Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.

Slides:



Advertisements
Similar presentations
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Advertisements

Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Superconducting Large Bore Sextupole for ILC
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
CERN Accelerator School Superconductivity for Accelerators Case study introduction Paolo Ferracin CERN, Geneva Claire Antoine
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
LARP Collaboration Meeting Racetrack Coil Fabrication
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
WORK IN PROGRESS F C C Main Quadrupoles FCC week 2017
MQXF Design and Conductor Requirements
TQS Overview and recent progress
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
ESAC Review February 2013 CEA Saclay
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
J.C. Perez on behalf of SMC collaboration team J.C. Perez
Plans for the PSI Canted-Dipole Program
Mechanical Modelling of the PSI CD1 Dipole
FRESCA2 Update on the dipole design and new calculations
Glyn Kirby Magnet AssemblyTechniques.
the MDP High Field Dipole Demonstrator
SMC Design overview of the construction and project issues
MQXF updates P. Ferracin October 9th, 2014.
11T Dipole for the LHC Collimation upgrade
MQXF coil cross-section status
CERN Accelerator School Superconductivity for Accelerators Case study 2 Paolo Ferracin European Organization for Nuclear Research.
P.Fabbricatore & S.Farinon
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Cross-section of the 150 mm aperture case
Presentation transcript:

Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz Garcia, J. C. Perez, L. Oberli, J. M. Rifflet, G. de Rijk, F. Rondeaux, E. Todesco, and the whole team of the Magnet Design and Technology (MDT) Section EUCARD-WP7-HFM 9 th collaboration meeting LASA, Milan 18 September, 2012

Introduction European Coordination for Accelerator R&D (EUCARD) Project – R&D on new technologies for future upgrades of the European accelerators Work Package 7 dedicated to superconducting high field magnets for higher luminosities and energies Key objective: fabrication and test of FRESCA2 – Upgrading the CERN cable test facility FRESCA 88 mm  100 mm aperture 10  13 T bore field NbTi  Nb 3 Sn superconducting technology – Provide the background field for an HTS coil insert R&D towards 20 T magnet 18/09/2012 Paolo Ferracin2

Introduction Overview of magnet design Target: 13 T in 100 mm clear bore OD: m; length: m Al shell, 65 mm thick, 1.6 m long Iron yoke – Holes for axial rods Horizontal stainless steel pad – 3 bladders, 75 mm wide – 2 load keys Vertical iron pad – 2 bladders, 60 mm wide – 2 load keys Auxiliary bladders between yokes Four double-layer coils Iron and Ti alloy central posts 18/09/2012 Paolo Ferracin3

Conductor and cable parameters Both PIT an RRP procured Strand diameter: 1 mm Cu/Sc: 1.3  56% Cu Strand #: 40 Bare width after cabling: mm Bare thickness after cabling: mm Insulation: mm Assumed growth during HT – 4% in thickness and 2% in width Bare width after HT: mm Bare thickness after HT: mm 18/09/2012 Paolo Ferracin4 PIT strand

Superconductor properties J c of virgin strand (4.2 K) without self field (s.f.) correction (PIT) – 2400 A/mm 2 at 12 T – 1400 A/mm 2 at 15 T Self field corr. of 0.41 T/kA ~5% cabling degradation Resulting J c for comp. – 2450 A/mm 2 at 12 T – 1400 A/mm 2 at 15 T 18/09/2012 Paolo Ferracin5

Dilatation test Goal: measure cable longitudinal length variation during reaction – Feed-back on coil and tooling design 1.5 m of cable wound around 700 mm long winding pole – Stainless steel, iron, Ti alloy – Gaps vs. no-gaps First (out of 3) heat treatment completed, analysis in progress 18/09/2012 Paolo Ferracin6

Coil design Two double-layers with 36 and 42 turn Coil aperture 116 mm, bore 100 mm Iron and Ti (or SS) poles Inter-coil gap and mid-plane “tailored” shim 730 mm of straight section Hard-way bend of 700 mm 17  inclined ends Overall coil length of 1.6 m 18/09/2012 Paolo Ferracin7

Magnet parameters Operational conditions (13 T) – I op : 10.9 kA – B peak_op : 13.4 T – 79% of I ss at 4.2 K B bore : 16.0 T – 72% of I ss at 1.9 K B bore : 17.2 T; 15 T bore field: 86% of 1.9 K I ss Peak field in layer 1 1% homogeneity in 2/3 of aperture and 540 mm length 10% of margin in the ends 18/09/2012 Paolo Ferracin8

E.m. forces and support structure E.m. forces in straight section directed outwardly – Max. “accumulated” stress of 100 MPa Horizontal bladders pressurized to 30 MPa – Insertion of a shim in hor. load keys of 0.6 mm Shell  from 65 (293 K) to 185 (4.2 K) MPa Axial force: 2.8 MN – LHC (8.3 T, 1 aperture): 0.25 MN – HQ (170 T/m): 0.8 MN Axial piston used to pre-load the rods – 60 mm diameter Rod  from 150 (293 K) to 260 (4.2 K) MPa 18/09/2012 Paolo Ferracin9

Coil stress 2D and 3D mechanical model Goal: contact pressure (or tension <20 MPa) between pole turn and pole pieces – From straight section to hard- way and easy-way bent Coil peak (equiv.) stress – MPa – Maximum stress moves to low field region at full field 18/09/2012 Paolo Ferracin MPa 134 MPa 154 MPa -139 MPa

Coil fabrication status Winding on 3 bolted blocks Stainless steel fixture (top plates and side rails) for reaction – Mica sheets for sliding Same parts in aluminium for impregnation Design completed, procurement in progress One set of coil part successfully fabricated – Plasma spray for insulation 18/09/2012 Paolo Ferracin11

Support structure fabrication Yoke and shell 18/09/2012 Paolo Ferracin12 10 strain gauge stations Azimuthal, axial with T comp. Straight section and ends Total: 20 gauges

Support structure fabrication Yoke and shell 18/09/2012 Paolo Ferracin13

Support structure fabrication Coil-pack with dummy coils 18/09/2012 Paolo Ferracin14 14 strain gauge stations Azimuthal, axial with T comp. Straight section and ends Total: 28 gauges

Support structure fabrication Coil-pack with dummy coils 18/09/2012 Paolo Ferracin15

Support structure fabrication Axial support system 18/09/2012 Paolo Ferracin16 2 strain gauge per rod Axial direction. Total: 8 gauges

Quench protection At nominal field, total stored energy of 4.6 MJ – 3.7 m long LARP LQ features: 1.4 MJ – But, comparable the stored energy density Protection system: 95 mΩ dump resistor and quench heaters on all layers – 50 W/cm 2 and 50% coverage 150 or 200 K of peak T with t detection of 40 or 100 ms 18/09/2012 Paolo Ferracin17 Traces with 4 heaters – Wiggling shape for better coverage 9 voltage taps per layer – Monitor pole turn and external turns

Conclusions and future plans Design of Nb 3 Sn dipole magnet FRESCA2 completed – Goal: 13 T in 100 mm bore According measured strand properties, the magnet operates with more than 20% of current margin Fabrication of coil fabrication tooling in progress Structure components and parts for the first coil delivered Next steps – First coil wound with a copper cable early next year – In parallel, support structure assembled, pre-loaded and cooled- down to 77 K around aluminium dummy coils. Results to be used to validate models and define procedures and pre- load levels 18/09/2012 Paolo Ferracin18