Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.

Slides:



Advertisements
Similar presentations
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Advertisements

Mod 26_12 Notification Time for updating Interconnector Technical Data.
Allowing DSUs to act as Predictable Price Takers in the SEM 4th December, 2014.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
1 Mod_24_10 Introducing Loss of Profits as a Relevant Damage within the Limitation of Liability Provisions.
Global Aggregation Working Group 15 th September 2010.
Global Aggregation Working Group 15 th September 2010.
Position on Market integrity framework and transparency Florence Forum 6 December 2012 Robert Gersdorf.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015.
Review of Bulk Energy Storage in SEM Gaelectric Energy Storage T&SC Modification Working Group 6 th September 2012 Mullany Engineering Consultancy Energy,
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Evaluation of Proposals for New Rules for Energy Storage Gaelectric Energy Storage T&SC Modification Working Group 23 rd October 2012.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
SEM MODS COMMITTEE SLIDES Registration of Charges over Collateral Reserve Accounts – Proposed Code Modification.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
Modification Proposal Mod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012.
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING Modification Development 5 April 2011.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Renewables and System Services Ann Scully.
1 BCC Work Session Local Code of Ethics & Specific Project Expenditure Report Presented by Dana Crosby, Assistant County Attorney December 2, 2008.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Demand Side Units with a Maximum Export Capacity < 10MW 1 st February 2010 Michael Peters.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
T&SC Modification Proposal: Clarification of Outturn Availability
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
All Island Single Electricity Market IWFA Update Laura Brien
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Juliet Corbett, NIAUR. Regulatory Structure  Ireland  CER  Licenses Generators Suppliers ESBCS ESBPG ESB Networks Eirgrid Transmission License Eirgrid.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
CMP277 ‘Special License Condition 4J’ CMP278 ‘BSIS 2017 Housekeeping’
Regulatory ‘Do’s’ and ‘Don’ts’ for DSOs to serve consumers’ interests Garrett Blaney co-chair, CEER Distribution Systems Working Group CEER Annual Conference.
CRE Public Consultation on new exempt interconnectors
Capacity Conversion – 616s
Background and Process
MOD_04_17 Solar in the SEM 9th June 2017.
Holistic view of Charging Modifications – In flight 11th June 2018
Energy Storage Study PPRAC Meeting May 17, 2017.
Capacity Market Code Committee Meeting
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Elections 2013 Modifications Committee June / July 2013
MOD_19_18 Part B Housekeeping 1 21st June 2018.
Update to Unit Under Test Process
Redefinition of Schedule Production Cost
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Mod_37_18 Housekeeping 12th December 2018.
Capacity Market Code Committee Meeting
XIIIth Madrid Forum (16th/17th October 2007)
Richard Fairholme E.ON UK
Summary Issue Modification Aim Effect of the mod Impacts
Richard Fairholme Transmission Workstream 4th September 2008
Energy Storage Study PPRAC Meeting May 17, 2017.
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Retail Energy Code - Data Access Schedule
Presentation transcript:

Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011

Context TSOs have developed a Consultation paper on SEM Testing Tariffs Publication expected in June 2011 Scope of Under Test status in the TSC The relevant System Operator may grant Generator Units the status of Under Test for a limited period under the terms of the relevant Grid Code. The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped Storage Units, Demand Side Units, Interconnector Units or Interconnector Residual Capacity Units. Principle of Under Test should be applied to: Pumped Storage Interconnector DSU (TBC) AGU (TBC)

Mod 10_11 Interconnector Under Test Modification Proposal Testing Tariffs should apply to an Interconnector while undergoing testing for Commissioning, Grid Code Compliance or otherwise. It is recommended that the Interconnector Error Unit, which is registered to the Interconnector Administrator, as procured by the Interconnector Owner, is liable for the testing charges incurred while the Interconnector is under test. The Interconnector Error Unit is classified as an Autonomous Generator Unit in clause To ensure that Testing Tariffs apply to the Interconnector, the Interconnector Error Unit must be specifically separated from other Autonomous Generator Units in clause Text Change The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped Storage Units, Demand Side Units, Interconnector Units, or Interconnector Residual Capacity Units or Autonomous Generator Units except for Interconnector Error Units.

Mod 14_11 Pumped Storage Under Test Modification Proposal Pumped Storage units should be liable to Testing Charges. This modification proposes to further the TSC objective, in particular to ensure no undue discrimination between persons who are parties to the Code (Section 1.3.6). Text Changes The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped Storage Units, Demand Side Units, Interconnector Units or Interconnector Residual Capacity Units.

Thank You

Definitions Generator Unit means a Generator, and/or other item of Dispatchable plant, registered by a Participant, or which is the subject of an application for registration, under the Code. For the purposes of the Code a Generator Unit may be any one of the following types, without limitation: Aggregated Generator Unit, Autonomous Generator Unit, Demand Side Unit, Energy Limited Generator Unit, Hydro-electric Generator Unit, Interconnector Unit, Interconnector Error Unit, Interconnector Residual Capacity Unit, Netting Generator Unit, Pumped Storage Unit, Run-of- River Hydro Unit or Wind Power Unit or Dual Rated Generator Unit.