Placing Vapor Distribution Systems and Appliances into Operation MODULE 10 Spillage Test.

Slides:



Advertisements
Similar presentations
Energy Audit Kaylin Fitzgerald Environmental Science Mr. Fitzgerald.
Advertisements

Installing & Testing Regulators
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Building Science Basics WEATHERIZATION INSTALLER/TECHNICAN FUNDAMENTALS.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Mechanical Plan Review. Review Plan Package Use Group/Occupancy Correct Code Reference/Conformance Revisions Mechanical Plans/Spec Books Structural Plans.
How would you explain this on the 3394? If Fire Erupts on YOUR Boat If Underway, stop the boat Have everyone who is not wearing a PFD put one on Position.
Heating Control Devices
Watertube Boiler.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
737 PNEUMATICS MENU PRINCIPAL.
DZAC January 2012 Opening Remarks Ken Fletcher. Items of Interest $25 Safety Spot Award Program to start this month Interpretation of safety signs 2.
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
MODULE 4 Odorants and Service Interruptions.
35” CONDENSING GAS FURNACES Vent and Combustion Air System Design & Installation 1 Add Distributor Art and Text Here.
The House as a System 1. Air Temperature and Water Vapor.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Shelter-In-Place 4 th QTR HazMat Ops. You want me to what? Some kinds of chemical accidents or attacks may make going outdoors dangerous. Leaving the.
Spray Finishing Operations/Spray Booth March 9, 2009.
Station 3 ?? Air Meters Combustion Analyzer Carbon Monoxide Carbon Dioxide Particles Air Flow Vane Anemometer Exhaust Flow Box Pressures CAZ Test.
TOOL BOX TALKS Fire Safety. Fire Safety Tips At least one smoke alarm on each level of building Test smoke alarm monthly and replace battery at least.
Standardized Curriculum WAP Training Plans and Resources.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 5 Validating Combustion Air.
WARM CHOICE Program Combustion Safety Testing Energy Essentials Core Contractor Training December 10 and 11, 2008 Four Points by Sheraton, Mars, PA A.
HVACR416 - Design Pressure Measurement Part 2. Pressure Measurement Several pressure measurements exist. They all measure the same things, the force of.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 3 Validating Vapor Distribution Systems.
VENTING AND COMBUSTION AIR
Pressure Switches. New modulating and multi-stage furnaces are more complex and require that installation instructions and procedures be followed so that.
Gas Furnace Planned Maintenance
CVFD Training – Ventilation Practices
Your House as a Healthy System Bruce Stahlberg. Improvements / Remodeling When one has finished building one's house, one suddenly realizes that in the.
NFPA 54 National Fuel Gas Code Boiler Manufacturer ANSI Standards Local Codes Vent Manufacturer.
MODULE 5 Complete and Incomplete Combustion Characteristics.
1 Combustion Oil Fired Equipment. 2 OIL Combustion of oil fired equipment has the same basics of gas. Remember, Oil is a liquid and this must be converted.
Be the MVP in the CAZ: Combustion Testing for Beginners ESSN 1 Wednesday, April 21, :30 am to Noon 2010 National ACI Conference, Austin TX A. Tamasin.
Designing and Installing Exterior Vapor Distribution Systems
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Designing and Installing Exterior Vapor Distribution Systems
NFPA 31 Standard for the installation of Oil- Burning Equipment
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Student Book © 2004 Propane Education & Research CouncilPage Purging Vapor Distribution Lines & Appliances Purging is the controlled displacement.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 1 Course Introduction.
Safety Talk 9 / 1 Safety Talk 9 Safe Operation of Fired Heaters: start-up.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 4 Identifying Venting Requirements and Characteristics.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
Changes to 2009 IFGC ( International Fuel Gas Code) Adopted by Reference by section Michigan Mechanical Code.
Why Maintenance Tasks are Important Produced by Joe Marchese.
1 Mansel Nelson, ITEP–EEOP. 2 3 Safety Perform regular maintenance Avoid installing unvented (or "vent-free”) heating appliances Consider using only.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Installing Appliances and Interior Vapor Distribution Systems MODULE 1 Introduction.
Eight tips for burning wood. Tip 1 Air! The wood is utilised in the best way when the draught control is fully open and the flames are intense. That will.
PPT Basic Ventilation Bureau of Workers’ Compensation PA Training for Health & Safety (PATHS)
Chimney Fires Lieutenant LeGrotte Sugar Land Fire Department.
3.0 Comprehensive Performance Audit Fossil Fuel Appliances Health & Safety 3.2.
Day 1 Part 4 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Day 2 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
4.0 Equipment Installation Aspects (Section 4.5 On-Rate for Fuel-Fired Equipment)
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – March 2011eere.energy.gov COMBUSTION BASICS HEATING SYSTEMS FOR ENERGY AUDITORS AND INSPECTORS.
Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Part 13 Technician’s Guide & Workbook for Duct Diagnostics and Repair.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
Unit 13 Oil-Burning Equipment
Unit 7 Gas Heat: Natural and LP
Part 12 Technician’s Guide & Workbook for Duct Diagnostics and Repair
RESIDENTIAL CONDENSING GAS FURNACES Vent Design & Installation Training Spring 2014 UTC Building & Industrial Systems Confidential and Proprietary Information.
Manual D Duct Sizes Room Cooling CFM % Total CFM Heating CFM Kitchen GR Dining Bed Bed 3.
Presentation transcript:

Placing Vapor Distribution Systems and Appliances into Operation MODULE 10 Spillage Test

Placing Vapor Distribution Systems and Appliances into Operation LESSON 1 Spillage Test 2

Lesson 1 Placing Vapor Distribution Systems and Appliances into Operation Introduction Earlier in this course, we validated the venting system and verified that enough combustion, dilution, and ventilation air were provided. Now, we must ensure the appliance itself is venting correctly when in operation. This final step to placing an appliance into operation requires you to perform a spillage test. “Spillage” refers to improperly vented flue gases entering a room where an appliance is located. Natural draft vented appliances should be checked for spillage at the draft diverter or draft hood with the appliance operating. If these flue gases were to backflow, or spill, inside a structure, products of combustion could accumulate inside causing a dangerous situation. After completing this lesson, you will be able to:  Perform spillage tests to verify proper venting of flue gases from an appliance. 3

Lesson 1 Placing Vapor Distribution Systems and Appliances into Operation Spillage Test Procedure: Steps 1 and 2 You should perform a spillage test on gas appliances equipped with draft hoods or diverters that rely on natural draft to vent the products of combustion to the outside. No spillage test is required for fan-assisted, draft-induced, power-vented, direct vent, or unvented appliances. Follow these steps to perform a spillage test: Step 1: If possible, close all exterior building doors and windows, fireplace dampers, and doors normally kept closed between where the appliance is located and the rest of the building. Turn on all clothes dryers. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they operate at their highest setting. 4

Lesson 1 Placing Vapor Distribution Systems and Appliances into Operation Spillage Test Procedure: Steps 1 and 2 (cont.) You can determine air infiltration best by maximizing the capacity of all exhaust fans. If you find there is negative pressure, outside air may be pulled down a chimney or gas vent. This backflow may prevent products of combustion from being properly vented. Do not operate a whole house ventilation fan during this test. This will cause a backflow. Step 2: Start up the appliance you are testing for spillage following the manufacturer’s lighting instructions. Adjust the thermostat so the appliance operates continuously. 5

Lesson 1 Placing Vapor Distribution Systems and Appliances into Operation Spillage Test Procedure: Steps 3-5 Step 3: After allowing the main burner to operate for several minutes, hold a lighted match or candle near the draft hood relief opening. Verify that the flame or smoke is drawn into the draft diverter opening, and that no spillage or backdraft is present. When the appliance is not drafting properly, the products of combustion tend to extinguish the flame or not draw smoke into the diverter. Step 4: Turn on all other appliances in the same room as the appliance you are testing so they can operate at full capacity. Follow all manufacturer’s lighting instructions for each appliance. 6

Lesson 1 Placing Vapor Distribution Systems and Appliances into Operation Spillage Test Procedure: Steps 3-5 Step 5: With all appliances turned on, repeat step 3 on the appliance being tested. Open doors closed prior to the start of the test and return exhaust fans, fireplace dampers, and any other appliance to their original state. If you detect spillage, you must find the cause and correct the problem. If you cannot fix the problem on your own, shut the affected appliance off and take it out of service according to your company policy. There are many reasons an appliance may not draft properly. These can include an improperly-sized gas vent or chimney, a flue blockage, or a lack of combustion or dilution air. These conditions and how to resolve them are discussed in detail in a separate CETP course. 7

Lesson 1 Placing Vapor Distribution Systems and Appliances into Operation Check for Understanding: Spillage Let’s take a moment to check how well you understand the information presented in this lesson. Natural draft vented appliances should be checked for spillage at the draft diverter or draft hood with the appliance operating. a)True b)False 8

Lesson 1 Placing Vapor Distribution Systems and Appliances into Operation Module Summary We have now validated the interior and exterior portions of a piping system, as well as its venting combustible air supply. We have performed a leak check, purged the lines of air, lit the pilot, and have performed a system flow and lock-up test as well as a spillage test. We have also examined basic appliance controls and verified their proper operation. If an appliance passes all of these tests and is operating correctly, then it can be placed into operation safely. In the final section of this course, we will discuss gas appliance burner components, how a burner operates, and how to adjust and troubleshoot problems with a flame. 9