and public projects with indefinite lives. As N becomes very large, (P/A) = 1/i. So, CW = A(1/i).

A = 30,000 + 20,000 (A/F, 8%, 4) = 34,438$ CW = -100,000 – 34,438 (P/A, 8%, infinity ) = -100,000 – 34,438/.08 = -530,475$

Future Worth (FW) FW is based on the equivalent worth of all cash inflows and outflows at the end of the study period at an interest rate that is generally the MARR. Decisions made using FW and PW will be the same. A positive FW for an investment project means that the project is acceptable (it satisfies the MARR).

Annual Worth (AW) Annual worth is an equal periodic series of dollar amounts that is equivalent to the cash inflows and outflows, at an interest rate that is generally the MARR. The AW of a project is annual equivalent revenue or savings (R) minus annual equivalent expenses (E), minus annual capital recovery (CR) amount.

Capital Recovery CR is the annual equivalent cost of the capital invested. The CR covers the following items. Loss in value of the asset. Interest on invested capital (at the MARR). The CR distributes the initial cost (I) and the salvage value (S) across the life of the asset. Equivalent Uniform Annual Cost (EUAC) = CR + E

Example: A corporate jet costs 1,350,000$ and will incur 200,000$ per year in fixed cost (maintenance,… ) and 277$ per hour variable cost (fuel,…). The jet will be operated 1200 hours per year for five years and then sold for 650,000$. The jet revenues 1000$ per hour. The MARR is 15% per year. Revenue, R = 1000$ × 1200 = 1,200,000$ per year Expense, E = 200,000$ + 277$ ×1200 = 532,400$ per year Capital Recovery, CR = 1,350,000(A/P, 15%, 5) – 650,000(A/F, 15%, 5) = 306,310$ per year 4. Annual Worth, AW = R – E – CR = 361,290$ per year 5. Equivalent Uniform Annual Cost, EUAC = E + CR = 838,710$ per year

1. Revenue, R = 300,000 × 0.1 = 30,000$ per year 2. Expense, E = 0 $ 3. Capital Recovery, CR = 110,000(A/P, 15%, 6) – 8,000(A/F, 15%, 5) = 28,148.4$ per year 4. Annual Worth, AW = R – E – CR = 1,851.6$ per year 5. Equivalent Uniform Annual Cost, EUAC = E + CR = 28,148.4$ per year

Internal Rate of Return The internal rate of return (IRR) method is the most widely used rate of return method for performing engineering economic analysis. It is also called the investor’s method, the discounted cash flow method, and the profitability index. If the IRR for a project is greater than the MARR, then the project is acceptable. The IRR is the interest rate that equates the equivalent worth of an alternative’s cash inflows (revenue, R) to the equivalent worth of cash outflows (expenses, E). The IRR is sometimes referred to as the breakeven interest rate.

The IRR is the interest i'% at which The method of solving for the i'% that equates revenues and expenses normally involves trial-and-error calculations, or solving numerically using mathematical software.

-345,000 + 115,000(P/F, i, 6) + 98,000(P/A, i, 6) = 0 OR -345,000(F/P, i, 6) + 115,000 + 98,000(F/A, i, 6) = 0 OR -345,000(A/P, i, 6) + 115,000(A/F, i, 6) + 98,000 = 0

-345,000 + 115,000(P/F, i, 6) + 98,000(P/A, i, 6) = 0 Try i = MARR = 20% -345,000 + 115,000×0.3349 + 98,000×3.3255 = 19,412.5 Try i = 25% -345,000 + 115,000×0.2621 + 98,000×2.9514 = -25,621 20% 19,412.5 i% 0 25% -25,621 i = IRR = 22.1% per year

-25,000 + 5,000(P/F, i, 5) + 8,000(P/A, i, 5) = 0 Try i = 20% -25,000 + 5,000×0.4019 + 8,000×2.9906 = 934.3$ Try i = 25% -25,000 + 5,000×0.3277 + 8,000×2.6893 = -1847.1 20% 934.3 i% 0 25% -1847.1 i = IRR = 21.68% per year

i = IRR = 6.75% per three months A = 0.07 × 7000 = 490$ 7000 - 490(P/A, i, 50) = 0 (P/A, i, 50) = 14.2857 i = 6% (P/A, 6%, 50) = 15.7619 i = 7% (P/A, 7%, 50) = 13.8007 i = IRR = 6.75% per three months

-7500 + 350(P/A, i, 24) = 0 (P/A, i, 50) = 21.4286 i = 1% (P/A, 1%, 24) = 21.2434 i = 0.75% (P/A, 0.75%, 24) = 21.8891 i = IRR = 0.93% per month