A6: Team Rallye Potable Water Still Presented by: Tim Rodts October 26, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.

Slides:



Advertisements
Similar presentations
Mechanical Engineering: Motion Transmission
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
FIRE FIGHTING ROBOT ELECTRO-MECHANICAL SYSTEMS TERM PROJECT 1
Pedal Purification University of Notre Dame Senior Design Group A6 November 28, 2006 Team Rallye (from left): Nicole Del Rey Eric Sabelhaus Mike McConnell.
Chapter 11 Keys, Couplings and SealsRJM 3/16/04 Chapter 11 - Keys, Couplings and Seals How attach power transmission components to shaft to prevent rotation.
March 4, 2005 All rights reserved Torque – Angle in Slip Ring - Non-Contact Rotary Torque Sensor Installation Tips Foot mount torque sensor Driver Load.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
A6: Team Rallye Potable Water Still Presented by: Tim Rodts September 14, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
Critical Design Review 12/7/04 Team Uno Bunker Curnes Shawn Houlahan Stephanie Rohrs Steve Schwall Chuck Smith.
PDR: 3/27/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
Pinwheel Technologies (C3)
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
PDR: 2/21/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Toteable, Potable Water A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Toteable, Potable Water A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
PDR: 3/20/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
ME 495 EV Team 3: Adapter Plate Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
Mechanical Engineering Drawing MENG 204
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey October 3, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey November 9, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Section 3-5,6 Keys and Couplings MET 301. Keys Key is used to transmit torque between shaft and the component mounted on the shaft. Square and flat keys.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Team Bob ME 4182 Capstone Design Michael Galvin Rick Rogers Jennifer Edwards Hayato Shimizu Louay Abdul-Hadi.
VEX Structure.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
Team A ECE 496: Gyrobot Michael Tan Trey Moran Rod Petak Rob Slater Quy Quan.
Group A6 Pedal-Powered Purifier (PPP) Presented by: Eric Sabelhaus September 7, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
A6: Team Rallye Potable Water Still Presented by: Eric Sabelhaus October 12, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
Motion Transmission Systems 1. the mechanical fxn of relaying motion from 1 part to another without altering the nature of the motion 2. a set of components.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 21, 2008.
Human-Powered Potable Water Still A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
A6: Team Rallye Potable Water Still Presented by: Mike McConnell November 2, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
MID-TERM PRESENTATION June 21, 2000 Contents Week 1: Team Selection Week 2: Project Bids/Selection Week 3: Problem Statement, Design Partition Week 4:
Toteable, Potable Water A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
Components/purpose (Terminology) Engine Flywheel – keeps the engine running smoothly but also provides a flat smooth surface that the Centre Plate is pushed.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Rear Cover Assembly The Toodle comes with the rear cover assembled. Normally, there is no need to open the rear cover. In case the rear bearing is stuck.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
INTRODUCTION About 13 people die every hour due to automobile accidents in India. About 36% of these accidents are due to negligence in lifting the side.
Chapter 11 - Keys, Couplings and Seals
Rear end assembly.
Gear box for BWM power Generation
SuperQuest Salem Motion.
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Rear Cover Assembly.
Gear Trains.
Open Differentials By Jarvis Lu
MSD P15280 RIT HOT WHEELZ TEST BENCH
Rear Cover Assembly.
Metric Unit Conversion: Lengths
1.9: Drive Train.
After service guide for changing PCB
Robotics Belts, Chains, Sprockets and Gears
Presentation transcript:

A6: Team Rallye Potable Water Still Presented by: Tim Rodts October 26, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus

Design Status Power Power  Pedals  Gears  Generator Heat Source Heat Source  Ceramic bowl with embedded wire heats sand; in turn heats container. Polluted water container Polluted water container  Beaker Intelligence Intelligence  Temperature Sensor with DisplayWebsite Website

Design Status ‘Inspired’ by ASME guidelines ‘Inspired’ by ASME guidelines Currently ahead of schedule as far as starting to build prototype Currently ahead of schedule as far as starting to build prototype Cannot program microcontroller without temperature sensor Cannot program microcontroller without temperature sensor SHOWSTOPPER: SHOWSTOPPER: Designing/purchasing shaft coupler that will accommodate metric generator shaft. Designing/purchasing shaft coupler that will accommodate metric generator shaft. Packaging of all components. Packaging of all components.

Semester Outlook ! In the works

Action Items from Week 8 (10/10)

-1-  There will be no sealant on the ceramic bowl.  Sand will be placed in bowl. A beaker will sit in the sand.

-2-  Condenser connection to polluted water container now simplified.  Rubber stopper with a direction connection to the polluted water container.

-3-  Front post now designed to pivot.  Rear connections permanent.  Will optimize rider comfort.  Avoids pre-stresses on base. Pivot joint

Action Items for Week 10 (10/31)

-1- Order bearings for sprocket shaft. Order bearings for sprocket shaft. 8 mm shaft diameter 8 mm shaft diameter 39 mm hole-to-hole length. 39 mm hole-to-hole length. Above dimensions are have been chosen to fit safely within ring of screws necessary to mount sprocket. Part #: 1434K33 Part #: 1434K33 Price: $8.11 each Price: $8.11 each

-2- Design/order shaft coupler Design/order shaft coupler Needs to couple 2 shafts, 8 mm in diameter. Needs to couple 2 shafts, 8 mm in diameter. Needs to transmit 100% of 26 N-m of torque. Needs to transmit 100% of 26 N-m of torque. Clamping coupler vs. set-screw coupler. Clamping coupler vs. set-screw coupler.

-3-  Continue building CAD models of all individual parts.  Create assembly.  Will allow us to troubleshoot space and packaging issues not currently visible.

Questions?