Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

Grantham Dock Setback Waiver BD Orange County Board of County Commissioners May 13, 2014.
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
1 WELCOME MAP “TUNE-UP” WORKSHOP September 19-20, 2007.
Planning Permission Process and Procedures
THE ABCs OF CRAs THE PLAN CHAPTER 163 REQUIREMENTS.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
SHORELINE AND WATERWAY MANAGEMENT SECTION DNREC
Who, Why, and How was this Allowed to Happen? - By Linda Beaumont 1.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
City of Satellite Beach. Satellite Beach Total area of 4.3 square miles Just over 10,000 residents 98% built out.
2008 Legislative Summary Utah APA Luncheon West Valley City March 10, 2008.
MUNICIPAL LAND USE APPROVAL PROCESS “How To Navigate The System” City of East Orange, NJ Mayor Robert L. Bowser Joseph Jenkins, City Administrator James.
The KwaZulu-Natal Planning and Development Act APPLICATION PROCESS Schedule 1.
By Andrew Baumann, Esq. Lewis, Longman & Walker, P.A.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Ordinance No. 489 BMC Chapter SURFACE WATER MANAGEMENT.
Appeal of the Environmental Protection Commission’s Decision to Deny an After- the-Fact Waiver Request to Section (b) (side setback) for a Boat.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
FOR CLERKS AND RECORDERS  Planning Commission – public meeting and a public hearing  City Council – public hearing  Must contain: - a map of expansion.
Shore Protection Act (O.C.G.A , et seq.) Karl BurgessApril 5, 2011 Photo of Choice.
Community Development Department FUTURE LAND USE MAP AMENDMENT GRAND HAVEN NORTH CONSERVATION AREA APPLICATION # 2604.
November 11, 2008 BCC PUBLIC HEARING ON BZA #SE , September 4, 2008 APPLICANT/APPELLANT: Christian Haitian Church, Inc.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
1. Land Conservation Act (LCA) * Public Agency Webinar Public Acquisition Notification Procedure – A Step by Step Guide * LCA, also known as the Williamson.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Appeal to the Decision of the Environmental Protection Commission Mark Kassar November 11, 2008 Environmental Protection Division Environmental Protection.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
February 12, 2013 Alachua County Board of County Commissioners.
Changes to Contested Case Hearing Requirements and Procedures Janis Hudson Environmental Law Division Texas Commission on Environmental Quality Advanced.
The Public Waterfront Act. Covering the basic questions Why? Purpose of Act and Regulations Where? Geographic Jurisdiction What? Activities Subject to.
Procedures for Annexation by Ordinance Presentation Outline Chattanooga Annexation History Urban Growth Boundaries and Master Interlocal Agreement Procedures.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Public Workshop May 14, 2013 Alachua County Board of County Commissioners.
Community Development Department FUTURE LAND USE MAP AMENDMENT GRAND HAVEN NORTH CONSERVATION AREA APPLICATION # 2604.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Local Assistance Section GUIDANCE FOR PREPARING THE AREA SOLID WASTE MANAGEMENT PLAN 5-Year Update Solid Waste Coordinator Training FEBRUARY.
Joy Patterson, Principal Planner City of Sacramento March 16 th, 2016 For the 2016 Planning Academy.
BOR Real Property Conveyances and Restrictions Anita Bain, Director Natural Resource Management Division August 18, 2006 Anita Bain, Director Natural.
W.S through  To provide for:  Prevention and control of erosion  Prevention of flood water and sediment damages  Agricultural.
Pinecastle Jeep Range Resolution Board of County Commissioners Discussion Item November 29, 2011.
Washoe County Board of Adjustment
WPVAR (Greenview HOA) Washoe County Board of Adjustment August 3, 2017.
Hazel Avenue Surplus Sales
HB 328 SITING OF SOLID WASTE MANAGEMNT FACILITIES
Update on Special Event Facilities Butte County Code Section
Washoe County Board of Adjustment
Continuing Authorities Program
Canyons Golf Hole 12 Comfort Station Special Exception
Washoe County Board of Adjustment
US Army Corps of Engineers
Michigan Dept. of Environmental Quality Water Resources Division
Regulation Amendment AM April 3, 2018.
Planning Commission Meeting: August 3, 2016
Kentucky County Treasurer’s Fundamentals Course
Successfully Integrating NEPA and Environmental Permitting into a DoD Hazardous Waste Treatment Facility Construction Project to Meet Budget and Schedule.
Variance WVAR Snyder Residence 540 Gonowabie Road Crystal Bay
Environmental Protection Division
Aldine Westfield Stormwater Harris County Flood Control District
Tax-Forfeited Land Classification Property Taxation & Records
Presentation transcript:

Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends from the mean high waterline of the Atlantic Ocean landward 1,000 feet and seaward 2,500 feet, respectively. Section 4.04 Construction of Pipelines or Harbor Works Seaward of the Building Line.5 Construction of a Structure Seaward of the Building Line; Beach – is that area which extends from the mean high waterline of the Atlantic Ocean landward 1,000 feet and seaward 2,500 feet, respectively.

Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 The Beach Preservation Act Title 7, Chapter 68.

Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 A Permit is required from the Division prior to the construction of any structure or facility on any beach seaward of the Building Line.

Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends from the mean high waterline of the Atlantic Ocean landward 1,000 feet and seaward 2,500 feet, respectively.

Shoreline & Waterway Management Section

Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Section 4.04 Construction of Pipelines or Harbor Works Seaward of the Building Line. Section 4.03 Construction of Beach Erosion Pipelines or Harbor Works Seaward of the Building Line.

Shoreline & Waterway Management Section Procedures for Processing Permit Applications The permit application shall be advertised in a daily newspaper of statewide circulation and in a newspaper of general circulation in the county in which the activity is proposed. The Division mails notice of the Permit Application to all adjacent property owners. Application is available for public inspection. Comments are accepted for 15 calendar days. A decision can not be made until at least 20 days after the notice has been published and mailed to adjacent property owners

Shoreline & Waterway Management Section Hearing Request Schedule a Hearing Advertise the Hearing Hold the Hearing Wait for the Hearing Officers Report Make a decision on the application

Shoreline & Waterway Management Section Specific Information Examined by the Division Comments received by the Division. The effect of the proposed construction on shoreline recession, beach erosion, flooding, and potential damage to the parcel of real property that is the subject of the permit application, and potential damage to any other parcel of real property, public lands, or personal property. The design modifications which may mitigate the impact of the proposed construction. Any other factors or information that the Division determines to be relevant to the subject matter of the permit and carrying out the purposes and intent of the Regulations and the Act.

Shoreline & Waterway Management Section Other Approval from the U.S. Army Corps of Engineers May be in the project area