Paul Derwent 18-Oct-15 1 Stochastic Cooling in the Fermilab AntiProton Source Paul Derwent Beams Division/Pbar/CDF Sunday, October 18, 2015.

Slides:



Advertisements
Similar presentations
C. Dimopoulou A. Dolinskii, T. Katayama, D. Möhl, F. Nolden,
Advertisements

Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Synchrotron Radiation What is it ? Rate of energy loss Longitudinal damping Transverse damping Quantum fluctuations Wigglers Rende Steerenberg (BE/OP)
Cooling Accelerator Beams Eduard Pozdeyev Collider-Accelerator Department.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
The Fermilab Antiproton Source Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab 3 December 2007.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
2 Lasers: Centimeters instead of Kilometers ? If we take a Petawatt laser pulse, I=10 21 W/cm 2 then the electric field is as high as E=10 14 eV/m=100.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Details of space charge calculations for J-PARC rings.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam observation and Introduction to Collective Beam Instabilities Observation of collective beam instability Collective modes Wake fields and coupling.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
F Fermilab July 6, 2005Recycler Damper Stability1 Recycler Damper High Frequency Stability Jim Crisp
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Particle physics experiments l Particle physics experiments: collide particles to  produce new particles  reveal their internal structure and laws of.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Hampton, VA, Jan , 2015 Longitudinal.
Debuncher Stochastic Cooling Paul Derwent March 3, 2016.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
BBFP J. Wei’s Fokker-Planck solver for bunched beams November 21 st, 2007 CLIC Beam dynamics meeting Y. Papaphilippou.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
 NICA is being constructed  For heavy ions we need very highluminosity level – 10 cm s  For keeping up such level we inevitably need cooling  Stochastic.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Intra-Beam scattering studies for CLIC damping rings A. Vivoli* Thanks to : M. Martini, Y. Papaphilippou *
Marina Dolinska 28 th August, Cooling methods Electron (SIS18, ESR, RESR, NESR, HESR) Stochastic (ESR, CR, RESR, HESR) Laser (ESR ??, HESR ??).....other.
6 July 2010 | TU Darmstadt | Fachbereich 18 | Institut Theorie Elektromagnetischer Felder | Sabrina Appel | 1 Micro bunch evolution and „turbulent beams“
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Stochastic cooling system: Start-up and project modes
Accumulation Experiments with Stochastic Cooling in the ESR
Beam based measurements
HIAF Electron Cooling System &
Simulation of Luminosity Variation
Electron Cooling Simulation For JLEIC
Beam-beam effects in eRHIC and MeRHIC
Injection design of CEPC
JLEIC Ion Integration Goals
Presentation transcript:

Paul Derwent 18-Oct-15 1 Stochastic Cooling in the Fermilab AntiProton Source Paul Derwent Beams Division/Pbar/CDF Sunday, October 18, 2015

Paul Derwent 18-Oct-15 2 Stochastic Cooling Main Entry: sto·chas·tic Pronunciation: st&-'kas-tik, stO- Function: adjective Etymology: Greek stochastikos skillful in aiming, from stochazesthai to aim at, guess at, from stochos target, aim, guess -- more at STING Date: : RANDOM; specifically : involving a random variable 2 : involving chance or probability : PROBABILISTIC <a stochastic model of radiation-induced mutation> - sto·chas·ti·cal·ly /-ti-k(&-)lE/ adverb Main Entry: 2 cool Date: before 12th century intransitive senses 1 : to become cool : lose heat or warmth <placed the pie in the window to cool> -- sometimes used with off or down 2 : to lose ardor or passion transitive senses 1 : to make cool : impart a feeling of coolness to -- often used with off or down 2 a : to moderate the heat, excitement, or force of : CALM b : to slow or lessen the growth or activity of -- usually used with off or down <wants to cool off the economy without freezing it -- Newsweek> - cool it : to calm down : go easy <the word went out to the young to cool it -- W. M. Young> - cool one's heels : to wait or be kept waiting for a long time especially from or as if from disdain or discourtesy From Webster’s Collegiate Dictionary

Paul Derwent 18-Oct-15 3 Why an Antiproton source? o p pbar physics with one ring  Dense, intense beams for high luminosity

Paul Derwent 18-Oct-15 4 Luminosity History Collider Run I It’s all in the pbars!

Paul Derwent 18-Oct-15 5 Making Anti-protons o 120 GeV protons off metal target o Collect some fraction of anti-protons which are created  Within collection lens aperture  Momentum ~8 GeV (±2%)

Paul Derwent 18-Oct-15 6 Why an Anti-proton source? ~11,000 cycles Store and cool in the process! o Collect ~2 x pbars/proton on target  ~5e12 protons on target  ~1e8 pbars per cycle  0.67 Hz  Large Energy Spread & Emittance o Run II Goals  36 bunches of 3 x pbars  Small energy spread  Small transverse dimensions

Paul Derwent 18-Oct-15 7 Pbar Longitudinal Distribution

Paul Derwent 18-Oct-15 8 Overview Information o Frequency Spectrum  Time Domain:  (t+nT 0 ) at pickup  Frequency Domain: harmonics of revolution frequency f 0 = 1/T 0  Accumulator: T 0 ~1.6  sec (1e10 pbar = 1 mA) f 0 (core) Hz 127th Harmonic ~79 MHz

Paul Derwent 18-Oct-15 9 Idea Behind Stochastic Cooling o Phase Space Compression: Dynamic Aperture: Area where particles can orbit Liouville’s Theorem * : Local Phase Space Density for conservative system is conserved *J. Liouville, “Sur la Théorie de la Variation des Constantes arbitraires”, Journal de Mathematiques Pures et Appliquées”, p. 342, 3 (1838) WANT TO INCREASE PHASE SPACE DENSITY! x x’ x

Paul Derwent 18-Oct Idea Behind Stochastic Cooling o Principle of Stochastic cooling  Applied to horizontal  tron oscillation o A little more difficult in practice. o Used in Debuncher and Accumulator to cool horizontal, vertical, and momentum distributions  COOLING? Temperature ~ minimize transverse KE minimize  E longitudinally Kicker Particle Trajectory

Paul Derwent 18-Oct Why more difficult in practice? o Standard Debuncher Operation:  10 8 particles, ~uniformly distributed  Central revolution frequency Hz »Resolve seconds to see individual particles! »100 THz antennas = 3 µm!  pickups, kickers, electronics in this frequency range ?  Sample N s particles -> Stochastic process »N s = N / 2TW where T is revolution time and W bandwidth »Measure deviations for N s particles  Higher bandwidth the better the cooling

Paul Derwent 18-Oct Simple Betatron Cooling With correction ~ g, where g is related to gain of system  New position: x - g o Emittance Reduction: RMS of kth particle

Paul Derwent 18-Oct Stochastic Nature? o Result depends upon independence of the measured centroid in each sample  In case where have no frequency spread in beam, cannot cool with this technique!  Some number of turns M to completely generate independent sample o But…  Where is randomization occurring? »WANT: kicker to pickup GOOD MIXING »ALSO HAVE: pickup to kicker BAD MIXING

Paul Derwent 18-Oct Cooling Time o Electronic Noise:  Random correction applied to each sample  More likely to heat than cool  Noise/Signal Ratio U  High Bandwidth  Low Noise  Optimum Gain (in correction g) goes down as N goes up!

Paul Derwent 18-Oct Momentum Cooling  Time evolution of the particle density function,  (E) = ∂N / ∂E  Fokker-Planck Equation -- c first used to describe Brownian motion o Two Pieces:  Coherent self force through pickup, amplifier, kicker »Directed motion of the particle  Random kicks from other particles and electronic noise »Diffusive flux from high density to low density

Paul Derwent 18-Oct Simple Example o Linear Restoring Force with Constant Diffusive Term (Electronic noise)  Gaussian Distribution o Inject at E> E 0  Coherent force dominates --- collected into core!  E0E0 ‘Stacked’ F(E) D(E) Simulation!

Paul Derwent 18-Oct Types of Momentum Cooling o Filter Cooling:  Use Momentum - Frequency map  Notch Filters for Gain Shaping »Debuncher »Recycler »Stack tail (as correction) Splitter Combiner Adjustable Delay Notch Filter

Paul Derwent 18-Oct Types of Momentum Cooling o Palmer Cooling  Use Momentum - Position Map in regions of Dispersion  Pickup Response vs Position to do Gain Shaping »Accumulator Core: Signal(A) - Signal(B) »Accumulator Stacktail (described in coming slides) AB Beam Distribution Top View

Paul Derwent 18-Oct Momentum Stacking Van der Meer’s solution: desire constant flux past energy point  static solution !

Paul Derwent 18-Oct Van der Meer’s Solution To build constant flux, build voltage profile which is exponential in shape and results in density distribution which is exponential in shape!

Paul Derwent 18-Oct  Exponential Density Distribution generated by Exponential Gain Distribution  Max Flux = (W 2 |  |E d )/(f 0 p ln(2)) Gain Energy Density Energy Stacktail Core Stacktail Core Using log scales on vertical axis

Paul Derwent 18-Oct Implementation in Accumulator o How do we build an exponential gain distribution? o Beam Pickups:  Charged Particles: E & B fields generate image currents in beam pipe  Pickup disrupts image currents, inducing a voltage signal  Octave Bandwidth (1-2, 2-4,4-8 GHz)  Output is combined using binary combiner boards to make a phased antenna array

Paul Derwent 18-Oct Beam Pickups o At A: Current induced by voltage across junction splits in two, 1/2 goes out, 1/2 travels with image current A I

Paul Derwent 18-Oct Beam Pickups o At B: Current splits in two paths, now with OPPOSITE sign  Into load resistor ~ 0 current  Two current pulses out signal line B I  T = L/  c

Paul Derwent 18-Oct Current Intercepted by Pickup  In areas of momentum dispersion D  Placement of pickups to give proper gain distribution +w/2-w/2 y x xx d Current Distribution Use Method of Images

Paul Derwent 18-Oct Accumulator Pickups  Placement  number of pickups  amplification  used to build gain shape  Also use Notch filters to zero signal at core Stacktail Core = A - B Energy Gain Energy Stacktail Core

Paul Derwent 18-Oct Accumulator Stacktail o Not quite as simple:  -Real part of gain cools beam  frequency depends  on momentum  f/f = -  p/p (higher f at lower p)  Position depends on momentum  x = D  p/p  Particles at different positions have different flight times  Cooling system delay constant »OUT OF PHASE WITH COOLING SYSTEM AS MOMENTUM CHANGES

Paul Derwent 18-Oct Accumulator Stacktail Use two sets of pickups at different Energies to create exponential Distribution with desired phase Characteristics Stacktail Design Goal For Run II E d ~ 7 MeV Flux ~ 35 mA/hour Show simulation!

Paul Derwent 18-Oct Performance Measurements o Fit to exponential in region of stacktail ( in these units) o Calculate Maximum Flux for fitted gain shape o Different beam currents o Independent of Stack Size o Max Flux ~30 mA/hour

Paul Derwent 18-Oct Performance Measurements EngineeringRun IiaBest Achieved Run Goal Protons on Target3.8e125e125e12 Cycle Time (sec) Production Efficiency (pbars/10 6 protons) Stacking Rate (1e10 per hour)  Stacking rate limited by input flux and cycle time »Which we limit because of core-stacktail coupling problems

Paul Derwent 18-Oct Performance Measurements o Best Performance:  39.9 mA in 4 hours o Restricted by core- stacktail couplings

Paul Derwent 18-Oct Stacktail - Core Coupling o Coupling in regions where frequency bands overlap  2-4 GHz ! much larger than previous overlap o Two phenomena  Coherent beam feedback »Stacktail kicks beam and coherent motion is seen at core  Misalignment gives transverse - longitudinal coupling »Try to correct with  kickers Pickup Kicker Beam Since beam does not decohere, Carry information back to pickup Feedback! Schottky Pickup Stacktail Core

Paul Derwent 18-Oct Stacktail Schottky Signals Core Freshly injected beam Later in cycle Stacktail Leg1

Paul Derwent 18-Oct Core 2-4 Schottky Signals Core Freshly injected beam Later in cycle Stacktail Leg1

Paul Derwent 18-Oct Pbar Longitudinal Distribution

Paul Derwent 18-Oct Antiprotons & the Collider o From the H - source, Linac, booster, Main Injector  120 GeV protons on the target o From the target:  8 GeV antiprotons through the Debuncher & Accumulator o Send them off to the Tevatron & D0 & CDF