Navajo Nation Operating Permit Program

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
IRON & STEEL FOUNDRY MACT QUESTION & ANSWERS
Healthcare and Air Quality H2E Conference - Dec 6, 2007 K-State Pollution Prevention Institute Ryan Hamel.
Harmonization of Parts 60 and 75
© Jeffer, Mangels, Butler & Marmaro LLP CAA Title V Regulatory Requirements Malcolm C. Weiss, Esq. (310) Jeffer, Mangels, Butler.
Laura McKelvey, U.S. EPA. 2  CAA Implementation Authority [Section 301(d)] ◦ 1990 CAA Amendments ◦ Tribal air management authority ◦ TAS / TIP.
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
New Federal Regulations for Internal Combustion Engines Doug Parce.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Air Permitting Overview.
Compliance Update NCMA 2015.
New Source Review (NSR) Program Basics and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Laura McKelvey, Jessica Montañez,
The Navajo Nation CAA Permit Program National Tribal Forum on Air Quality May 19-21, 2015 Battle Creek MI.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Frank Steitz Air Quality Permitting Program 10/12/2012
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
1 Navajo Nation Operating Permit Program Anoop Sukumaran, Navajo Nation EPA Tribal Program Development.
Where to find Information About Facilities. Overview of Title V Permits.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
Tribal Authority Rule (TAR) Overview
Air Quality 101 Kansas Air Quality Program overview.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
SIP Development and Implementation in New Mexico - and Why it Matters to Tribes Rita Bates Planning Section Chief Air Quality Bureau New Mexico Environment.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
1 GRIC Tribal Implementation Plan Development Dan Blair, Air Program Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Title V: The Big Picture
Navajo Air Quality Control Program Navajo Nation Environmental Protection Agency National Tribal Forum June 3, 2009.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
June 13, 2013 Joy Wiecks Fond du Lac Reservation 1.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
Minor NSR Program and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Jessica Montañez U.S. Environmental Protection Agency Office.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
Clean Air Act SAFE 210. Purpose Protect public health and regulate air emissions Addresses both stationary and mobile sources.
NSR and Title V Activities WESTAR Business Meeting May 2005.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
GRIC Case Study Permit Review Dan Blair, Compliance and Enforcement Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.
TAS and TIP Swinomish Tribe and the Incremental Approach.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
Blue Skies Delaware; Clean Air for Life Synthetic Minor Permitting Process Steve Mann.
Air Quality Division Emissions Inventories SAW: May 3, 2016 Page 1 Point Source Emissions Inventories Air Quality Division Susan Wampler May 3,
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
Developing a Tribal Implementation Plan
New Source Review (NSR) Program Basics
Preparing for Permit Review
Clean Air Act Glossary.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Overview of New Source Review (NSR)
Department of Environmental Quality
Air Quality Permitting Guidelines for Industrial Sources
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Air Quality Permitting Guidelines for Industrial Sources
Navajo Nation Minor Source Regulations
Presentation transcript:

Navajo Nation Operating Permit Program Tribal Experience - Permit Review Navajo Nation Operating Permit Program Anoop Sukumaran Route 112 North/Bldg. 2837 Fort Defiance, AZ 86504 FAX: (928) 729-4313 Phone: (928) 729-4096 http://www.navajonationepa.org/airq/index.html

NNOPP- Overview October 2004 and March 2006, USEPA approved a Clean Air Act (CAA) program for NNEPA to administer a Title V operating permit program (Part 71 permit program) Under this approval, NNOPP issues air permits to thirteen facilities located on Navajo Nation EPA issues PSD permit and approves draft Title V permit NNOPP performs applicability determination such as NSPS, NESHAP’s requirements etc., NNOPP incorporates PSD , FIP requirements to the Title V permit Emission fees from the Title V facilities paid to the Navajo Nation is used to cover the cost of operating the permit program

Navajo Nation Permit Procedure Title V Permit Navajo Uniform Regs NNOPR, NCAA 40 C.F.R Part 71 PSD, FIP, Acid Rain Req, NSPS, NESHAP

New Source Review (NSR) Program Air Permits Construction Permits New Source Review (NSR) Program Prevention of Significant Deterioration (PSD) Minor Source Permit Non attainment (NAA) NSR Permit Operating Permits Title V Permit Administrative, Minor, Significant, Permit Reopening Title IV: Acid Rain Permit Applicable to the two fossil-fuel fired steam electric plants on Navajo (FCPP and NGS)

Title V Permit Title V permit grants a source permission to operate. Includes all air pollution requirements that apply to source, emissions limits ,monitoring, record keeping, and reporting requirements Major Source Threshold in Attainment Areas State and local permitting authority: Part 70 Permit (40 CFR part 70) EPA issue permit to the sources on Indian land or delegates tribal nation to issue permit : Part 71 permit ( 40 CFR part 71) Pollutant Annual Emissions ( tons/yr) VOC, NOx, SOx, CO, PM10 100 Single HAP 10 Combination of HAPs 25

PSD Permit PSD permit is required before a "major" new source constructs, or before changes or modifications that are "major" or "significant" are made at an existing "major" source of air pollution PSD Requires Best Available Control Technology Air Quality Analysis Additional impact analysis Public Participation Listed 28 Source Category 100 tpy Not Listed 250 tpy Significant threshold 40 tpy NOx, 15 tpy PM etc.,

PSD Permitted Sources on Navajo Nation EPA issues PSD permit to the sources and NNEPA incorporates PSD permit requirements to the Title V permit Navajo Generating Station for installation of Low NOx Burners/Over Fire Air – Increase in “CO” EL Paso Natural Gas Compressor station for facility modernization for installation of Turbines, emission offsets etc., PSD permit contains Stringent emission limits, operating hours limit Requires Emission Controls Continuous emission monitoring system (“CEMS”) Annual performance testing Record keeping and Reporting requirements

Title V Permit Process Major Source :VOC, NOx, CO, PM10, SOx > 100 tpy Single HAP > 10 tpy and Combination HAP > 25 tpy Source submits part 71 operating permit application package to permitting authority Permitting authority determines completeness of application and request for supplement or correct application Permitting authority develops draft permit and statement of basis 45 Day EPA Review Process 30 Day Public Notice (NNEPA Website, Newspapers, Radio, Etc) and Affected State Letter Public comments and requests for public hearing Incorporate applicable comment(s) issuance and effective date of permit (valid for 5 years) Permit Revisions, Permit Renewal and Expiration

Part 71 Permit Application General Information List of Storage Tanks Fuel Usage and Fuel data Air Pollution Units and Control equipment data Emission Unit Description Insignificant Emissions Actual Emission Potential to Emit Calculation Applicability Determination , Regulatory Analysis Compliance Plan and Certification Certification of Truth and Accuracy Modification to Existing Permit

Applicable Requirements New Source Performance Standards (NSPS) 40 CFR Part 60 Identify by Source Category Applicability & Designation of Affected Facility NSPS General Provisions Subpart A Emission limits, monitoring, testing and recordkeeping (MRR) National Emission Standards for Hazardous Air Pollutant (NESHAP) 40 CFR Part 61 & Part 63 Maximum Achievable Control Technology (MACT) Work Practice Standards Emission limits, MRR

Potential To Emit PTE assumes 8,760 hours/year at max rated capacity except for operating hour restriction Criteria air pollutants, HAPs AP 42, manufactures data, stack testing data, engineering judgment, material balance etc., Permit streamlining for emission limits PSD , FIP emission limits Major Source Determination PTE calculation should be included in the final permit and summary of emissions in Statement of Basis (SOB)

Title V- 40 CFR Part 71 Permit Content Source Identification Company name, address, and location, etc Owner/ Operator Process and Operation of Facility SIC Code and AFS Plant Identification Number. Requirements of Specific Units New Source Performance Standards ( NSPS General Provisions) Federal Implementation Plan Requirements ( FIP e.g. NGS, FCPP) Acid Rain Requirements Operation Flexibility Facility Wide or Generic Permit Condition Testing Requirements Recordkeeping Requirements Reporting Requirements Protection of Stratospheric Ozone Asbestos from Demolition and Renovation Compliance Schedule

Title V- 40 CFR Part 71 Permit Content cont’d IV. Title V Administrative Requirements Part 71 Fee Payment Compliance Certifications Minor Permit and Significant Modifications Administrative Amendments Inspection and Entry Statement of Basis (S.O.B): Is an Engineering Document. Discussion of the Monitoring and Operational Requirements Discussion of Applicability and Exemptions Insignificant Activities New Emission Units and Control Equipment Emission Calculation PSD Applicability

Draft Permit Public Notice Location of the source, permit action, applicable requirements Deadline for submittal of comments Permitting authority contact information Opportunity to be included in NNOPP mailing list 30 day public notice of draft permit Newspapers, radio announcement, NNOPP website Mailing a copy of the notice to affected state /local/tribe Public can view the draft permit at NNOPP office Administrative record of the draft permit

What is the Role of the Public in Permits? Become knowledgeable about the operation of facilities Ask questions, provide comments, and submit concerns Participate during outreach and public hearing Notify permitting authority about any issues with facility operation Request for: Navajo Air Quality Regulations Copies of Permits General Information Public Workshop Submit comments during public comment period that relate to the permit conditions

Request for Public Hearing Any interested person may submit written comments and request for public hearing Request should be in writing and state the nature of issue If there is significant degree of interest on the permit, NNOPP will hold a public hearing in accordance to Navajo Uniform Regulation Issue public notice of the hearing Develop factsheet Hearing Moderator, Diné interpreter Certified court reporter or recorder Presentation of the permit action Public comment extends until conclusion of the hearing

Response to Comments & Appeal of Permit Prepare responses to all comments Justify the changes made to permit Legal review of the responses Final Permit Package Final Permit signed by NNEPA Executive Director Statement of Basis, Emission Calculation, Public Notice and Response to Comments Appeal of Permit 30 days after the final permit Any person who filed comments on the draft permit or at public hearing Environmental Appeals Board Review

NNOPP Permitting Experience Peabody Western Coal Company V/S NNEPA NGS Permit Reopen Public Hearing Request for waiver from annual emission testing due to market condition Klagetoh Compressor Station transition to electrically powered turbine New microturbines replacing older auxiliary engines to avoid major HAP source NESHAP requirements and better reliability Administrative amendments, permit reopening, minor permit modification New regulations, compliance deadline, applicability determination Outreach to local chapters