Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.

Slides:



Advertisements
Similar presentations
EIDE System Requirements and Specification Documents
Advertisements

“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
0 DOD/DT/CEDCV – 20 th & 21 st January Paris meeting SAGEM RTD Activities C2-Sense project Paris – 20 & 21 January 2015.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Issues of Security and Privacy in Networking in the CBA Karen Sollins Laboratory for Computer Science July 17, 2002.
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 PAP8/14 Webconference December 4, 2012.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
EPRI Smart Grid Demonstration and CIM Standards Development
MTEI Methods & Tools for Enterprise Integration
Final Design and Implementation
> Blueprint Kickoff >. Introductions Customer Vision & Success Criteria Apigee Accelerator Overview Blueprint Schedule Roles & Responsibilities Communications.
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
1 Parani-MSP1000 for Bluetooth Proximity Marketing SENA Technologies
Copyright © 2006, SAS Institute Inc. All rights reserved. What Is New in SAS Profitability Management (PrM) 2.1? Authors: Jack Zhang Solution & Version:
1 © 2005 Cisco Systems, Inc. All rights reserved. Cisco Unity Connection 1.x Documentation What you need to know.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.
1 Session Number Presentation_ID © 2001, Cisco Systems, Inc. All rights reserved. Using the Cisco TAC Website for IP Routing Issues Cisco TAC Web Seminar.
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Interoperability Tests for IEC Scott Neumann November 12, 2009.
T Network Application Frameworks and XML Web Services and WSDL Sasu Tarkoma Based on slides by Pekka Nikander.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
Common Information Model and EPRI Smart Grid Research
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
Your project title here Your name Construction Management University of Houston PROGRESS REPORT Reporting Period: From date – To date.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/21/2011.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Bootcamp – Network Interoperability] Date Submitted: [February.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Gerald R. Gray Title Event Date 2012 PowerPoint Template Version 2.0.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
Web Services Based on SOA: Concepts, Technology, Design by Thomas Erl MIS 181.9: Service Oriented Architecture 2 nd Semester,
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2011 EnerNex. All Rights Reserved. Lemnos Interoperable Security Project Background and Benefits 8/11/2011.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
CIM Test Methodology Overview John Simmins 5/24/2011.
BLISS Problem Statement Jonathan Rosenberg Cisco.
1 Session Number Presentation_ID © 2002, Cisco Systems, Inc. All rights reserved. Using the Cisco TAC Website for Security and Virtual Private Network.
0 0 Mainframe Legacy Access Migration (MLAM) Non-Executive Branch Agency Meeting 8/18/2015 & 8/20/2015.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
CIM Test Methodology Overview John Simmins 5/3/2011.
# 1 Application Integration Architecture A Framework For Standard Interface Development Gerald R. Gray, Consumers EnergyJune 23, 2008.
Project CIM Test Development Process
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona May “ System Interfaces for Distribution Management “ TC57 WG14 Standards IEC
How to Setup Scan to on most Sharp Models.
CIS 4910 Information Systems Development Project Project Documentation.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for IP Routing.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Physical Data Model – step-by-step instructions and template
CIM Test Development Process
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
CIM Test Methodology Overview
The Effects of Poster Format on Reading Time
SysML 2.0 Interface Concepts Modeling Core Team Status Update
Authors and Institutions Can Go Here
The Effects of Poster Format on Reading Time
This is the title This is a subheading This is body text Bullets 1
Insert Your Poster Title Here
Introduction to SOA Part II: SOA in the enterprise
InterOp Technical Notes
Conclusion & Discussion Research purposes/ Research hypothesis
Presentation transcript:

Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

2 © 2010 Electric Power Research Institute, Inc. All rights reserved. CIM Test Process Overview CIM Test Methodology compatible with –IEC WG 14 –CIM Users Group –OpenSG And possibly MultiSpeak Test process defined, documented and repeatable Vetted with multiple utilities, vendors and user groups Tests designed for multiple implementation environments (test only messages, implementation agnostic) –Legacy point-to-point –SOA with or without ESB –Various ESBs (WebSphere, WebLogic, TIBCO, GlassFish) Tests openly available

3 © 2010 Electric Power Research Institute, Inc. All rights reserved. Schedule & SOW Task Deliverables

4 © 2010 Electric Power Research Institute, Inc. All rights reserved. Types of CIM-based Tests CIM Tests Abstract Test Cases Conformance Tests Interoperability Tests Concrete Detailed Test Procedures Conformance Tests Interoperability Tests

5 © 2010 Electric Power Research Institute, Inc. All rights reserved. Basic Title and Text Layout With Subheads and Take-Away Box Subhead This is first level bullet text –This is second level bullet text This is third level bullet text Subhead This is first level bullet text –This is second level bullet text This is third level bullet text Subhead This is first level bullet text This is a take-away box that fades in automatically

6 © 2010 Electric Power Research Institute, Inc. All rights reserved. Abstract Test Conformance Case Development Process with Example

7 © 2010 Electric Power Research Institute, Inc. All rights reserved. Abstract Interoperability Dev. Process

8 © 2010 Electric Power Research Institute, Inc. All rights reserved. Next Steps Review and update sample abstract test case –Walked through with group 1/18/2011 Instructions and procedures to connect up to an web service endpoints (e.g. MDMS & CIS) POCs at Utilities/EPRI to coordinate testing POCs at venders

9 © 2010 Electric Power Research Institute, Inc. All rights reserved. Status of Next Steps Write detailed sample concrete test procedure –Exchange of security certificates Certificate exchange Code examples –Firewall setting Permission from relevant IT organization Port and IP address –Address Venders’ IPR concerns –ESB setup and cross-ESB configurations –POC information of people responsible for executing tests at Utilities, Venders and EPRI.

10 © 2010 Electric Power Research Institute, Inc. All rights reserved. Walkthrough of Interoperability Test Procedure