WPPI – Member Reliability Standards Compliance 2007 APPA National Conference Given by Mike Stuart June 25, 2007.

Slides:



Advertisements
Similar presentations
1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Advertisements

Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
Underfrequency Load Shedding Report
NERC Fill in the Blank Standards Efforts Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Condition Monitoring Roles in Asset Reliability and Regulatory Compliance Dave Haerle, Los Angeles Department of Water and Power Scott Kunze, DataSplice.
School Board Audit Committee Training Module 7 Evaluation of the Audit Committee 1.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
ERCOT Update on UFLS Annual Survey with TSP/DSP September 2014.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
Grant Reporting. How do you feel about Grant Reporting?
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Patty Bartlett Logan County Treasurer / Public Trustee.
Notice of Compliance Audit
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Support Systems and Tools Brittany Power Data Coordinator.
COMPLIANCE WITH SUNSHINE LAW. Sunshine Law The Sunshine Law is established by Article I, Section 24 of the Florida State Constitution and Chapter 286,
City of Leesburg Electric Department Internal Compliance Program (ICP)
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
NERC Compliance Program Overview FRCC 2007 Compliance Workshop April 4 and 11, 2007.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
April 23 rd OWG UFLS Survey & Power Factor Review.
Assessing Compliance. 2 NERC Compliance Workshop 11/02/07 Documentation of Compliance with NERC Reliability Standards Jeff Whitmer.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
Implementing a Medicare Compliance Program. Implementation of Medicare Compliance Program Rules & procedures to reduce chance of wrongdoing High level.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Overview of WECC and Regulatory Structure
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Reliability Assurance Initiative (RAI) 101 Ben Christensen Senior Compliance Risk Analyst, Cyber Security.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
OnTrack Financial and Grant Compliance. Welcome The OnTrack Policies and Procedures is a draft and a living document. It may be changed based on UWGC.
Texas Regional Entity Report Mark Henry June 6, 2008.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Legal framework Look at the legal compliance and framework a business is subject to.
© CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED BY CONSTELLATION NEWENERGY, INC., A SUBSIDIARY.
WHAT YOU NEED TO KNOW ABOUT NERC ERO COMPLIANCE Louise McCarren Chief Executive Officer – WECC APPA National Conference June 16, 2009 Salt Lake City, Utah.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Rights & Responsibilities under the Fair Work Act 2009 Kingsford Legal Centre – Employment Law Network Date: 19 February 2013 Presented by: Alison Brown.
The Law Offices of Sheila Deselich Cohen. Generally subject to the Employee Retirement Income Security Act of 1974 (“ERISA”). Two main types of plans:
UFLS Survey Explanation
NERC Reliability Readiness The Next Steps
MOPC Meeting Oct , 2016 Little Rock, AR
Session objectives After completing this session you will:
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
UFLS Workshop Discussion #3
Updated ERO Enterprise Guide for Internal Controls
NERC Entity Registration and Certification in the ERCOT Region
WS-Agreement Working Session
GENERAL PARTNERSHIP General Characteristics
Compliance Report to ERCOT TAC February 2007
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Background (history, process to date) Status of CANs
GMD Data Request NERC Rules of Procedure Section 1600
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Reliability Assurance Initiative (RAI) 101
Support Systems and Tools
Presentation transcript:

WPPI – Member Reliability Standards Compliance 2007 APPA National Conference Given by Mike Stuart June 25, 2007

WPPI – Member Compliance Agreement  Applies only to Members (10) subject to NERC Compliance.  Provides for WPPI to: – Register on behalf of Members for certain functions. – Assume compliance responsibility for certain standards on behalf of Members. – Provides for Members to retain responsibility for compliance with applicable standards where responsibility not assumed by WPPI.

Other Agreement Provisions  NERC / MRO Standards Monitoring  Designation of WPPI and Member Representatives  Annual Meetings  Term / Termination – Either party can terminate on 60 days notice. – If terminated, each party directly responsible to NERC / MRO for compliance.

Appendices to WPPI – Member Compliance Agreement  Appendix A – NERC Statement of Compliance Registry.  Appendix B – Matrix of Functions and Standards.  Appendix C: – C-1 – WPPI Direct Registration and Compliance – C-2 – Member Direct Registration and Compliance – C-3 – WPPI Registration and Compliance on behalf of Member – C-4 – Joint Registration and Division of Compliance Responsibility

WPPI/Member Under Frequency Load Shedding (UFLS) Program An Example of WPPI taking Compliance Responsibility on Behalf of Members

Applicable NERC Standards (Effective June 4, 2006 – apply to LSE’s and DP’s) PRC-007 Assuring consistency with regional UFLS program requirements. PRC-008 Implementation and documentation of UFLS equipment maintenance programs. PRC-009 Performance assessment following UF event.

MRO Regional UFLS Programs  In Former MAIN Area: MAIN Guide 1B  In Former MAPP Area: MAPP UFLS Program  These UFLS programs may be replaced in the future, but not likely soon.

UFLS Agreement Summary  Separate WPPI/Member UFLS Agreement.  WPPI assumes responsibility to NERC/MRO.  WPPI plans and coordinates programs.  Members responsible for relays and associated equipment.  WPPI pays any NERC/MRO penalties.  Member reimburses WPPI if penalty due to member non- compliance.

WPPI Activities  Plan and coordinate UFLS program.  Monitor requirements and compliance.  Keep records of installations and capability.  Conduct annual review of installation, operation, maintenance, testing, reporting, and record keeping.  Evaluate results of program activations.  Designate a responsible employee (Program Coordinator).

Member Obligations  Member pays for UFLS equipment installation (unless installed solely to meet UFLS needs).  Member pays for maintenance, repair, setting, and testing of relays.  Member keeps records documenting installation, maintenance, repair, setting, and testing of relays (copy to WPPI).  Members pay for any penalty for non-compliance by member.  Member designates a responsible employee.

What’s next?  Develop recipe for compliance  Standardize reports  Annual meeting to improve process