Slide: 1 27 th CEOS Plenary |Montréal | 5 - 6 November 2013 Agenda item: 31 Satoko Horiyama MIURA WGISS Report and Actions.

Slides:



Advertisements
Similar presentations
GEOSS Common Infrastructure (GCI): status and evolution EC Side Event - GEO Plenary IX Foz do Iguacu, November 2012 Mirko Albani Earth Observation.
Advertisements

Integrating NOAA’s Unified Access Framework in GEOSS: Making Earth Observation data easier to access and use Matt Austin NOAA Technology Planning and Integration.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
Working Group on Information Systems and Services 0.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
WGISS CNES SIT-30 Agenda Item 10 CEOS Action / Work Plan Reference 30 th CEOS SIT Meeting CNES Headquarters, Paris, France 31 st March – 1 st April 2015.
Slide: 1 CWIC Status Report Yonsook Enloe WGISS-39, Tsukuba May 13, 2015.
Slide: 1 37 th WGISS meeting|Cocoa beach | 14 april 2014 Richard Moreno WGISS chair report.
U.S. Department of the Interior U.S. Geological Survey Web Services Interest Group WGISS #28 September, 2009 Pretoria, South Africa Lyndon R. Oleson U.S.
GCMD/IDN STATUS AND PLANS Stephen Wharton CWIC Meeting February19, 2015.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
Slide: 1 WGISS-37, April 2014 Yonsook Enloe Martin Yapur CWIC Report.
Anticipated Outcomes from CEOS WGs in 2010 Strategic Discussion on what the WGs should seek to achieve 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November.
The 26 th CEOS Plenary – Bengaluru, India October, 2012 Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 WGISS Report.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
WGISS Richard MORENO CNES CEOS SIT-29 Meeting CNES, Toulouse, France 9 th -10 th April 2014.
WGISS-40, Harwell, Oxfordshire, UK, Sept. 28-Oct. 2, 2015 GEO/CWIC Interactions Ken McDonald/NOAA CWIC Session, WGISS–40 October 1, 2015.
WGISS Working Group on Information Systems and Services Richard MORENO CNES WGISS report, Agenda Item 14 Tromsø, Norway October 2014.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 33 Brian Killough, NASA, CEOS SEO CEOS Plenary, November 5-6, 2013 CEOS Systems.
What is CWIC? Authors: Doug Newman Andrew Mitchell
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
WGISS Richard Moreno CNES SIT Workshop Agenda Item #7 WGISS working group CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th -18 th September.
WGISS Richard MORENO CNES SIT Workshop Agenda Item #8 CEOS SIT Technical Workshop CNES, Montpellier, France 17 th -18 th September 2014.
Committee on Earth Observation Satellites CNES Plenary Agenda Item #21 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Support to GCI Agenda Item 8 Ivan Petiteville, ESA.
CWIC/Opensearch CCMEO Status WGISS 40 Patrick King Brian McLeod Canada Centre for Mapping and Earth Observation.
Slide: 1 CWIC Status Report Yonsook Enloe WGISS-40, Harwell UK Oct 1, 2015.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
Task IN-03 GEO Work Plan Symposium 2014 GEOSS Common Infrastructure IN-03.
WGISS Response to CEOS Actions Assigned to WGISS Richard Moreno CNES – WGISS chair WGISS-40 Harwell – United Kingdom 28 th September 2015 Committee on.
Slide: 1 37 th WGISS meeting|Cocoa beach | 14 april 2014 Richard Moreno WGISS chair report.
Page 1 Federated Earth Observation (FedEO) Status CEOS WGISS Meeting #40 28 Sep – 02 Oct, 2015 Harwell, UK Hosted by UKSA M.Albani, P.Mougnaud, A.Della.
CEOS OpenSearch Project Yoshiyuki Kudo (JAXA) WGISS-37.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
WGISS Working Group for Information Systems & Services Andrew Mitchell NASA– WGISS chair WGISS-41 Canberra – Australia 14 th March – 18 th March 2016 Committee.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEOSS Common Infrastructure (GCI) The GEOSS Common Infrastructure allows Earth Observations users to search, access and use the data, information, tools.
CEOS Working Group on Information System and Services (WGISS) Data Access Infrastructure and Interoperability Standards Andrew Mitchell - NASA Goddard.
GCI Architecture GEOSS Information System Meeting 20 September 2013, ESA/ESRIN (Frascati, Italy) M.Albani (ESA), D.Nebert (USGS/FGDC), S.Nativi (CNR)
WGISS Recommendations to WGISS – Applications Subgroup Karen Moe WGISS Applications Subgroup Chair WGISS-29 Bonn, Germany 21 May 2010.
Incoming Themes for 2017 Frank Kelly, USGS
ESA-FAO GEOPortal STATUS & PLANS
CWIC Status Report Yonsook Enloe yonsook. k.
CEOS Work Plan Andrew Mitchell - NASA WGISS-43
PROJECTS & APPLICATIONS SUBGROUP
CEOS OpenSearch Project II
WGISS Connected Data Assets
CWIC Status Report Yonsook Enloe yonsook. k.
WGISS Connected Data Assets
High Level Architecture
WGCapD Report Phila Sibandze, SANSA CEOS Plenary 2017
WGISS Connected Data Assets Sept 26, 2017 Yonsook Enloe
WGISS Working Group for Information Systems & Services
CEOS OpenSearch Project II
CWIC Status Report Yonsook Enloe yonsook. k.
SEO Report Brian Killough NASA, CEOS Systems Engineering Office
WGISS Connected Data Assets April 5, 2017 Yonsook Enloe
CEOS and GEO Workplan Review
Topics NOAA support for: CWIC Infrastructure NOAA as a Data Provider
WGISS Connected Data Assets April 9, 2018 Yonsook Enloe
WGISS Working Group for Information Systems & Services
CEOS WGISS INTEGRATED CATALOG (CWIC)
WGISS Working Group for Information Systems & Services
WGISS Connected Data Assets Oct 24, 2018 Yonsook Enloe
CEOS Context LSI/SDCG/GEOGLAM Joint Meeting
SEO Report Brian Killough, NASA, CEOS SEO CEOS Plenary 2018
WGISS Connected Data Assets Session Today
Data Discovery and Access Session Summary of Actions
WGISS WGISS Connected Data Assets Status Report October, 2019 CWIC Team Eugene Yu (GMU), Archie Warnock (A/WWW), Li Lin (GMU)
CEOS WGISS Carbon Data Portal: Progress and Demo CEOS WGISS Carbon Portal Team Reported at WGISS’48 Vietnam Academy of Science and Technology, Hanoi,
Presentation transcript:

Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 31 Satoko Horiyama MIURA WGISS Report and Actions

27 th CEOS Plenary Montréal, Canada 5-6 November, Actions from the SIT meeting and SIT Technical WS “For Information” 2.Accomplishments since the last Plenary “For Information” & “Requesting Guidance” 3.Current Challenge “Requesting Guidance” 4.Way Forward “For Information” Contents

27 th CEOS Plenary Montréal, Canada 5-6 November, Action SIT28-18:WGISS Chair to report to CEOS Plenary on progress towards specification and implementation of CEOS OpenSearch, raising any issues that CEOS Principals need to consider. →Shown under “Accomplishments” Action SITWS2013-8:Satoko Miura to work with USGS to seek USGS representation within WGISS. → Closed. New representative from USGS was identified. → “I am pleased to announce that the newly established USGS Data Management Branch out of EROS will be supporting this activity and Kristi Kline is the point of contact. “ Message from Mr. Thomas Cecere, USGS CEOS POC 1. Action from the SIT/SIT Technical WS For information

27 th CEOS Plenary Montréal, Canada 5-6 November, Accomplishments 2.1 CEOS OpenSearch Project Progress Goal 4 For information

27 th CEOS Plenary Montréal, Canada 5-6 November, Project Objective −Establishes a common CEOS interoperability best practice of OpenSearch to allow standardized and harmonized access to metadata and data of CEOS member agencies, including CWIC and FedEO communities Project members –ESA –NASA –JAXA –CNES –NOAA 2. Accomplishments 2.1 CEOS OpenSearch Project Progress For information

27 th CEOS Plenary Montréal, Canada 5-6 November, Schedule 2. Accomplishments 2.1 CEOS OpenSearch Project Progress For information WGISS-37 Workshop for client/server implementers Sep OGC-CEOS Joint meeting, Sep23 April/ May (TBD) Sep OGC OpenSearch Public Comment Period (1month) NovOct FedEO and CWIC start to implement the CEOS OpenSearch for external client access (before WGISS-37) CEOS OpenSearch Best Practice Document WGISS-38 Draft document Ver 1.0

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2013 IDN 7 2. Accomplishments (cont.) 2.2 Dataset registration Status For information Oct ,981 Feb-2013 (Before SIT-28) 14,867 Total Registered Datasets from CEOS Agencies Monthly IDN Entry Updates Jan Feb Mar Apr May Jun Jul Aug Sep 2013

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 FedEO (1) Numeric 8 2. Accomplishments (cont.) 2.2 Dataset registration Status For information # of discoverable collections = 433 # of accessible collections = 433 # of discoverable granules > 6 millions

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 CWIC (1) Numeric (Oct 2013) # of discoverable and accessible collections = 1,809 # of discoverable and accessible granules >50 millions # of GEOSS Data Core => 1,807 collections & >50 millions granules 9 2. Accomplishments (cont.) 2.2 Dataset registration Status For information (2) Updates CCMEO (formerly CCRS) became an operational CWIC partner in October, They are offering Radarsat-1 and Radarsat-2 data.

27 th CEOS Plenary Montréal, Canada 5-6 November, Positive Interaction with Disaster Study Group, WGCapD, WG Climate and WGCV Several Documents Released − GA.4. Disasters (GEOSS Architecture for the Use of Satellites for Disasters and Risk Assessment ) architecture document update − The Browse Guideline Document ( t=blog&id=137&Itemid=218) Is there any appropriate place to publish key Working Group results for all of CEOS? The new version of the CEOS Water Portal was released in May, 2013 ( −Prototyping to evaluate interoperability with GCI (GEO Data Access Broker) is on-going and lessons learned will be summarized early next year. 2. Accomplishments (cont.) 2.3 Others For information Requesting Guidance

27 th CEOS Plenary Montréal, Canada 5-6 November, IDN Dataset Maintenance −An automated report ( ) indicating any problem of each dataset was set up (on periodic basis ). −The first report has been sent to the metadata author (included in each data set information) and CEOS WGISS agency contact on September 17, −WGISS would like to request each CEOS member agency, especially those without active WGISS participation, to have a look at the automated report and take required actions in a timely manner. 3. Current Challenges Requesting Guidance

27 th CEOS Plenary Montréal, Canada 5-6 November, WGISS will work with SEO closely (e.g., historical data search to support SDCG for GFOI and GEOGLAM) WGISS will continue to support data access initiatives (incl. VC and GCI) −Using CEOS OpenSearch protocol, CWIC and FedEO will become accessible from external client (incl. GCI). −IDN will be used as dataset registration system for CEOS agencies. −Demonstration/Showcase based on the VC portal data access initiative (led by CNES) 4. Way Forward For information

27 th CEOS Plenary Montréal, Canada 5-6 November, Leadership Change a.New chair (Nov., 2013~) : Richard Moreno/CNES b.New vice chair (Nov., 2013~) : Andrew Mitchell/NASA WGISS Documents a.The current 5-year plan will be updated, in accordance with the CEOS work plan and related CSS recommendations. 4. Way Forward (cont.) For information

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 Thank you for… Giving me the first experience to serve as the chair of an international group.

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 Thank you for… Helping me improve my English skill.

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 Thank you for… Your kind and warm support during and between the meetings. Your continuous supports for our new chair and vice-chair.

27 th CEOS Plenary Montréal, Canada 5-6 November, BackUp

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 IDN Interest Group 1.CEOS IDN CEOS International Directory Network ( An international effort developed to assist users in locating data sets, data services, and visualizations. Provide free, online access to metadata on scientific data in the Earth sciences: geoscience, hydrospheric, biospheric, satellite remote sensing, and atmospheric sciences. Provide clients/portals directory-level search of CEOS agencies and others who have registered their collections in the IDN 2.IDN Services IDN CSW access : Procedures for accessing the IDN CSW Testing Server ( Connect to the IDN Metadata Web System (MWS) and Keyword Management System (KMS) RESTful Web Services ( 3.IDN IG IDN IG is responsible for coordinating activities among the participating agencies to maintain, improve, and expand the functions and use of the CEOS IDN, which is the largest scientific directory service in the world. 18

27 th CEOS Plenary Montréal, Canada 5-6 November, IDN IDN Search Options Total CWIC tagged records in the IDN by Agency –NASA1749 –NOAA/NODC 60 –USGS(GFOI, CalVal, Landsat) 55 –INPE (Brazil) 15 –CCRS (Canada) Accomplishments (cont.) 2.2 Dataset registration Status For information

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 CWIC Project CWIC = CEOS WGISS Integrated Catalog Implemented to realize a federated catalogue for data discovery from multiple EO data centers The CWIC architecture consists of 3 main items: CWIC middleware - provides an access point for an inventory-level search at CEOS agencies who are CWIC data providers CWIC clients/portals - user interfaces to access cross-discipline data from CWIC data providers IDN – International Directory Network (IDN) provides clients/portals directory-level search of CEOS agencies who have registered their collections in the IDN 20

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 What is HMA A collaborative project started in Europe and Canada by the Ground Segment Coordination Body (GSCB) in 2005 with the objective to: Guarantee a seamless and harmonised access to heterogeneous EO datasets from multiple mission ground segments, including national missions and ESA missions. Standardise the ground segment interfaces of the satellite missions for easier access to EO data. Provide interoperability for coordinated data access enabling the interactions with services or Value Adders and EO Contributing Missions.

27 th CEOS Plenary Montréal, Canada 5-6 November, 2013 FedEO Current Set-up FedEO is a prototype system providing a brokered discovery (and access) capability to European (and Canadian) EO missions data based on HMA interfaces