05/23/2002Flavia Donno, INFN-Pisa1 DataTAG experiment grid integration plan Flavia Donno, INFN-Pisa DataTAG/iVDGL joint meeting, 23-24 May 2002.

Slides:



Advertisements
Similar presentations
Claudio Grandi INFN Bologna DataTAG WP4 meeting, Bologna 14 jan 2003 CMS Grid Integration Claudio Grandi (INFN – Bologna)
Advertisements

DataTAG WP4 Meeting CNAF Jan 14, 2003 Interfacing AliEn and EDG 1/13 Stefano Bagnasco, INFN Torino Interfacing AliEn to EDG Stefano Bagnasco, INFN Torino.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
November 21, 2002Luca Vaccarossa INFN - Milano1 Interoperability Demos and Atlas applications Luca Vaccarossa (INFN - Milano) ATLAS Software Workshop 21/11/2002.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
DataGrid is a project funded by the European Union CHEP 2003 – March 2003 – Title – n° 1 Grid Data Management in Action Experience in Running and.
The LHC Computing Grid Project Tomi Kauppi Timo Larjo.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
GRID Workload Management System Massimo Sgaravatto INFN Padova.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
The EDG Testbed Deployment Details The European DataGrid Project
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
EU 2nd Year Review – Feb – Title – n° 1 WP8: Progress and testbed evaluation F Harris (Oxford/CERN) (WP8 coordinator )
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
HEP Experiment Integration within GriPhyN/PPDG/iVDGL Rick Cavanaugh University of Florida DataTAG/WP4 Meeting 23 May, 2002.
VOX Project Status T. Levshina. Talk Overview VOX Status –Registration –Globus callouts/Plug-ins –LRAS –SAZ Collaboration with VOMS EDG team Preparation.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
WP8 Status – Stephen Burke – 30th January 2003 WP8 Status Stephen Burke (RAL) (with thanks to Frank Harris)
27-28 August 2002Flavia Donno, INFN-Pisa1 Report on GLUE activities Flavia Donno, INFN-Pisa EDG Retreat August 2002.
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
Grid Workload Management Massimo Sgaravatto INFN Padova.
CMS Stress Test Report Marco Verlato (INFN-Padova) INFN-GRID Testbed Meeting 17 Gennaio 2003.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
November SC06 Tampa F.Fanzago CRAB a user-friendly tool for CMS distributed analysis Federica Fanzago INFN-PADOVA for CRAB team.
29 May 2002Joint EDG/WP8-EDT/WP4 MeetingClaudio Grandi INFN Bologna LHC Experiments Grid Integration Plans C.Grandi INFN - Bologna.
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
US ATLAS Grid Projects Rob Gardner Indiana University Mid Year Review of US ATLAS Computing NSF Headquarters, Arlington VA June 20, 2002
October LHCUSA meeting BNL Bjørn S. Nilsen Update on NSF-ITR Proposal Bjørn S. Nilsen The Ohio State University.
1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001.
Atlas Grid Status - part 1 Jennifer Schopf ANL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
The GriPhyN Planning Process All-Hands Meeting ISI 15 October 2001.
INFSO-RI Enabling Grids for E-sciencE OSG-LCG Interoperability Activity Author: Laurence Field (CERN)
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
Prototyping production and analysis frameworks for LHC experiments based on LCG, EGEE and INFN-Grid middleware CDF: DAG and Parametric Jobs ALICE: Evolution.
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
1 DataTAG-WP4 and GLUE ( mainly from A.Ghiselli II INFN-Grid workshop) Mirco Mazzucato Gridstart meeting at HPC Cetraro.
Julia Andreeva on behalf of the MND section MND review.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
VOX Project Status T. Levshina. 5/7/2003LCG SEC meetings2 Goals, team and collaborators Purpose: To facilitate the remote participation of US based physicists.
Grid Activities in CMS Asad Samar (Caltech) PPDG meeting, Argonne July 13-14, 2000.
DataTAG is a project funded by the European Union International School on Grid Computing, 23 Jul 2003 – n o 1 GridICE The eyes of the grid PART I. Introduction.
1 CMS Virtual Data Overview Koen Holtman Caltech/CMS GriPhyN all-hands meeting, Marina del Rey April 9, 2001.
Planning Session. ATLAS(-CMS) End-to-End Demo Kaushik De is the Demo Czar Need to put team together Atlfast production jobs –Atlfast may be unstable over.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
Massimo Sgaravatto INFN Padova
Regional Operations Centres Core infrastructure Centres
BaBar-Grid Status and Prospects
The EDG Testbed Deployment Details
U.S. ATLAS Grid Production Experience
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
LCG middleware and LHC experiments ARDA project
A conceptual model of grid resources and services
LCG experience in Integrating Grid Toolkits
5th EU DataGrid Conference
Report on GLUE activities 5th EU-DataGRID Conference
Presentation transcript:

05/23/2002Flavia Donno, INFN-Pisa1 DataTAG experiment grid integration plan Flavia Donno, INFN-Pisa DataTAG/iVDGL joint meeting, May 2002

05/23/2002Flavia Donno, INFN-Pisa2 Outline  Goals  People and HW resources  Working plan with experiments (ATLAS, CDF, CMS, ALICE, D0)

05/23/2002Flavia Donno, INFN-Pisa3 Goals Goals:  Interoperability between EU and US Grids services from DataGrid, GriPhyN, PPDG and in collaboration with iVDGL, DataGrid, GriPhyN, PPDG and in collaboration with iVDGL, for the HEP applications. for the HEP applications.Steps:  Produce an assessment of interoperability solutions  Provide test environment to LHC Applications to extend existing use-cases to test interoperability of the grid existing use-cases to test interoperability of the grid components components  Provide input to a common Grid LHC architecture  Plan EU-US Integrated grid deployment

05/23/2002Flavia Donno, INFN-Pisa4 General Plan Plan:   Evaluation of existing packaging and deployment tools. Collection of a set of requirements (VDT/PACMAN, EDG/LCFG, etc…) – first draft. DataTAG software distribution.   Evaluation/Deployment of existing services for job scheduling, submission and monitoring (DAGMAN, Condor-G, EDG/RB). Collection of requirements. First draft.   Evaluation/Deployment of existing DataManagement Tools (Globus/GridFTP, EDG/Replica Manager, MAGDA, SAM, etc). Collection of requirements. First draft.   Classifications of available services and identification of common requirements. The evaluations will be done in the context of the VO infrastructure provided by EDT-WP4 and in particular with the VO services for Authentication, and Authorization and the agreed common schema for Resource Specification/Discovery.

05/23/2002Flavia Donno, INFN-Pisa5 People and HW resources PEOPLE: DataTAG/WP4.3-4 people : INFN (7fte), PPARC (1fte) Coordinator:Flavia Donno- INFN Milano:David Rebatto- Luca Vaccarossa- INFN Padova:F. Fanzago- S. Fantinel- N. Smirnov- INFN CNAF :Cristina Vistoli- Vincenzo Ciaschini- Antonia Ghiselli- PPARC :Simone Ludwig- Human resources come also from partecipating experiments. Contact points established with experiments. Contact points established with iVDGL. HW Resources: Alice in progress (Italy, NiKhef, OCS, BNL) Atlas test layout in Milan, Argonne CDF test layout in Trieste, Bologna, FNAL CMS test layout in Italy, Ecole politecnique, Russia, … DataTAG test layout at CNAF for common services.

05/23/2002Flavia Donno, INFN-Pisa6 Working plan with experiments  Plans established with CMS and CDF.  Short term plan for ATLAS. A more detailed plan needs to be agreed for future activities. Check with the US counterpart.  First meeting with Alice May 2 nd Preliminary plan for Job submission and Data Catalogues.  D0 and Virgo/Ligo still to be defined. For now mainly EDG tools are used (EDG v1.1.1, v1.1.2 and v1.1.4): machine configuration, WP6 distribution, VO management, grid-mapfile, Information Service, EDG middleware software (Globus Beta2.1,Condor-G 6.3.1, classads 0.9, GDMP2.1 and 3.0)

05/23/2002Flavia Donno, INFN-Pisa7 Working plan with experiments - ALICE  Alice (P. Cerello): Goals:  A. Complete the PPR (Physics Performance Report) by the end of this year exploiting the use of GRID tools on test layouts spanning in both EU and US. Officially, for the PPR Alice will use AliEn. Alice would like to try to use AliEn managed resources and EDG resources with a minimal version of AliEn so that steps not possible with EDG can be executed by AliEn in a second time.  B. I nterface AliEn with EDG/RB if possible so that the RB will act like an “AliEn client” or with iVDGL/Condor-G.  C. I nterface or merge AliEn and EDG/RC data catalogues.  D. E xploit EDG/Spitfire and build with it a prototype of a “Grid” distributed data metadata catalogue to explore the problems related to this argument.

05/23/2002Flavia Donno, INFN-Pisa8 Working plan with experiments - ALICE Plan: A. 1 Define a DataTAG/iVDGL test layout for Alice. Define the hardware to be used by May 31st A. 1 Define a DataTAG/iVDGL test layout for Alice. Define the hardware to be used by May 31st B.1 DataTAG people help setup the Alice test layout. First attempts for interfacing Alien and the EDG/RB. Interface to iVDGL/Condor-G will come as a second step. B.2 Alien installation on Alice test layout. Coordination with Pedrag Buncic at CERN. Try to reach some results by September 2002 ? C.1 Interface of the AliEn and EDG catalogues A more detailed plan can be written down once we have more clear ideas on how to proceed and after talking to Pedrag and Fons. D.1 Domenico Vicinanza and Daniele Mura will try to install and configure Spitfire on machines at Cagliari with the help of the spitfire support team in EDG and of DataTAG people.

05/23/2002Flavia Donno, INFN-Pisa9 Working plan with experiments - ATLAS  Atlas (L. Perini): Goals:  A. As a first step, Atlas is trying to use the EDG solution on its test layout for the Data Challenge 1 (DC1) which should start by the 15 th of June.  B. Atlas will need to distribute the EDG software to the American collaborators with VDT distribution tools.  C. The only development Atlas is carrying on is the integration of MAGDA (the Atlas data manager) and EDG/GDMP.  D. Further developments are ongoing in the areas of: Metadata catalogue for the data (they have one developed by Grenoble). Metadata catalogue for the data (they have one developed by Grenoble). Griphyn and Virtual Data Language (GRAPPA). Griphyn and Virtual Data Language (GRAPPA). “Gridified” Online notebook by Indiana University. Virtual Data (MOP per le produzioni di Atlas)

05/23/2002Flavia Donno, INFN-Pisa10 Working plan with experiments - ATLAS Plan: A. 1 DataTAG will help setup a test layout for MAGDA/GDMP integration. B.1 DataTAG will try to produce a distribution of EDG/release 1.2 via Pacman by the 15 th of June. C.1 Work is in progress with EDG and DataTAG people to realize the integration of GDMP and MAGDA. A first integration will just try to syncronize the MAGDA and GDMP internal catalogues for file mirroring. This should be achieved by the end of May.

05/23/2002Flavia Donno, INFN-Pisa11 Working plan with experiments - CDF  CDF (S. Belforte, A. Sidoti, R. St. Denis): Goals:  A. CDF starts using European DataGRID toolkit for interoperability across European institution/laboratories, in conjunction with software configured as SAM stations to deal with data handling and distribution.  B. Make it easier to connect from EU countries to FNAL  C. Share resources to provide common framework  D. Open the way to exploit coming high speed European networks to build a common (disk resident) data set with faster access than FNAL main repository

05/23/2002Flavia Donno, INFN-Pisa12 Working plan with experiments - CDF Plan: A/B/C Create a DataTag testbed using EDG tools to allow CDF people to test job submission and scheduling tools. CDF VO in place, DOE CA accepted. Install EDG UI at FNAL. Testbed open for CDF tests. (30 Apr 2002) – DataTAG + CDF people Study the SAM environment and exploit the possibility of integrating SAM in CDF/DataTAG EDG testbed (31 st Jul 2002) – DataTAG + CDF SAM support. Study the SAM environment and exploit the possibility of integrating SAM in CDF/DataTAG EDG testbed (31 st Jul 2002) – DataTAG + CDF SAM support. Test Glue MDS schema and check if it is enough to describe SAM resources. – DataTAG + CDF SAM support. Test Glue MDS schema and check if it is enough to describe SAM resources. – DataTAG + CDF SAM support. Test current EDG/JDL and study possible extensions for SAM. – DataTAG + CDF SAM support. Test current EDG/JDL and study possible extensions for SAM. – DataTAG + CDF SAM support. Work on-going with the SAM development/support team at FNAL to converge on a plan.

05/23/2002Flavia Donno, INFN-Pisa13 Working plan with experiments - CMS  CMS (C. Grandi, P. Capiluppi): Goals:  A. Have a complete production chain driven by IMPALA/BOSS on EDG User Interface that uses the EDG Resource Broker to submit jobs to the DataGrid testbed by June CMS week. First evaluation of EDG job scheduling and submission services. (10 Jun 2002).  B. Open DataTag testbed to US CMS partners and study interoperability issues (CA's, II, RB, etc...). This implies the study of the packaging tools used in EDG and iVGDL. First set or requirements. (31 Jul 2002)  C. Install US grid software on DataTag resources. Study the possibility of submitting jobs from EDG testbeds to iVDGL test layouts – Compatibility of common resources schemas. First evaluation of iVDGL job scheduling, submission and monitoring services (31 Jul 2002)  D. Request for some million events similar (all chain in a single job). Tony Wildish proposed to try to produce them using the grid test layout.

05/23/2002Flavia Donno, INFN-Pisa14 Working plan with experiments - CMS Plan: A Use DataTag testbed as development environment to define CE, SE, WN. Installation kits and UI configuration with IMPALA/BOSS to submit Pythia and cmsim jobs (30 Apr 2002) - CMS people. Test Replica Catalogue registration and file replication (7 may 02) - CMS + DataTAG people Test Replica Catalogue registration and file replication (7 may 02) - CMS + DataTAG people Use DataTag testbed to develop what needed to submit ORCA jobs. (10 Jun 02) - CMS people Use DataTag testbed to develop what needed to submit ORCA jobs. (10 Jun 02) - CMS people B Develop DataGrid software packaging and distribution independent on LCFG. First report (30 Apr 02) - DataTag people Setup CMS VO and open it to iVGDL (30 Apr 02) - DataTag people Setup CMS VO and open it to iVGDL (30 Apr 02) - DataTag people Define commonly recognized CA's for US (31 May 02) - DataTag people Define commonly recognized CA's for US (31 May 02) - DataTag people EDG release deployment on some US sites (31 May 02) – DataTag people EDG release deployment on some US sites (31 May 02) – DataTag people Test worldwide production with EDG software (31 Jul 02) - CMS + DataTAG people Test worldwide production with EDG software (31 Jul 02) - CMS + DataTAG people

05/23/2002Flavia Donno, INFN-Pisa15 Working plan with experiments - CMS Plan: CInstall US grid software on DataTag resources (it depends on B.1 -> B.3)(31 May 02) - DataTag people DStart MB production with EDG software in EU only (17 Jun 02) - CMS people (it depends on A) Start MB production with EDG software worldwide (31 Jul 02) - CMS people (it depends on B) Start MB production with US software (31 Jul 02) - EU CMS people driven by CMS-US people (it depends on C)

05/23/2002Flavia Donno, INFN-Pisa16 Organization and Conclusions  Job organization internally in DataTAG.  Establish commonalities among test layouts.  Establish a working plan with iVDGL.  Interoperability tests with US.  SC2002 demo ?