Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.

Slides:



Advertisements
Similar presentations
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Advertisements

British Columbia Jurisdictional Update Pacific States / British Columbia Oil Spill Task Force AGM September 2013, Seattle, Washington Wes Shoemaker, Deputy.
The role of information in water-related decision making.
Baffinland Mary River Project Environmental Assessment Methods Marine Environment VECs Workshop Session 02 November 2011.
Environment Canada Presentation to Nunavut Impact Review Board Regarding Baffinland Mary River Project NIRB Prehearing Conference Pond Inlet and Igloolik,
Mary River Iron Ore Project Pre Hearing Conference and Community Roundtable Government of Nunavut Igloolik and Pond Inlet November 6-10, 2011.
Introduction to Civil Engineering
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
April 5, 2012 Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Todd Bragdon, CDM Smith Brandon Ball, Parametrix Bill Adams,
Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.
Mary River Project Early Revenue Phase NPC Oral Hearings January 2014.
Baffinland Iron Mines Mary River Project November Pre-Hearing Conference Igloolik & Pond Inlet.
State Climate Change Policy: Mitigating, Preparing, Adapting W. Spencer Reeder WA Dept. of Ecology March, 2009.
NUNAVUT IMPACT REVIEW BOARD Targeting Increased Effectiveness in a Changing Landscape Nunavut Mining Symposium, Iqaluit, April 17, 2012.
Baffinland Iron Mines Mary River Project November 2011 Community Round-Table Igloolik and Pond Inlet.
Climate Change and Future Scenarios in the Arctic A Canadian Perspective Venezia, December 2014.
Where IOOS Meets the Land and Atmosphere: Assessing/Mitigating Risks of Current & Prospective Coastal Inundation/Erosion Alaskan Coastal Climatology Workshop.
RISK BASED ENVIRONMENTAL ASSESSMENT RISK-BASED ENVIRONMENTAL ASSESSMENT Simon Catchpole Porto, May
HSRP Spring Meeting May 4, 2011 David M. Kennedy.
Kiggavik Project Final Hearing Presentation
Emergency Response & SAR. Project Infrastructure Steensby Infrastructure Ore dock and freight dock Fuel depot – 160 ML Arctic diesel – 50 ML Marine diesel.
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
Inuit Qaujimajatuqangit. Traditional knowledge –Selection based on: same as archaeology boundary Kugluktuk traditional area travel routes Nunavut - NWT.
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
Overview of NLCA (b) Igloolik & Pond Inlet November 2011.
Natural Resources Canada : Regulatory Responsibilities Mineral Advisory Group Meeting (MDAG) Newmont Mining Corporation Doris North Project / Phase II.
CCIC Workshop Whitehorse January, 2012 LOOKNorth : Investing in remote sensing in a changing Northern Canada.
Keith Alverson Ocean Observations and Services Intergovernmental Oceanographic Commission of UNESCO NASA, NOAA, JCOMMOPS, FNMOC, CRT, URK.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
NIRB Hearings Cumberland Resources Ltd Meadowbank Gold Project: NRCan Technical Review of the FEIS March 27-31, 2006.
The Perspectives and Challenges of Transnational Cooperation in the next European Funding Period Fontwell Park, 17 October 2006 Julia ERIPRET,
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
Jason Christian Candidate Reflections November 2011 Environmental Engineering Research & Teaching Faculty Position.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Environment Canada’s Mandate and Role in the Mary River Project Review Water Board Community Meetings - Baffinland Pond Inlet, NU Mark Dahl / Anne Wilson.
NRCan’s Expertise Geohazards (earthquakes, landslides etc.) Geoscience (marine and coastal geology, and landscape processes, groundwater etc.) Permafrost.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
1. The OSCE role in fostering transport development Gabriel Leonte, Economic and Environmental Adviser 4 th Expert Group Meeting on Developing Euro-Asian.
Coastal Research in the U.S. Army Corps of Engineers
OCEAN SCIENCE AND INTEGRATED OCEAN POLICY Savi Narayanan Canada 1 CPPS Workshop Bogota, Columbia 28 October 2015.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
KNK5 wmoEp5 vtmp5 GwmoEp5H kNo1k5 ne6tbw5 ckE5]giz “A” wm6j5 Mwnodt5 W5J]y5 b5hjz X=8M8 xwC8 s/C4ys6t5 fxS]En8 GX=8M8f5H k9]l/4 WoExz Community Session.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
Tables rondes 3-5 juin 2013 Governance and Geopolitics Synthesis of results from the forum of discussion Cecile Pelaudeix (Sciences Po, Lyon) Anne Choquet.
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Doris North Gold Mine Project Presentation to the Nunavut Water Board Technical Meeting Cambridge Bay, NU January 28-29,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Title.
Mining and shipping traffic in the Canadian Arctic
Meadowbank Water License Renewal
The STA`s mandate To be responsible for the long-term planning of the traffic system for road and rail transport, shipping and aviation . To be responsible.
Change Monitoring Landsat Data Archive
Mary River Project Phase 2 Proposal
Mary River Project Phase 2 Proposal Freshwater Environment
Contact: Observational Evidence of Climatic Warming-Induced Decline in Caribou Habitat Quality and Population I am a senior research.
Mary River Project Phase 2 Proposal
Phase 2 – Technical Meetings
WHALE TAIL PIT Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011

Outline 1.Mandate & role 2.Technical Review Recommendations  Earth sciences 3.Questions

NRCan’s Mandate Natural Resources Canada (NRCan) seeks to enhance the responsible development and use of Canada’s natural resources and the competitiveness of Canada’s natural resources products.

NRCan’s Role in this review  Regulatory role – Explosives Act  Earth sciences expertise:  Permafrost and Geotechnical Science  Coastal Geomorphology, Climate Change  Geotechnical Engineering and Natural Hazards

Technical Review Recommendations - Permafrost and Geotechnical Science  NRCan provided 12 recommendations regarding:  Maintaining waste rock pile frozen conditions  Modelling to ensure a permafrost barrier the diversion berms  Railway terrain analyses  Environmental monitoring and management methods for the railway corridor

Technical Review Recommendations - Coastal Geomorphology  NRCan provided 27 recommendations regarding:  Coastal change due to ship wake  Climate change impacts on coastal infrastructure  Slope and permafrost information for Milne port and subsea permafrost presence at Steensby port  Shoreline change information regarding the Milne Port freight dock effects on Philips Creek spit

Technical Review Recommendations - Geotechnical Engineering and Natural Hazards  NRCan provided 7 recommendations regarding  Waste rock pile – sludge volume, stability, post-closure monitoring  Railway tunnel early warning systems during rockfall events  Spill contingency plans for borrow pits

Baffinland Iron Mine Corporation (BIMC) Commitments  BIMC’s commitments (October 28, revised November 4) address 28 of NRCan’s 46 recommendations  NRCan and BIM met on Oct. 20, 2011 to discuss specific recommendations related to primarily to wake effects and sediment movement at Milne Port

NRCan Outstanding Recommendations NRCan would like to clarify certain BIMC commitments made during the technical meetings, e.g., Ship wake assessment Hydrodynamic and sediment transport models NRCan can continue to work with BIMC to discuss and resolve technical issues identified in commitments, e.g.: Permafrost and the design approach for the waste rock pile Remote sensing of bottom-fast ice Existence of subsea permafrost Estimates of sea level rise

Matna and Thank you!