California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.

Slides:



Advertisements
Similar presentations
1 Minimum Generation Emergency Operating Reserve Proposal Gary Zielanski Markets Committee Meeting September 30, 2004.
Advertisements

Demand Response Commissioner Suedeen Kelly June 3, 2008.
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Distributed Generation (DG)
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
PacifiCorp-CAISO EIM Initiative Overview
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
 High focus on IT talent management and high-quality, professional recruitment service  Strong customer base of end user companies, technology and consulting.
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
1 Nodal Stabilization Market Call December 28, 2010.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Logistic services. 1. Company overview  MSL Logistical Services was founded in 2009 as a response to pharmaceutical market requirements.  Certifications.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
Demand Response in Midwest ISO Markets February 17, 2008.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
OSC Meeting April 27, Transmission Cost Allocation Overview.
CALIFORNIA ENERGY COMMISSION Status Report Demand Responsive Building Program William J. Keese California Energy Commission March 30, 2001.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/15/01 Kyle Hoffman.
Bulk Power Transmission System
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Reliability Demand Response Product February 25, 2011
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
ISO Comparison – CAISO Alex Lee (ERCOT)
Managing Reliability and the Markets with PI
Overview Art Deller, P.E. Supervisor, Model Administration New Resource Workshop May 28, 2014.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
ERS Update – DSWG Presentation September 21, 2012.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Nodal Protocol Revision Request (NPRR) TITLE: Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin March.
Distributed Generation Registration June 30, 2008.
CEC Project “Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability” Sunil Chhaya Principal Investigator.
14 Minute Ramp Period Testing Workshop June 30, 2009.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
EE/Econ 458 Market Overview: Time-Line and SCUC, RAC, SCED J. McCalley 1.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Oracle apps scm Online Training & Corporate Training Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC.
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
Wind Management at MISO
Overview of the NYISO Demand Response Programs
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
DCPP Curtailment Guidelines
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer
Interconnection Practice, Policies, Procedures ComEd Illinois
Pseudo-tie business procedure
New England Electricity Restructuring Roundtable
PacifiCorp-CAISO-NVE EIM Initiative Overview
Pseudo-tie business procedure
Presentation transcript:

California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman

California Independent System Operator PG Certification Process Overview –Contracts –ISO Metering & Energy Communication Network –Telemetry –Ancillary Services Certification –Automated Dispatching System –Certified Scheduling Coordinator

California Independent System Operator PG Certification Process Applicable to: –New Generators –Restarts/Repowers –“QF conversions” upon release from IOU Standard Offer contract * ISO expediting PG Certification for Summer 2001 Reliability Generation

California Independent System Operator PG Certification Process Execution of Contractual Agreements with the ISO –Participating Generator Agreement –Meter Service Agreement for ISO Metered Entities –

California Independent System Operator PG Certification Process ISO Metering Installation –Metering Guidelines ( elines/index.html) –Installation of ISO Specification Metering by a certified installer –Certification of meters by an independent certification company –ISO Energy Communications Network (ECN) “ExtraNet” Connectivity

California Independent System Operator PG Certification Process Energy Management System (EMS) Visibility – SCADA/Telemetry –Required of ALL generators 10 MW or greater –Required of generators 1 MW or greater participating ISO Ancillary Services (A/S) Markets –Telemetry Standards (

California Independent System Operator PG Certification Process Ancillary Services (A/S) Certification –Required of generators participating in ISO Operating Reserves Capacity or A/S Markets –A/S Certification Testing and Request Form ( –ISO Operating Procedure G “Management of Ancillary Services Certification Testing” –Pmax, ramp rates, AGC response

California Independent System Operator PG Certification Process Automated Dispatch System (ADS) Connectivity –ISO “Electronic Dispatch” system ( –Required of all “dispatchable” resources, participating in ISO Real Time (RT) Energy Market

California Independent System Operator PG Certification Process Select a Certified Scheduling Coordinator (SC) to Schedule Unit’s Operation within California ISO Control Area - SC schedules generator’s power flow - ISO reads meter via ECN - ISO settles grid charges with generator’s SC

California Independent System Operator ISO Market Services For information on the ISO Participating Generator Certification Process, please contact Client Relations at: – –