Events of March 7th John Adams ROS – May 12, 2005.

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

Lead from the front Texas Nodal 1 Texas Nodal Observability Status ROS Feedback Thursday, February 14, 2008.
Home Page and Main Menu Remy Order Management System.
Generate Incident Report Double Click the icon to open the Alarm Value database.
Quest Web-Browser Interface. Home Page This is the Home Page of the Quest Browser Interface. This page will show the site information, and any active.
OpalisRobot™ Demonstration Actual Run Book Procedure Actual Data center Run Book Procedure documenting for Level 1 staff how to both VERIFY.
ERCOT Nodal Protocols Telemetry Requirements Proposal
Remote Desktop Access Novell at Home. Remote desktop access Works on Broadband Computer at work must.
Poster Title 95 point, Arial font Primary heading Xx xxx x xx xxxxx xx xxxx xxx xx xx x x xxxxx xxxx xx xxxxx xx xxxxxx xxx xx. X xx xxxx xxxxx xx xxxx.
MATH 310, FALL 2003 (Combinatorial Problem Solving) Lecture 16, Monday, October 6.
MATH 310, FALL 2003 (Combinatorial Problem Solving) Lecture 34, Friday, November 21.
Presenter Name Presentation/event title xxxxx
Aggregation, Prefix-tree, TCP EE122 Discussion 10/10/2011.
TRABAJOS DE FOTOGRAFIA
MULTIPLES OF 2 By Preston, Lincoln and Blake. 2 X 1 =2 XX 2X1=2 1+1=2.
Public Key Encryption An example of how a bank might accomplish encryption.
70-291: MCSE Guide to Managing a Microsoft Windows Server 2003 Network Chapter 5: Managing and Monitoring DHCP.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
Copyright© 2003 Avaya Inc. All rights reserved Upgrade to Communication Manager 2.0 with Migration to Linux 8.0 Purpose: This presentation was prepared.
Students are able to generate a one-time login through their VTAC User Account.  The login details will need to be forwarded to the person nominated to.
Issue Date: 28th September, 2002 Doreen Chan Area H2 Governor XXXXX Chief Judge Toastmasters International District 51, Division H & V 2002 Area H2 Humorous.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
NSRS deployment April John Adams ROS – May 12, 2005.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Divide by 8 page – groups of 8 Division Sentence 0 ÷ 8 = 0.
Frequency Response Standard. ERCOT Governor Droop.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
70-291: MCSE Guide to Managing a Microsoft Windows Server 2003 Network, Enhanced Chapter 5: Managing and Monitoring DHCP.
Disaster Recovery. Presentation Purpose Understand Impact of Various Disaster Situations  What it means to operations  Impact duration Understand Alternate.
MP Failover DNS Option 1 for API Failover The same DNS structure that allows ERCOT to fail over services between sites can also be used to allow MPs to.
Information System Audit : © South-Asian Management Technologies Foundation Chapter 10 Case Study: Conducting an Information Systems Audit.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
PBMS Administration of the System ASCA. System Administration 3 Level of Users: PBMS Administrator Access to entire system Set up PBMS and Organization.
Typical M²M applications InduBox GPRS sample applications.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
6.1 - Polynomials. Monomial Monomial – 1 term Monomial – 1 term; a variable.
Managing of Limits during Loss of Analysis Tools/ EMS April 23, 2014.
NERC Lessons Learned Summary LLs Published in September 2015.
IP Addressing is Logical Addressing It works on Network Layer (Layer 3) Two Version of Addressing Scheme IP version 4 – 32 bit addressing IP version 6.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Review of Integration of the Requirements of MOD Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation.
Scheduling and Operating Transmission Devices in the Nodal Environment.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Telemetry and State Estimator Standards Network Data Support Working Group June 16, 2006.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
2016 Commercial Project Submittal Webinar
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Compliance Report to ERCOT TAC February 2007
To ensure that the UNITED WE FIGHT. UNITED WE WIN
Gamma Theta Upsilon Recent GTU Initiates
Parent Site Parents Click Here To Apply
Presenter Name Presentation/event title xxxxx
Instructions and Examples Version 1.5
Clinical Implications Differential Diagnosis
Title—48 pt. Arial Bold (use two lines of text if necessary)
Title—48 pt. Arial Bold (use two lines of text if necessary)
Warm up (12x2 + 8x – 6) – (9x2 – 2x + 5) Find the area and perimeter
Presentation transcript:

Events of March 7th John Adams ROS – May 12, 2005

March 2 nd - Backup Maintenance On March 2 nd routine patch application at the backup site of a large QSE was performed. The boxes involved were programmed to come up in an “active” state. Normal procedure would have had them de-activated when the site was not active. This did not take place.

March ? – Primary glitch Primary at QSE had an ICCP glitch making the primary IP address unavailable to ERCOT. ERCOT showed an active backup site and began reading data from the backup site. This ICCP data was not valid. Data included LAAR relay status, Gen. MVAR, High & Low limits, and Generator Breaker status.

March 6 – RTU glitch Primary RTU at large QSE had a problem. ISD data froze, Freezing all generator MW and SCE to ERCOT. Detected at 14:18 LOG ENTRY: XXXXX: Still showing XXX mw's on XXXXXXXX at ERCOT. XXXX showing XXXXXXX at 0 and sending a 0 signal to ERCOT. Techs on ERCOT and XXX checking on the problem. All XXXX values for the XXXX units at XXXXXX are frozen on ERCOT's end. It appears that XXXX generation signal went flat beginning at 12:28, and did not normalize until 14:29. Additionally, their telemetered SCE signal was also flat across the same period

March 7 th – Problem detected Called XXXXXXXX and discussed the suspect data on all of the Generator breaker status along with the MVAR status for all units... XXXX indicated he thought it was on our end.. In the analog status page of the substation, the Info key was selected, and the flags indicated the remote end was suspect. XXXXXX make repairs to the communication for the status point of CB's and MVAR's at all of XXXX generating facilities...