1 Cost Effectiveness (CE) and Incremental Cost Analyses (ICA) “IWR-Planning Suite” Ch 6 Mod 5 ENVIRONMENTAL PLANNING.

Slides:



Advertisements
Similar presentations
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Advertisements

Project Appraisal Module 5 Session 6.
U.S. Fish & Wildlife Service Conserving the Nature of America Step 7 Identify Population Objectives Population Objective is set here.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
The Value of What We Do Dan Phalen US EPA Region 10.
Economic Guidance Summary The Basis for Benefit-Cost Analysis in the Corps.
US Army Corps of Engineers BUILDING STRONG ® A New Indicator of Ecosystem Restoration Benefit: The Biodiversity Security Index Richard Cole Environmental.
Chapter 2 Analyzing the Business Case.
Project WILD. What the Public Should Know  Fish and wildlife resources are a public trust  Conservation and management of terrestrial and water resources.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY 11 LARGE GROUP RESPONSE EXERCISE.
Capitol Hill Oceans Week Wetlands Restoration Panel June 8, 2005 JOHN H. DUNNIGAN Ecosystem Goal Lead Capitol Hill Oceans Week June 8, 2005.
References to Economic Instruments in Selected MEAs Matthew Stilwell Matthew Stilwell.
SPONSOR of 4R Nutrient Stewardship Program. The Nature Conservancy Teaming with the Florida agriculture industry to increase farmer profitability and.
Systems Analysis and Design 9th Edition
Tracie Billington, P.E. Chief Financial Assistance Branch Department of Water Resources.
Chapter 2.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Cost Effectiveness/ Incremental Cost Analyses & Applications to Indian River Lagoon Ecosystem Restoration Project Leigh Skaggs, HQUSACE Planners’ Core.
1 Building Strong! THE ECONOMIST’S ROLE Ken Claseman Senior Policy Advisor for Economics Office of Water Project Review HQUSACE
Defining Responsible Forest Management FSC Forest Certification Standards Defining Responsible Forest Management Version:
Ecosystem Restoration Module ER4: Cost Effectiveness/Incremental Cost Analysis and the NER Plan BU ILDING STRONG SM.
NED COSTS And Other Bewilderments Of COE Planning And Other Bewilderments Of COE Planning.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Invasive Species Chapter 4 Module 5 1. Invasive Species What are they? 1) non-native (or alien) to the ecosystem under consideration and 2) whose introduction.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
State Smart Transportation Initiative October 9, 2014 Matthew Garrett Oregon DOT Director Erik Havig Oregon DOT Planning Section Manager.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
US Army Corps of Engineers BUILDING STRONG ® Cost Effectiveness and Incremental Cost Analyses Using IWR Planning Suite Planning Principles & Procedures.
The Power of Water A Regional Perspective on Water Resource Challenges and Opportunities Lester S. Dixon Director of Programs, South Atlantic Division.
BUILDING STRONG SM Plan Formulation: General Module G-1: What is plan formulation?
Module 14 STEP 8 Conduct Feasibility Study Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Roles of Economists and New Analytical Requirements
US Army Corps of Engineers BUILDING STRONG ® STEP FIVE: COMPARE ALTERNATIVE PLANS Planning Principles & Procedures – FY11.
Setting Goals and Getting Started with Scenarios Emily McKenzie.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
1 Environmental Planning in the Army Corps of Engineers Ch 2 Mod 5 Relationship of the NEPA to Principles & Guidelines
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
TEN-T Experts Briefing, March Annual Call Award Criteria.
Civil Works Transformation Foundations of SMART Planning
Welcome To: PCC4: Economic Analysis In Planning U. S. Army Corps of Engineers Planners Core Curriculum.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.
Step 6: Plan Selection Leigh Skaggs, CECW-PC, and Erin Wilson, CEIWR Planning for Ecosystem Restoration PROSPECT 2010.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
BUILDING STRONG ® 1 Watershed Planning & the Corps of Engineers Robyn S Colosimo USACE - Headquarters.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
1 Scenarios and More California Water Plan Advisory Committee Meeting April 14 th, 2005.
“The minimum flow for a given watercourse shall be the limit at which further withdrawals would be significantly harmful to the water resources or ecology.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
BUILDING STRONG ® TELLING THE PLANNING STORY Planning Principles & Procedures – FY11.
Preliminaries Federal/Corps Planning Process PA Program Plan Formulation Supplement - FY 08.
US Army Corps of Engineers BUILDING STRONG ® STEP 2: INVENTORY AND FORECAST Planning Principles & Procedures – FY 11.
David Moser USACE Chief Economist
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
Environmental Impact Assessment Dr. Osman Mirghani Mohamed Ali.
1 “IWR-Planning Suite” Ch 6 Mod 5 See ICA Tutorial in Reference Folder ENVIRONMENTAL PLANNING.
In the ideal world… Transportation planning addresses NEPA principles. Collaboration/involvement starts in transportation planning. Planning leads to early.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
Environmental Planning in the Army Corps of Engineers Relationship of the NEPA to Principles & Guidelines 1 Ch 2 Mod 5
Economic Analysis Watershed Rehabilitation Workshop St. Louis, MO August 20-22, 2002 Dale Pekar, Economist National Water Management Center
U.S. Fish and Wildlife Service Migratory Bird Program Conserving America’s Birds Addressing Migratory Birds in NEPA Migratory Bird Conservation for Federal.
Principles of Information Systems Eighth Edition
PRINCIPLES & GUIDELINES
Infrastructure planning and management
Environmental Impact Reports
Presentation transcript:

1 Cost Effectiveness (CE) and Incremental Cost Analyses (ICA) “IWR-Planning Suite” Ch 6 Mod 5 ENVIRONMENTAL PLANNING

2 Learning Objectives Students will be able to identify conditions under which CE/ICA is required under current Corps guidance Students will be able to identify the data required to conduct an effective CE/ICA

3 Which Scares YOU More?? OR Cost Effectiveness and Incremental Cost Analyses….

4 References ER Chapter 2, Planning Principles Chapter 3, Corps Civil Works Missions Appendix E, Civil Works Missions & Evaluation Procedures IWR Report 95-R-1 “Procedures Manual: Cost Effectiveness and Incremental Cost Analyses” IWR Report 94-PS-2 “Cost Effectiveness Analysis for Environmental Planning: Nine EASY Steps” IWR Report 02-R-5 “Lessons Learned from Cost Effectiveness & Incremental Cost Analyses”

5 Planning Guidance ER (22 April 2000) Requires CE/IC analyses for all mitigation and ecosystem restoration projects “Selecting the NER plan requires careful consideration of the plan that meets planning objectives and constraints and reasonably maximizes environmental benefits while passing tests of cost effectiveness and incremental cost analyses, significance of outputs, acceptability, completeness, efficiency, and effectiveness.” (Appendix E, E-41) CE/ICA helps support selection of mitigation plans

6 Why use CE/ICA? To make more informed decisions… document economic efficiency, make sound financial investments To make more informed decisions… document economic efficiency, make sound financial investments What are CE/ICA? Tools to inform and support environmental investment decision-making

7 CE/IC Analyses are NOT…. A substitute for the planning process A measurement technique Methods to provide a single “right” answer Basis for a Benefit Cost Ratio (BCR) - (Flood Control Act 1936) A substitute for the planning process A measurement technique Methods to provide a single “right” answer Basis for a Benefit Cost Ratio (BCR) - (Flood Control Act 1936)

8 Plan Comparison: Costs & Outputs

9 Results of Cost Effectiveness Analysis

10 Results of Incremental Cost Analysis

11 Who does CE/ICA? Interdisciplinary Team Plan formulator Biologist Economist Cost estimator H & H specialist Real estate specialist Decision maker Other disciplines Other stakeholders! Plan formulator Biologist Economist Cost estimator H & H specialist Real estate specialist Decision maker Other disciplines Other stakeholders!

12 Why is CE/ICA important to You? (Biologists and PMs) Understanding of CE/ICA concepts is needed for:Understanding of CE/ICA concepts is needed for: Formulation of environmental alternativesFormulation of environmental alternatives Development of environmental outputsDevelopment of environmental outputs MitigationMitigation Conducting CE/ICA and using IWR-Planning SuiteConducting CE/ICA and using IWR-Planning Suite Managing/monitoring contractors use of CE/ICA and IWR-Planning SuiteManaging/monitoring contractors use of CE/ICA and IWR-Planning Suite Reviewing CE/ICA resultsReviewing CE/ICA results

13 Applicability   Restoration and mitigation   All scopes of problems   All scales of projects   All phases of work   All types of resources   Many agencies and interests

14 How do you do CE/ICA? To start, you need: Solutions that address project objective(s) Independent Implementable Different scales Costs should be comparable (same level of detail) among alternatives Outputs Quantifiable and cost-related Quality as related to significance Proper Preparation Essential To start, you need: Solutions that address project objective(s) Independent Implementable Different scales Costs should be comparable (same level of detail) among alternatives Outputs Quantifiable and cost-related Quality as related to significance Proper Preparation Essential

15 : Solutions Can Consist Of: Management measures Dredging, substrate improvement, planting, removal of exotics, aerating, fencing, land management, water control structures, etc. Alternative plans Fully-formulated alternatives Different sites Independent in nature Management measures Dredging, substrate improvement, planting, removal of exotics, aerating, fencing, land management, water control structures, etc. Alternative plans Fully-formulated alternatives Different sites Independent in nature

16 Solutions Incur Costs and Produce Outputs COSTCOSTCOSTCOST

17 Environmental Costs and Outputs Quantify cost for each measure Measures are independent building blocks for each alternative These costs are in dollars No universal environmental output metric OUTPUTS increase ecosystem value; productivity, quantity & quality Quantify cost for each measure Measures are independent building blocks for each alternative These costs are in dollars No universal environmental output metric OUTPUTS increase ecosystem value; productivity, quantity & quality

18 Measurements of Environmental Outputs Can Include: Habitat units (HU’s and AAHU’s) Habitat units (HU’s and AAHU’s) Physical dimensions (acres, LF of riverine habitat) Physical dimensions (acres, LF of riverine habitat) But must includeBut must include quality dimension

19 Measurements of Environmental Outputs Can Include (Cont.): Population counts (# of birds, Kg of fish, # of adult salmon) Change in diversity (such as IBI) Resource quality must be considered as an indication of significance or resource Population counts (# of birds, Kg of fish, # of adult salmon) Change in diversity (such as IBI) Resource quality must be considered as an indication of significance or resource

20 Significance of Environmental Outputs Qualitative info critical to determining “worth” of outputs Who or what says the resource is significant? Institutional Public Technical Important info in “telling your story” Qualitative info critical to determining “worth” of outputs Who or what says the resource is significant? Institutional Public Technical Important info in “telling your story”

21 Implementation: IWR-Planning Suite   Software version of CE/ICA procedures   Automates tedious math   Allows you to do more complicated analyses   Creates tables & graphs as record of analyses   Website: Click on “products,” then “software,” then “IWR Planning Suite”

22 Step-by-step Process: Formulate plan alternatives – –Develop outputs – –Develop costs Perform cost effectiveness analysis Perform incremental cost analysis Use results for decision-making & justification of recommended plan Formulate plan alternatives – –Develop outputs – –Develop costs Perform cost effectiveness analysis Perform incremental cost analysis Use results for decision-making & justification of recommended plan

23 Cost Effective Plans: No other plan produces same level of output for less cost. No other plan produces more output for same or less cost. Unique regarding least cost per level of output. No other plan produces same level of output for less cost. No other plan produces more output for same or less cost. Unique regarding least cost per level of output.

24 Formulate All Plan Combinations 2,048 plans

25 Cost Effectiveness Analysis 92 CE plans

26 Best Buy Plans: Lowest incremental cost per unit of output Form a subset of cost effective plans Most efficient in production at given levels of output Greatest increases in output for least increase in cost Incrementally the most cost effective plan at a given level of output Lowest incremental cost per unit of output Form a subset of cost effective plans Most efficient in production at given levels of output Greatest increases in output for least increase in cost Incrementally the most cost effective plan at a given level of output

27 Incremental Cost Analysis 11 Best Buy Plans A = Sugar Hill G = Woodstock Pk B = Carolanne FarmsH = Lancelot Dr C = Somme Ave I = Grandy Village D = ScuffletownJ = ODU Drainage E = NW Jordan BrK = Prtsmth City Pk F = Crawford Bay E +I+B+F +J +D +G +H +K +A +C

28 Is the alternative worth it? Decision making guidelines:  Output target.  Output thresholds.  Cost limit.  Breakpoints.  Does it make sense? Remember there is no BC consideration !

29 A = Sugar Hill G = Woodstock Pk B = Carolanne FarmsH = Lancelot Dr C = Somme Ave I = Grandy Village D = ScuffletownJ = ODU Drainage E = NW Jordan BrK = Prtsmth City Pk F = Crawford Bay E +I+B+F +J +D +G +H +K +A +C Output Target Target

30 Total Cost Limit Cost Limit

31 A = Sugar Hill G = Woodstock Pk B = Carolanne FarmsH = Lancelot Dr C = Somme Ave I = Grandy Village D = ScuffletownJ = ODU Drainage E = NW Jordan BrK = Prtsmth City Pk F = Crawford Bay E +I+B+F +J +D +G +H +K +A +C Breakpoints Breakpoint

32 Additional Decision Considerations! Significance* Region of concern, priority urban area, exceptional resource area, etc., -*don’t forget institutional, technical and public significance consideration! Scarcity Historic habitat loss, few “available” sites, low diversity, threatened and endangered species, etc. Acceptability Watershed Action Team, Coastal America, etc. Effectiveness Addresses multiple problems, large geographic area, interconnected to natural system, creates habitat corridors, etc. Efficiency Passes tests of CE/ICA

33 Common Pitfalls Project goals should not be too limiting. Selection of the plan with the lowest cost or greatest output must be supported by environmental criteria. Plans which do not support the project goals should not be carried through the analyses. The formulation of plans should ensure that more than one plan meets the goal (or mitigation target).

34 Take Away Points   CE/ICA are required for all ecosystem restoration and mitigation projects   Environmental outputs must be significant and linked to resource quality   CE/ICA do not “pick” the selected plan, they simply aid in decision making   For additional Information see CE/ICA Tutorial on your disk.