20 July 2007 Tom Peterson CEC ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20.
Advertisements

Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Pressure Vessel Safety Calculation Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting Durham, NC May 20-21, 2008.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Interface issues on Super-FRS magnets test at CERN
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Blade Tuner L. Lilje for the INFN colleagues. Disclaimer The slides were prepared by R. Paparella and N. Panzeri for Carlo Pagani who could not attend.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Cryostat / Cryogenics Summary and (Proposed) Conclusions T. Peterson 25 April 2008.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Cryogenic Safety and Oxygen Deficiency Hazards (ODH) at Fermilab Tom Peterson ESS Cryogenic Safety Workshop 11 February 2016.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Overview of the ESS Linac Cryogenic Distribution System
LCLS-II Cryomodule Design
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Cryomodule Development Status Prashant Khare, Shailesh Gilankar Pradeep Kush, Rupul Ghosh Abhishek Jain, A. Laxminarayanan, Rajeev Chaube.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Cryomodules as Part of the ILC Cryogenic System
2 K Coldbox Safety and ESH
Cryogenic behavior of the cryogenic system
Project X: Cryogenic Segmentation Issues
Hollow e- lens, Cryogenic aspects
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ILC Cryogenic Systems Draft EDR Plan
2K Cold Box Process Design
Cryogenic cavern in Asian site
ILC Experimental Hall Cryogenics An Overview
ILC Cryogenics -- Technical Design Report Planning
ESS elliptical cryomodule
Cryogenic behavior of the magnet
Presentation transcript:

Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007

18 Nov 2008 He pressure excursions 2 Update of Oct 2007 Comments October, 2007, slides summarizing helium vessel pressure issues are appended here We should review helium vessel maximum pressures in light of DESY “crash test” and pressure tests We should review vacuum vessel venting in light of LHC magnet vacuum space overpressure incident

18 Nov 2008 He pressure excursions 3 Crash and pressure test comments 2 bar warm and 4 bar cold maximum differential pressures (MAWP) were an initial compromise choice –2 bar warm for cryogenic operation –4 bar cold to accommodate worst-case loss of vacuum pressure rise DESY crash test slow pressure development at 2 K with maximum of about 2.5 bar –4 bar MAWP looks conservatively high –Still need to evaluate maximum pressure with venting path from string of cryomodules Pressure test indicates possibility of one pressure rating -- 4 bar warm or cold –Means pressure testing at around 5 bar warm

18 Nov 2008 He pressure excursions 4 Vacuum vessel venting Can LHC-type accident occur in SRF string? LHC (my unofficial account of the events) -- electrical arc, rupture of 2 K helium bellows and release of helium into insulating vacuum space at LHC –LHC magnets quenched into insulating vacuum space Pressure starts at about 1.2 bar nominal Flow driven by higher pressure from magnet string quench In contrast, 2 K RF system starts at 30 mbar 2 K RF system does not have the stored energy of a magnet system –LHC high pressure (~16 bar) thermal shield line also subsequently ruptured into vacuum space Several sources of pressure due to rupture of several lines –Magnet motion due to pressure in vacuum space

18 Nov 2008 He pressure excursions 5 ILC vacuum vessel venting Low pressure and low stored energy in 2 K part of SRF system However, ILC concept includes high pressure shields – bar is current plan, but pressures need to be evaluated with cryogenic plant cycle –In any case, shield pipe up to 80 mm ID, so potentially very large flow into vacuum space Cryomodule strings will require large and frequent vacuum relief ports –Need to evaluate path to relief port (through thermal shields, not blocked by MLI, etc.) –XFEL is also re-evaluating vacuum space venting requirement

Reference slides From October, 2007

18 Nov 2008 He pressure excursions 7 Cryogenic plant arrangement

18 Nov 2008 He pressure excursions 8 Causes of pressure excursions Worst case location is probably always the cavity helium vessels in the string 2.4 km from the cryogenic plant Purification and cool-down flow Warm-up flow Compressor failure (e.g., power outage) Control and/or valve failures Loss of insulating vacuum while cold Loss of cavity vacuum while cold

18 Nov 2008 He pressure excursions 9 A cryogenic “string”

18 Nov 2008 He pressure excursions 10 Type 4 cryomodule pipe sizes

18 Nov 2008 He pressure excursions 11 Pipe size summary as of July 07

18 Nov 2008 He pressure excursions 12 Purification and cool-down XFEL paper states that the 2.2 K supply line limits flow, confirmed above –Numerical simulations for the cooldown of the XFEL and TTF superconducting linear accelerators by K. Jensch, R. Lange, B. Petersen Appears to be less than 0.1 bar delta P in line B for all possible warm flow conditions as limited by line A.

18 Nov 2008 He pressure excursions 13 Compressor shutdown Suction pressure rises to the suction relief valve settings –Pressure sits at the suction relief pressure while helium vents –Unlike higher pressure reliefs, helium must vent outside of system Large loss of helium inventory Low pressure volume of 210,000 liters per cryogenic unit However, each 0.1 bar helium = only about 26 liquid liters equiv –Need relief set pressure safely above anticipated operating pressures to avoid accidental, unnecessary, loss of helium

18 Nov 2008 He pressure excursions 14 Peak warm pressure Compressor suction set pressure –1.2 bar Control margin –+/- 0.2 bar Relief set pressure margin –0.3 bar (a judgment here, would like 0.5 bar) Suction relief set pressure –1.7 bar Pressure drop from far string –0.1 bar Peak warm pressure –1.8 bar (note that 0.5 bar set P margin ==> 2.0 bar)

18 Nov 2008 He pressure excursions 15 Cold peak pressures - 1 Loss of vacuum to air –“Safety Aspects for the LHe Cryostats and LHe Containers,” by W. Lehman and G. Zahn, ICEC7, London, 1978 “3.8 W/sq.cm. for an uninsulated tank of a bath cryostat” “0.6 W/sq.cm. for the superinsulated tank of a bath cryostat” –“Loss of cavity vacuum experiment at CEBAF,” by M. Wiseman, et. al., 1993 CEC, Advances Vol. 39A, pg 997. Maximum sustained heat flux of 2.0 W/sq.cm. –LEP tests and others have given comparable (2.0 to 3.8 W/sq.cm.) or lower heat fluxes –Film boiling of helium with 60 K surface is about 2.5 W/sq.cm.

18 Nov 2008 He pressure excursions 16 Cold peak pressures - 2 Relief pressure will be suction relief set pressure (for example, 1.7 bar) Heat flux of 10’s of KW to liquid helium Mass flows of many kg/sec Pressure drops to vent may result in peak pressures of bar locally TTF, TESLA, and XFEL analyses have been done Fermilab has done analyses of single cavity systems

18 Nov 2008 He pressure excursions 17 Cold peak pressures in TTF/ILC Analyses of TTF and TESLA back in the early 1990’s indicated that worst-case loss of vacuum might lead to pressures near 4 bar cold Also have recent XFEL analysis (need to find, but comparable results, no more than 4 bar) Input parameters –Heat flux as limited by Rate of air inleak Suface heat transfer –Total surface area involved Can be limited by vacuum breaks, fast valves –Initial conditions Note that 4.5 K just after filling is the worst case!

18 Nov 2008 He pressure excursions 18 Ongoing work Analyses already done for single-cavity system –Include FEA of helium vessels –Include venting and pressure drop calculations Working on full cryomodule pressure analysis now –Needed for ILCTA-NML –Cryogenic end boxes on order Engineers are working on helium vessel design for pressure containment with low stress (Fermilab and INFN) –End group stresses and design –Bellows stresses design –Tuner loads, stresses, and design –RF cavity stresses Venting and pressure limits are a cryogenics WP

18 Nov 2008 He pressure excursions 19 Pressure tests DESY will do cold vacuum loss studies of a cryomodule at CMTF Labs could do warm tests of pressure effect on cavity tune –What pressure warm results in some permanent detuning, some yielding –Do not yet see from analyses what is yielding at 2 bar -- should validate analytical models Labs could do cold tests –Sequentially pressurize at 5 K, reduce pressure and test at 2 K, (perhaps 4.2 K?), etc.