07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

The GEO 600 Detector Andreas Freise and the GEO 600 Team University of Hannover May 20, 2002.
24. June 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory SPIE Glasgow 2004.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Use ofSiesta in VIRGO commissioning Lisa Barsotti University of Pisa – INFN Pisa For the Virgo collaboration Caltech, December 19th 2003.
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
GEO600 Harald Lück Ruthe, Worldwide Interferometer Network.
Virgo Control Noise Reduction
GWADW, May 2012, Hawaii D. Friedrich ICRR, The University of Tokyo K. Agatsuma, S. Sakata, T. Mori, S. Kawamura QRPN Experiment with Suspended 20mg Mirrors.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
Interferometric detector for GW: status and perspectives Giovanni Losurdo INFN Firenze-Urbino
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
CALVA : A test facility for Lock Acquisition F.Cavalier 1 on behalf of CALVA team : M.-A.Bizouard 1, V.Brisson 1, M.Davier 1, P.Hello 1, N.Leroy 1, N.Letendre.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
VIRGO LAPP – Annecy NIKHEF – Amsterdam INFN – Firenze-Urbino INFN – Frascati IPN – Lyon INFN – Napoli OCA – Nice LAL – Orsay ESPCI – Paris INFN – Perugia.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
ACIGA High Optical Power Test Facility
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
ALIGO 0.45 Gpc 2014 iLIGO 35 Mpc 2007 Future Range to Neutron Star Coalescence Better Seismic Isolation Increased Laser Power and Signal Recycling Reduced.
The VIRGO detection system
L’Interferometro Virgo Michele Punturo INFN Perugia a nome della Collaborazione Virgo.
Active Vibration Isolation using a Suspension Point Interferometer Youichi Aso Dept. Physics, University of Tokyo ASPEN Winter Conference on Gravitational.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Automation of the Lock Acquisition of the 3 km Arm Virgo Interferometer F. Carbognani for The Virgo Collaboration ICALEPCS - Geneva 14 October, 2005.
Calva update Nicolas Leroy for the CALVA group (LAL, ESPCI, LAPP, LMA) Main Laser Cavity 1Cavity 2 Aux. Laser L1 L2 M1M2M3.
Present Status of the Virgo Experiment
The Proposed Holographic Noise Experiment
Nergis Mavalvala Aspen January 2005
Nergis Mavalvala MIT IAU214, August 2002
Superattenuator for LF and HF interferometers
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Status at the Prague meeting
Presentation transcript:

07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory

07. July 2004 Andreas Freise The VIRGO Collaboration VIRGO is an Italian-French collaboration for Gravitational Wave research with a ground-based interferometer. ITALY - INFN Firenze-Urbino Frascati Napoli Perugia Pisa Roma FRANCE - CNRS ESPCI – Paris IPN – Lyon LAL – Orsay LAPP – Annecy OCA - Nice

07. July 2004 Andreas Freise The European Gravitational Observatory Last mirror installed June 2003 Inauguration August 2003

07. July 2004 Andreas Freise Expected Sensitivity

07. July 2004 Andreas Freise The VIRGO Interferometer Laser 20 W Output Mode Cleaner 4 cm long Michelson Interferometer with 3 km long Fabry-Perot cavities in the arms and Power Recycling Input Mode Cleaner 144 m long

07. July 2004 Andreas Freise Main Optics High quality fused silica mirrors 35 cm diameter, 10 cm thickness Substrate losses 1 ppm Coating losses <5 ppm Surface deformation /100 (rms on 150mm) R: <10 -4

07. July 2004 Andreas Freise Vacuum System Two tubes: 3 km long, 1.2 m in diameter, installed and tested, in vacuum since June 2003, mbar All tower (6 long, 2 short) pumping systems: installed, tested and put in operation, mbar Tubes Towers

07. July 2004 Andreas Freise The Suspension System The Superattenuator (SA) is designed to isolate the optical components from seismic activities (local disturbances). It is based on the working principle of a multistage pendulum. Expected Hz: Residual mirror motion (rms) rotation <1  rad longitudinal <1  m

07. July 2004 Andreas Freise The Top Stage Top of an inverted pendulum: - Inertial damping (70 mHz to 5 Hz) - Possibility to move the suspension point with small forces

07. July 2004 Andreas Freise Passive Filters Five seismic filters: Suspended by steel wires Vertical isolation by a combination of cantilever springs and magnetic anti-springs

07. July 2004 Andreas Freise The Local Control Marionette control: CCD camera, optical levers and four coil-magnet actuators: <2 Hz

07. July 2004 Andreas Freise Fast Control (Global) Reference mass and mirror, four coil-magnet actuators: >2 Hz

07. July 2004 Andreas Freise Injection System 20 W Nd:YAG master-slave laser Input mode cleaner: 144 m long ring cavity Reference cavity: 30 cm long ring cavity, mirrors contacted to a rigid ULE spacer Both cavities: Finesse=1000 IMC RFC

07. July 2004 Andreas Freise Laser Located on an optical table outside the vacuum Nd:YAG master commercial CW single mode (700 nm Phase locked to a Nd:YVO 4 slave (monolithic ring cavity) Pumped by two laser diodes at 806 nm (40 W power) Output power: 20 W Slave Master

07. July 2004 Andreas Freise Input Mode Cleaner Triangular cavity, 144 m long, Finesse=1000 Input optics and two flat mirrors are located on a suspended optical bench End mirror suspended with a reference mass for actuation Transmission 50% Injection Bench Mode Cleaner Mirror

07. July 2004 Andreas Freise Detection System Suspended bench in vacuum with optics for beam adjustments and the output mode cleaner (OMC) Detection, amplification and demodulation on external bench Suspended bench External bench Output Mode-Cleaner

07. July 2004 Andreas Freise Output Mode Cleaner Output Mode-Cleaner Detection Bench 4 cm long ring cavity Suppression of TEM 01 by a factor of 10 Length control via temperature (Peltier element) Lock acquisition takes 10 min, lock accuracy is /60000

07. July 2004 Andreas Freise Photo Diodes 16 InGaAs diodes for the main beam (dark port) 6 additional photo diodes (and 8 split photo diodes) for control purposes External bench Output Mode-Cleaner

07. July 2004 Andreas Freise Data Acquisition and Storage 16-bit ADCs, up to 20 kHz sampling frequency Data is transferred via optical links to workstations and then written to disk in Frame format: - full signal - down-sampled to 50 Hz - down-sampled to 1 Hz (trend data) Frames available for data monitoring with 3 s delay Current rate: 7 Mbytes/s (compressed) On-site storage on spinning media: - 5 TB for online analysis - 70 TB for offline analysis

07. July 2004 Andreas Freise Control Fully digital control, local and global Feedback is send with 20-bit 10kHz to the suspensions The suspension control is performed by decicated DSPs (one per suspension) Interferometer signals are acquired with 16-bit 20 kHz. The data is transferred via optical links to Global Control, a dedicated hard and software that computes correction signals and sends them to the mirror DSPs

07. July 2004 Andreas Freise Computer Control Monitoring and control of the detector by scientists and operators using: - 10 workstations - a digital video system

07. July 2004 Andreas Freise Digital Video System Digital processing of video images

07. July 2004 Andreas Freise Video Surveillance

07. July 2004 Andreas Freise DSP / Suspension Control

07. July 2004 Andreas Freise Data Display

07. July 2004 Andreas Freise Database

07. July 2004 Andreas Freise Supervisor

07. July 2004 Andreas Freise Current Status Commissioning of the central interferometer and the injection system from 2001 to 2003 Since September 2003 commissioning of the two arms and the full interferometer At the end of this year the detector is planned to be operated in its final configuration Scientific data taking starts 2005 Central Interferometer (CITF)

07. July 2004 Andreas Freise Commissioning of VIRGO The commissioning of the full detector is divided into three phases: Phase A: the 3 km long arm cavities separatly Phase B: recombined Michelson interferometer Phase C: Michelson interferometer with Power Recycling Currently we have completed phase B.

07. July 2004 Andreas Freise Commissioning Runs C1: November 2003 North arm cavity longitudinally controlled C2: February 2004 North arm cavity with longitudinal and angular control C3: April 2004 Recombined interferometer North arm with second stage of frequency stabilisation C4: June 2004 Recombined interferometer with angular control and second stage of frequency stabilisation Continuous data taking periods are scheduled every second month:

07. July 2004 Andreas Freise Sensing and Control Modulation-demodulation scheme with only one modulation frequency (6 MHz) to control: 4 lengths 10 angles

07. July 2004 Andreas Freise North Arm Cavity PR misaligned West arm misaligned Phase A: the two arm cavities are used separatly, starting with the north arm; control systems are to be installed and tested.

07. July 2004 Andreas Freise North Arm Cavity In October 2003 the North arm cavity was locked on first trial using a control algorithm that was tested before with SIESTA, a time domain interferometer simulation The West arm cavity was locked in December 2003

07. July 2004 Andreas Freise North Arm Sensitivity

07. July 2004 Andreas Freise North Arm Sensitivity Sensitivity limited by frequency noise between 7 Hz and 4 kHz (C1) By reducing the bandwidth of the IMC control loops the frequency noise could be improved The noise below 4 kHz (C3) still originates in the injection system but is not fully understood

07. July 2004 Andreas Freise Recombined Interferometer Phase B: Recombined Interferometer - B2 (P) used to control common mode (L1+L2) - B2 (Q) used to control beam splitter - B1/B1’ used to control differential mode (L1-L2) PR misaligned Recombined locked in February 2004

07. July 2004 Andreas Freise Automatic Alignment Anderson technique: - Modulation frequency coincident with cavity TEM 01 mode - Two split photo diodes in transmission of the cavity (at two different Guoy phases) - Four signals to control the 2x2 mirror angular positions (NI, NE)

07. July 2004 Andreas Freise Automatic Alignment Alignment control allows to switch off local controls Power inside the cavities becomes more stable Installed and tested for the recombined interferometer Bandwidth ~3 Hz Residual fluctuations ~0.5 urad rms (1 10 Hz)

07. July 2004 Andreas Freise Automatic Alignment

07. July 2004 Andreas Freise Frequency stabilisation The `second stage´ of frequency stabilisation The laser frequency is stabilised to the common lengths of the arm cavities (bandwidth ~17 kHz) The arm cavities are stabilised to the reference cavity (bandwidth ~2 Hz) Gains of the frequency control loops are increased

07. July 2004 Andreas Freise Present Sensitivity

07. July 2004 Andreas Freise Conclusions The construction of VIRGO is finished, the commissioning of the full instrument is underway Both arm cavities were put into operation, longitudinal and angular control were implemented The injection system and the detection system with both mode cleaners are used routinely during the commissioning The detector is now used in the recombined mode with automatic mirror alignment and the second stage of frequency stabilisation Starting now the final configuration including Power Recycling will be implemented The first scientific data runs are planned for next year

07. July 2004 Andreas Freise End

07. July 2004 Andreas Freise Frequency stabilisation The pre-stabilisation of the laser frequency was succesfully tested in the central interferometer The frequency noise of the pre-stabilised laser limits the sensitivity over a wide range The second stage required for the designed stability was completed in June 2004 The performance will be tested in the commissioning run (C4) starting today

07. July 2004 Andreas Freise Recombined Interferometer Sensitivity below 300 Hz limited by electronic noise from a temporary sensor setup