1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry.

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

Laser Speckle Extensometer ME 53
Thomas Stalcup June 15, 2006 Laser Guidestar System Status.
Wavefront Correction SystemWavefront Correction System Hardware and Software.
CHARA AO WFS Design JDM (+LS,MJI) 2012Sep06 v0.1 1.
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
GMT Phasing GLAO – not needed LTAO – Phase stabilization done at ~1kHz with edge sensing at M1 and M2 – Phase reference set at ~.01Hz using off-axis star.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
PALM-3000 HOWFS Design Update 2/27/08 C. Baranec Pasadena, CA February 27 th 2008.
Keck Next Generation Adaptive Optics Team Meeting 6 1 Optical Relay and Field Rotation (WBS , ) Brian Bauman April 26, 2007.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO NGS WFS design review Caltech Optical Observatories 31 st March 2010.
Adaptive Optics Model Anita Enmark Lund Observatory.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
P3K WFS development meeting #2 V Velur Caltech Optical Observatories Pasadena, CA
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
LGS wavefront sensor : Type and number of sub-apertures NGAO Team Meeting #4 V. Velur Caltech Optical Observatories 01/22/2007.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
NGAO Laser Guide Star wavefront sensor Optical Design 17/16/2015Caltech Optical Observatories PD Phase LGS WFS Mini-Review.
SciMeasure Wavefront Sensor Cameras and their Application in the 5m Palomar Adaptive Optics System SciMeasure Analytical Systems, Inc. Ray DuVarney, Charlie.
Keck AO the inside story D. Le Mignant for the Keck AO team.
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
SciMeasure Wavefront Sensor Cameras and their Application in the 5m Palomar Adaptive Optics System SciMeasure Analytical Systems, Inc. Ray DuVarney, Charlie.
[1] Reference: QCam API reference manual document version Charge Coupled Device (CCD)
1 On-sky validation of LIFT on GeMS C. Plantet 1, S. Meimon 1, J.-M. Conan 1, B. Neichel 2, T. Fusco 1 1: ONERA, the French Aerospace Lab, Chatillon, France.
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Quick tutorial Quick tutorial on using labAO and telWFS Work in progress.. JDM 2015June11.
HESSI Imaging Capability Pre Environmental Review Brian R. Dennis GSFC Tuesday, February 29, 2000.
Laboratory prototype for the demonstration of sodium laser guide star wavefront sensing on the E-ELT Sexten Primary School July 2015 THE OUTCOME.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
19 February 2009 Cophasing sensor for synthetic aperture optics applications First steps of the development of a cophasing sensor for synthetic aperture.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
Position sensing in Adaptive Optics Christopher Saunter Durham University Centre for Advanced Instrumentation Durham Smart Imaging.
1 Manal Chebbo, Alastair Basden, Richard Myers, Nazim Bharmal, Tim Morris, Thierry Fusco, Jean-Francois Sauvage Fast E2E simulation tools and calibration.
The AO system for the GTC -an update Nicholas Devaney, Dolores Bello, Bruno Femenía, Alejandro Villegas, Javier Castro Grantecan, Instituto de Astrofísica.
High Throughput Microscopy
MARS Design Review PP-1 Requirements Definition Performance: –Tip/Tilt error < 0.06″ rms mirror coordinates 0.12″ rms image coodinates 0.28″ fwhm image.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
IRIS OIWFS Concept Study D. Loop1, M. Fletcher1, V. Reshetov1, R
ATLAS The LTAO module for the E-ELT Thierry Fusco ONERA / DOTA On behalf of the ATLAS consortium Advanced Tomography with Laser for AO systems.
The Active Optics System S. Thomas and the AO team.
FLAO_01: FLAO system baseline & goal performance F. Quirós-Pacheco, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
EEV CCD39 wavefront sensor cameras for AO and interferometry SciMeasure Analytical Systems, Inc. Ray DuVarney, Charlie Bleau, Garry Motter Emory University,
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
Page 1 Adaptive Optics in the VLT and ELT era Wavefront sensors, correctors François Wildi Observatoire de Genève.
Active Optics and Wavefront Sensing at the Upgraded 6.5-meter MMT Xiaoyin Zhu Dec 12, 2012 OPTI 521 Paper Synopsis By T.E. Pickering, etc.
AM-H676ER H.264 IP Speed Dome Camera Product Key Features: H.264 Main Level 3 Compression 960H 928*576 30fps PAL/NTSC 30fps ¼” SONY Super HAD.
AM-H676 H.264 IP Speed Dome Camera H.264 IP Speed Dome Camera Product Key Features: H.264 Main Level 3 Compression 960H 928*576 30fps ¼” SONY.
April / 2010 UFOCapture 1 UFOCaptureV2 Time-Shift-Motion-Detect-Video-Recording software for complete records of un-expected events.
Data Acquisition, Diagnostics & Controls (DAQ)
Lecture 14 AO System Optimization
Design and Manufacture of a Large Aperture Wavefront Sensor (LAWS)
SciMeasure Analytical Systems, Inc.
CCD wavefront sensing system for the ESO Multi-conjugate Adaptive Optics Demonstrator (MAD) C.Cavadore, C.Cumani, The ESO-ODT team, F.Franza, E.Marchetti,
Trade Study Report: Fixed vs. Variable LGS Asterism
Presentation transcript:

1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry and Large Optics, Jet Propulsion Laboratory

2 Introduction: Palomar Tomograph (PT) is a compact multiple guide star wavefront sensor system that can be used to confirm tomographic wavefront sensing algorithms Palomar Tomograph (PT) is a compact multiple guide star wavefront sensor system that can be used to confirm tomographic wavefront sensing algorithms 4 Hartmann Shack low noise CCD based wavefront sensors (three 16x16 sub-apertures, one 3x3 sub-aperture) excluding the PALAO active high order wavefront sensor. 4 Hartmann Shack low noise CCD based wavefront sensors (three 16x16 sub-apertures, one 3x3 sub-aperture) excluding the PALAO active high order wavefront sensor. PALAO also has a dedicated 16x16 SHWFS that feeds data to a real time computer PALAO also has a dedicated 16x16 SHWFS that feeds data to a real time computer

3 Principle of operation of the MGSU

4 The “bird-of-prey” (BoP) Penta prism collimator Lenslet array Field lens Focusing lens

5 Scimeasure’s Little Joe Camera with CCD39 chip XY stage and sleeve A single Hartmann Shack WFS channel

6 The MGSU/ tomograph assembly:

7

8 Spots on the focal plane array: (4x4 pixels/sub-ap., 16x16 spots aligned FPA with >0.1 pixel RMS offset)

9 Salient features of the PT The system can be used with the PALAO tip-tilt and high order AO loop closed or with both or either being open using low noise CCD based SHWFS. We can record data Hz. The system can be used with the PALAO tip-tilt and high order AO loop closed or with both or either being open using low noise CCD based SHWFS. We can record data Hz. 3.2 Terabytes of total data storage space with two SCSI Ultra 160/RAID on two striped RAID disks that can record data at 2000 Hz from 4 cameras acquiring 14 bit data from 64x64 pixels. Data is compressed using custom lossless compression format and can be extracted to fits image with time tags. 3.2 Terabytes of total data storage space with two SCSI Ultra 160/RAID on two striped RAID disks that can record data at 2000 Hz from 4 cameras acquiring 14 bit data from 64x64 pixels. Data is compressed using custom lossless compression format and can be extracted to fits image with time tags. BoPs can acquire guide stars over a continuous 90 arc-sec. diameter field. The optical train is designed to be telecentric over this range so that pupil shear is >1.2% (2 microns) at the lenslet pupil (size=1.728 mm) over the FoV. BoPs can acquire guide stars over a continuous 90 arc-sec. diameter field. The optical train is designed to be telecentric over this range so that pupil shear is >1.2% (2 microns) at the lenslet pupil (size=1.728 mm) over the FoV. Linux based camera control interface and motion control. All control schemes are written in C/C++. All control code is checked into CVS repository with version control. Documentation and user manuals that are available via. www. ssh-agent, ssh-add help us to talk to all cameras from one shell. Linux based camera control interface and motion control. All control schemes are written in C/C++. All control code is checked into CVS repository with version control. Documentation and user manuals that are available via. www. ssh-agent, ssh-add help us to talk to all cameras from one shell. A 5 ft high commercial 19” rack is populated with a KVM, a 1U rack mounted monitor, 10 Mbps network link, a network power switch etc for ease of operation. Newport’s latest LTA series high speed actuators used to pick off guide stars with one motor controller controlling all 8 axes. A 5 ft high commercial 19” rack is populated with a KVM, a 1U rack mounted monitor, 10 Mbps network link, a network power switch etc for ease of operation. Newport’s latest LTA series high speed actuators used to pick off guide stars with one motor controller controlling all 8 axes. A custom timing module can be used to trigger as many as 6 cameras to run at integral frame rates in a synchronous fashion. This can be used when guide stars are of different brightness or to study variations in time of the wavefront sensed from each pick off arm. A custom timing module can be used to trigger as many as 6 cameras to run at integral frame rates in a synchronous fashion. This can be used when guide stars are of different brightness or to study variations in time of the wavefront sensed from each pick off arm.

10 Performance We have successfully locked on a Tempel 1 (18 magnitude comet (extended object)) at 2.0 air-masses with the 3x3 SHWFS built in the same fashion. We have successfully locked on a Tempel 1 (18 magnitude comet (extended object)) at 2.0 air-masses with the 3x3 SHWFS built in the same fashion. PALAO HOWFS performance PALAO HOWFS performance Bright guide star Strehls as high as 80% at 2.2 mm Maximum frame rate 2000Hz (<7e- read noise) Limiting magnitude ~13.5mV, 10-15% Strehl at 2.2 mm Read noise 3.5e- at < 500 fps Mean Wavefront 165 nm Typical read noise for e2V’s CCD 39 chips is 3e - s at 500 Hz and 7e - s at 2000 Hz Typical read noise for e2V’s CCD 39 chips is 3e - s at 500 Hz and 7e - s at 2000 Hz In parallel - Matthew’s work on modeling anisoplatism In parallel - Matthew’s work on modeling anisoplatism

11 Measurement error vs. sub-ap diameter, for r o (0.5 micron) =0.15 m, 3e - s of read noise and system transmission=0.36 Combined measurement error and fitting error vs. sub-ap. Diameter, for ro(0.5 micron) =0.15 m, 3e-s of read noise and system transmission=0.36. ( Each curve is truncated by fitting error term, indicating that there is no star brightness that results in that level of wavefront measurement error.) After R. Dekany et al., 2001 Beyond conventional adaptive optics, Venice, Italy

12 Laboratory set-up: Point source collimatoriris Focusing lens F#15.4 focus CCD camera w/ BoP Alignment telescope Axis defining iris holder

13 Custom BoP alignment jig: Gimbal mount 5 axis stage Lockable XY and focus stage

14 Camera simulator with reticle: Grid to simulate CCD pixels

15 Camera controllers and data recording: 8 axis motor controller CCD camera controllers Network power switchKVM video switch 1U rack-mountable monitor 3 x dell 1U PCs with SCSI HDD and Ultra SCSI 160 port 3.2 Terabyte RAID array

16 Current status: 3 BoPs aligned individually 3 BoPs aligned individually The data acquisition system is ready with synchronous recording capability The data acquisition system is ready with synchronous recording capability To do: Mount the 4 BoPs in the MGSU cage Mount the 4 BoPs in the MGSU cage Mount penta prisms and align Mount penta prisms and align Solve frame rate issues with cameras. Solve frame rate issues with cameras. 7 work days of installation schedule (JPL – Chris Shelton and Jennifer Roberts) 7 work days of installation schedule (JPL – Chris Shelton and Jennifer Roberts)

17 Web-site/ documentation: