ILC Start-End Simulations Glen White, SLAC May 13, 2014 AWLC14, Fermilab.

Slides:



Advertisements
Similar presentations
10/23/07RTML EDR Oct GDE1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Advertisements

4.1/9.1m L* Optics & Performance Glen White, SLAC SiD Meeting, SLAC Jan 13, 2015.
BDS Change Request: Support of Single L* Optics Configuration Shared by both Detectors Glen White, Nick Walker Sept MDI/CFS Ichinoseki.
1 MULTI-BUNCH INTEGRATED ILC SIMULATIONS Glen White, SLAC/QMUL Snowmass 2005.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
Web-Based ILC Multi-Bunch Simulation Database Glen White (SLAC / QMUL) ILC MDI Workshop SLAC, Jan 8th 2005.
SLAC ILC Accelerator: Luminosity Production Peter Tenenbaum HEP Program Review June 15, 2005.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
DESY GDE Meeting Global Design Effort 1 / 14 LET Work at SLAC and Plans for the Future PT SLAC.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ML / RTML WG Summary N.Solyak, K.Kubo, A.Latina AWLC 2014 – Fermilab – May 16, 2014.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
BPM Orbit Data Analysis with Wakefields Glen White, SLAC January 2013.
@ Fermilab May 15-17, 2006, FNAL KIRTI RANJAN – DOE Review1 ILC Simulation for RDR Kirti Ranjan Fermilab.
European Organization for Nuclear Research International Linear Collider INTERNATIONAL WORKSHOP ON FUTURE LINEAR COLLIDERS ЛЦВС14 Vinča Institute of Nuclear.
ILC Feedback System Studies Nikolay Solyak Fermilab 1IWLC2010, Geneva, Oct.18-22, 2010 N.Solyak.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
Dynamic Tuning Selected Highlights Freddy Poirier (DESY) ILC accelerator physics group meeting 28 th January 2008.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
NLC - The Next Linear Collider Project P. Tenenbaum DR  IP  DR Simulations Collaboration + MAC Meeting May 2002 “Now Bliss is Everywhere…”
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
BDS Alignment, Tuning, Feedback update and Integrated Simulation Plans Glen White.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Isabell-A. Melzer-Pellmann LET Beam Dynamics Workshop, Lumi scans with wakefields in Merlin Lumi scans with wakefields in Merlin Isabell-A.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
April Recent work on Low Emittance Transport, Main Linac Paul Lebrun CD/FNAL.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Freddy Poirier ILC project Meeting Integrated Luminosity Performance Study on the ILC – WP6 (A snapshot of the European LC workshop at Daresbury) Freddy.
BDS, Start to End Simulation, Simulation Codes Summary D. Schulte.
07 June 2006Peter Tenenbaum1 Ring to Main Linac and Low Emittance Transport SLAC DOE Review Accelerator Breakout.
BDS Status Update Glen White, SLAC July ADI Fuze Meeting.
Luminosity Issues for LC BDS Glen White, SLAC LCWS2013, Tokyo November 12, 2013.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
1 Updated comparison of feedback implementation for e + e - and e - e - modes of operation with realistic errors in the BDS M. Alabau Pons, P. Bambade,
ILC Main Linac Beam Dynamics Review K. Kubo.
From Beam Dynamics K. Kubo
ILC BDS Alignment, Tuning and Feedback Studies
In collaboration with P. N. Burrows, A. Latina and D. Schulte
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ILC Z-pole Calibration Runs Main Linac performance
New algorithms for tuning the CLIC beam delivery system
Auxiliary Positron Source
MULTI-BUNCH INTEGRATED ILC SIMULATIONS
Accelerator Physics Technical System Group Review
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
MULTI-BUNCH SIMULATIONS OF THE ILC FOR LUMINOSITY PERFORMANCE STUDIES
Start-to-End Simulations for the TESLA LC
Presentation transcript:

ILC Start-End Simulations Glen White, SLAC May 13, 2014 AWLC14, Fermilab

ILC Start-End Simulations Form list of all expected “error” sources and generate N (typically ~100) random machine “seeds” – e.g. magnetic errors, misalignments – e.g. dynamic errors: ground motion + feedbacks – e.g. realistic diagnostics performance (BPM scale errors, resolutions…) Apply all commissioning, tuning and operational measures in as realistic manner as possible using expected input devices with expected performances. Examine ensemble of results, get a probabilistic picture of what the running state of the entire machine is. – Especially luminosity.

Why? Accurate picture of expected luminosity performance of the machine. – Tuning is a part of the lattice description. Solid basis for forming tolerance specifications. Accurately evaluate impact of design changes and choices. Stored results and infrastructure can form the input of other studies Limitations: – Doesn’t cover cases where machine is “broken”, still need to consider capability to diagnose faults.

What to include? DR? – Historically not included, usually treat as “source” – Maybe some benefit in looking at realistic extracted conditions? RTML – Bunch-bunch feedback in turn-around? Linac – Bunch compression, wakefields, pulse-pulse feedback BDS/IR – Including beam-beam simulation for luminosity + beamstrahlung Extraction line?

Simulation Tools Many simulation tools exist and have been used in the past – placet, merlin, lucretia, bmad, ptc/madx… – Either stand-alone or joined with scripts Having multiple codes useful (and annoying) – Have to track down difference in results, can lead to deeper understanding, helps avoid obvious mistakes… To profit from multiple analysis efforts, useful to define some standards – Error parameter lists – Algorithms, including application specifics (e.g. method of adjusting E in DFS).

Work performed in the past RTML, Linac, BDS studied separately – Independently defined luminosity growth “budgets” – Most effort on Linac emittance preservation techniques Linac+BDS global simulation for RDR performance studies

ILC (RDR-era) S2E Simulations Lucretia Linac – Independently “static” tune 100 seeds – Pick those that fulfill “emttance growth budget” expectations. – Apply dynamic errors, tracking through to get wakefields and realistic beam response functions – Include GM & 5Hz feedbacks BDS – Full tuning (BBA, orbit steering etc & FFS tuning with sextupoles). – Use GUINEA-PIG for beam-beam simulations, track pairs through solenoid to detector. – BDS 5Hz feedbacks Intra-pulse effects considered separately.

ILC S2E Simulation Results ILC RDR parameters Start-end tuning procedure 90% seeds tune with 8% overhead – Includes pulse-pulse dynamics + FB’s – Excludes “fast IP Expect ~90% seeds to provide nominal luminosity – Including IP high-bandwidth feedback for worst possible conditions Need to update for TDR parameter sets 2-sided simulations – ILC RDR 2-sided sim: 90% 85% lumi Needed to expand sim time Tunable with worst-case GM, pessimistic linac behaviour & simplistic correction techniques Tuning time <1,000 pulses

TDR Work Parameter sets have changed, need to refresh work. Fully document. Maintain as an ILC resource Need to evaluate scope and importance taking into account available resources in immediate future. – Can image 0.5 – 2+ FTE / year in this effort.

TDR Work Minimum: (< 6 months) – BDS-only “static” simulation with full error source list All baseline parameter sets, both IR’s 3 months – Calculate detailed jitter tolerance of final doublet magnet sets including action of intra-pulse FB +1 month – Detailed list of well-motivated tolerances/ requirements for magnets and diagnostics +1 month Better: months – Include GM + dynamics – Include Linac – Intra-pulse dynamics considerations Include parameterised effects in S2E simulations Best: + (?) months – Include RTML – Include DR – Multiple codes