Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 1 Mu2e Experiment* Eric Prebys For the Mu2e Collaboration *A Letter of Intent to Search for Charged Lepton.

Slides:



Advertisements
Similar presentations
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
High Energy Physics Seminar, Princeton University, April 15, 2009 E Prebys A Muon to Electron Experiment at Fermilab Eric Prebys Fermilab For the Mu2e.
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Eric Prebys Representing the “Mu2e Task Force”: Steve Werkema Jim Morgan Vladimir Nagaslaev Chuck Ankenbrandt Vladimir Shiltsev Ioanis Kourbanis *Mu2e-doc-1911.
The Mu2e Experiment at Fermilab Jim Miller Boston University for the Mu2e Collaboration June 6, 2008.
1 Overview and Challenges for Upgrades: Muon-Electron Conversion at FNAL R. Bernstein Fermilab for the Mu2e Collaboration R. Bernstein Fermilab for the.
Ivan Logashenko for Mu2e Collaboration
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
Conveneers: M. Grassi (INFN, Pisa), K. Ishida (RIKEN), Y. Semertzidis (BNL) Summary of WG4, Part Two. Yannis Semertzidis, BNL 1 August, 2004 Most muon.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Fermilab and Muons Booster, Proton Driver (MECO, PRISM/PRIME, …) David Neuffer Fermilab.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
1 Muon Physics Project X Workshop Fermilab 17 November 2007.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
University of Arizona Physics Colloquium, March 7, 2008 E Prebys A Muon to Electron Experiment at Fermilab Eric Prebys* For the Mu2e Collaboration 1 *U.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Project Overview Ron Ray Mu2e Project Manager Fermilab Sept. 26, 2008 Preliminary Director’s Review of mu2e Fermilab.
F Project X Overview Dave McGinnis October 12, 2007.
Search for Coherent Muon to Electron Conversion: The Mu2e experiment at Fermilab R. Tschirhart Fermilab BEACH 2010, Perugia Italy.
Yannis K. Semertzidis Brookhaven National Laboratory NuFact04 Osaka, 26 July- 1 Aug LFV: Why is it important? LFV Experimental Techniques MECO Experiment.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Summary and Status of the Mu2e Experiment at Fermilab 2011 DPF Meeting Craig Group (University of Virginia and Fermilab) …on behalf of the Mu2e collaboration.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Eric Prebys, FNAL HB2012, Beijing, China.  Representing the Mu2e Collaboration  24 Institutions  ~120 Collaborators  This talk has direct contributions.
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
May William Molzon, UC Irvine Muon Physics at Fermilab 1 Muon Physics at Fermilab Will the physics be important in a global context when the experiment.
Eric Prebys Accelerator Physics Center Fermilab *Very much a work in progress 7/24/09.
Yannis K. Semertzidis Brookhaven National Laboratory MSI-05 KEK, 1-4 March 2005 LFV: Physics Reach LFV Experimental Techniques MECO Experiment at BNL Intensity,
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Slow extraction septa requirements for Rare Symmetry Violating Processes (RSVP) experiments at BNL K.A. Brown Collider Accelerator Department, BNL.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Μ→e search using pulsed muon beam μ -  e - νν nuclear muon capture Muon Decay In Orbit  π - +(A,Z)→(A,Z-1)*, (A,Z-1)* →γ+(A,Z-1), γ→e + e - Prompt.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
COMET and DeeMe. Mu-e conversion search at J-PARC COMET Target sensitivity 10 C.L. using aluminum target – SINDRUM II 7x – MEG 2.4x
Lepton Flavor Violation Search via Muon to Electron Conversion W. Molzon, University of California, Irvine B-L International Workshop Berkeley September.
Mu2e and Project X, September 3, 2008 E Prebys Background: Proton Economics in Project X Era* Assume  9mA*1ms = 5.3x10 13 protons/linac “blast”  Main.
Giovanni Onorato Fermilab University of Rome “Guglielmo Marconi” INFN Lecce Mu2e general presentation.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
1 Beam Extinction and Monitoring at the Upcoming Mu2e Experiment Ryan J. Hooper on behalf of the Mu2e Collaboration DPF 2015 August 5th, 2015.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
The MECO Experiment Coherent µ  e Conversion in the Field of a Nucleus P. Yamin, BNL.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Eric Prebys Fermilab For the Mu2e Collaboration November 16, 2010.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Proton Drivers & Muon Sources at Fermilab David Neuffer Fermilab.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
The Mu2e experiment Finding a needle in a trillion haystacks Bertrand Echenard California Institute of Technology FNAL Users' meeting June 2013.
The physics of Mu2e Bertrand Echenard California Institute of Technology Mu2e computing review doc-db XXXXX.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
High Energy Physics Seminar, University of Chicago, March 31, 2008 E Prebys A Muon to Electron Experiment at Fermilab Eric Prebys Fermilab For the Mu2e.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The Mu2e Experiment at Fermilab Jim Miller Boston University for the Mu2e Collaboration.
The Mu2e Experiment at Fermilab: Giovanni Onorato, Fermilab - INFN Lecce – Universita’ G. Marconi Mu2e Member Institutions: Boston University; Brookhaven.
The Mu2e experiment at Fermilab Finding a needle in a trillion haystacks Bertrand Echenard California Institute of Technology APS Meeting – April 2013.
The Mu2e Experiment A search for charged lepton flavor violation at FNAL For the Mu2e Collaboration Kevin Lynch Boston University 2010 Fermilab Users'
New cLFV search experiments using the mu-e conversion process Satoshi MIHARA KEK, Japan.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Prospects for a High Sensitivity Lepton Flavor-Violating Search at Fermilab Yury Kolomensky University of California, Berkeley On Behalf of the Mu2e Collaboration.
A New Sensitive Search for Muon to Electron Conversion Mu2e Experiment at Fermilab Mu2e Collaboration: Boston U, BNL, UC Berkeley & LBNL, UC Irvine, CUNY,
The COMET Experiment Ajit Kurup, Imperial College London, on behalf of the COMET Collaboration. ABSTRACT The COherent Muon to Electron Transition (COMET)
COherent Muon to Electron Transition (COMET)
Presentation transcript:

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 1 Mu2e Experiment* Eric Prebys For the Mu2e Collaboration *A Letter of Intent to Search for Charged Lepton Flavor Violation in Nuclear Muon Capture

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 2 Goals of Experiment Initial Phase (MECO design, No Project X):  Exploit NOvA accelerator modifications and post-Run II availability of Accumulator and Debuncher rings to mount a  ->e conversion experiment patterned after MECO 4x10 20 protons in ~2 years Measure Single event sensitivity of R  e =2x % C.L. limit of R  e <6x ANY signal = Beyond Standard Model physics Ultimate goal  Exploit Project X and improved muon transport to achieve dramatically increased sensitivity If no signal: set limit R  e <1x If signal: measure target dependence, etc

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 3 Mu2e Collaboration Currently: 50 Scientists 11 Institutions *Co-contact persons R.M. Carey, K.R. Lynch, J.P. Miller*, B.L. Roberts Boston University W.J. Marciano, Y. Semertzidis, P. Yamin Brookhaven National Laboratory Yu.G. Kolomensky University of California, Berkeley C.M. Ankenbrandt, R.H. Bernstein, D. Bogert, S.J. Brice, D.R. Broemmelsiek,D.F. DeJongh, S. Geer, M.A. Martens, D.V. Neuffer, M. Popovic, E.J. Prebys*, R.E. Ray, H.B. White, K. Yonehara, C.Y. Yoshikawa Fermi National Accelerator Laboratory D. Dale, K.J. Keeter, J.L. Popp, E. Tatar Idaho State University P.T. Debevec, D.W. Hertzog, P. Kammel University of Illinois, Urbana-Champaign V. Lobashev Institute for Nuclear Research, Moscow, Russia D.M. Kawall, K.S. Kumar University of Massachusetts, Amherst R.J. Abrams, M.A.C. Cummings, R.P. Johnson, S.A. Kahn, S.A. Korenev, T.J. Roberts, R.C. Sah Muons, Inc. R.S. Holmes, P.A. Souder Syracuse University M.A. Bychkov, E.C. Dukes, E. Frlez, R.J. Hirosky, A.J. Norman, K.D. Paschke, D. Pocanic University of Virginia

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 4 Search for Charged Lepton Flavor Violation (CLFV) Standard Model rate via Dirac neutrino mixing is too small to be observed (~ ) Very common feature of Beyond Standard Model physics at much larger rates Similar to  e  with important advantages:  No combinatorial background  Sensitive to other types of BSM physics  Relative rate depends on details of physics  105 MeV e - The discovery of neutrino oscillations naturally raises the question:  What is the rate of charged lepton flavor violation in nature? CLFV is a powerful probe of multi-TeV scale dynamics: complementary to direct collider searches Among various possible CLFV modes, rare muon processes offer the best combination of new physics reach and experimental sensitivity Muon-to-Electron Conversion:  +N  e+N

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 5 Broadly Sensitive to New High Energy Dynamics ? ? ? Courtesy: A. de Gouvea At R  e ~ (first phase, this LOI), the sensitivity is already very compelling, well above the reach of colliders At (potentially, with upgraded apparatus and higher muon flux), energy scales probed would be difficult to access by other means Sindrum II MEGA

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 6 Specific Model Examples Examples with  >>1 (no  e  signal):  Leptoquarks  Z-prime  Compositeness  Heavy neutrino SU(5) GUT Supersymmetry:  << 1 Littlest Higgs:   1 Br(  e  ) Randall-Sundrum:   1 MEG mu2e R(  Ti  eTi) Br(  e  ) R(  Ti  eTi)

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 7 Previous muon decay/conversion limits (90% C.L.) Rate limited by need to veto prompt backgrounds!  >e Conversion: Sindrum II LFV  Decay: High energy tail of coherent Decay-in-orbit (DIO)

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 8 Mu2e (MECO) Philosophy Eliminate prompt beam backgrounds by using a primary beam with short proton pulses with separation on the order of a muon life time Design a transport channel to optimize the transport of right-sign, low momentum muons from the production target to the muon capture target. Design a detector to strongly suppress electrons from ordinary muon decays ~100 ns ~1.5  s Prompt backgrounds live window

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 9 Detector Layout

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 10 Beam Related Rates Cut ~700 ns after pulse to eliminate most serious prompt backgrounds.

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 11 Sensitivity R  e = gives 5 events for 4x10 20 protons on target 0.4 events background, half from out of time beam, assuming extinction  Half from tail of coherent decay in orbit  Half from prompt Coherent Decay-in-orbit, falls as (E e -E) 5

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 12 Mu2e History 1997  MECO proposed for the AGS at Brookhaven  Approved, along with KOPIO, as part of RSVP program  Design refined  Frequent favorable reviews 2005  June: final reviews, very positive Physics goals: HEPAP RSVP Subpanel Cost and schedule: “Wojcicki Panel”  July: RSVP cancelled for financial reasons MECO and KOPIO “charged” for entire cost of continued AGS operation  January: First informal meeting at BNL  September: First meeting at Fermilab 2007  June: Mu2e expression of interest submitted to Fermilab Directorate  August: First Mu2e collaboration meeting  October: Letter of Intent submitted to Directorate

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 13 Mu2e at Fermilab If the current suite of proton source upgrades is effective, there should be at least enough excess 8 GeV protons during the NOvA era to do an experiment with similar sensitivity to MECO in a reasonable amount of time.  The resonant operation of the 8 GeV Booster makes it impossible to directly generate the desired time structure.  There is a scheme to generate this time structure using the antiproton Accumulator and Debuncher rings, which will become available after the termination of the collider program.  This scheme requires only modest modifications beyond those planned for NOvA, with which it is fully compatible.

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 14 Available Protons: NOvA Timeline Roughly 6*(4x10 12 batch)/(1.33 s)*(2x10 7 s/year)=3.6x10 20 protons per year available MI uses 12 of 20 available Booster Batches per 1.33 second cycle Preloading for NOvA Available for 8 GeV program Recycler Recycler  MI transfer 15 Hz Booster cycles MI NuMI cycle (20/15 s)

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 15 Delivering Protons: “Boomerang” Scheme Deliver beam to Accumulator/Debuncher enclosure with minimal beam line modifications and no civil construction. Recycler (Main Injector Tunnel) MI-8 -> Recycler done for NOvA New switch magnet extraction to P150 (no need for kicker)

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 16 Present Operation of Debuncher/Accumulator Protons are accelerated to 120 GeV in Main Injector and extracted to pBar target pBars are collected and phase rotated in the “Debuncher” Transferred to the “Accumulator”, where they are cooled and stacked Not used for NOvA

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 17 Rebunching in Accumulator/Debuncher Momentum stack 6 Booster batches directly in Accumulator (i.e. reverse direction) Capture in 4 kV h=1 RF System. Transfer to Debuncher Phase Rotate with 40 kV h=1 RF in Debuncher Recapture with 200 kV h=4 RF system  t ~40 ns

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 18 Resonant Extraction Exploit 29/3 resonance Extraction septum and Lambertson similar to Main Injector  Septum: 80 kV/1cm x 3m  Lambertson+C magnet ~.8T x 3m

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 19 Beam Extinction Need Get at least ~10 -3 from beam bunching Remainder from AC Dipole in beam line Working with Osaka (FNAL+US-Japan funds) to develop AC dipole design, as well as explore measurement options

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 20 Proposed Location Requires new building. Minimal wetland issues. Can tie into facilities at MiniBooNE target hall.

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 21 Cost and Time Scale A detailed cost estimate of the MECO experiment had been done just before it was cancelled*  Solenoids and cryogenics: $58M  Remainder of experimental apparatus: $27M Additional Fermilab costs have not been worked out in detail, but are expected to be on the order of $10M. Hope to begin Accelerator work along with NOvA upgrades  ~2010 (or 2011 if Run II extended) Based on the original MECO proposal, we believe the experiment could be operational within five years from the start of significant funding  Driven by magnet construction.  ~2014 With the proposed beam delivery system, the experiment could collect the nominal 4x10 20 protons on target in about one to two years, with no impact on NOvA  NOvA rate limited by Main Injector * Costs in 2005 dollars, including contingency

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 22 Mu2e and Project X We have described the initial phase of mu2e, which is based on the proposed data sample of 4x10 20 protons.  90% C.L. limit of R  e <6x (improvement over existing limit of more than 4 orders of magnitude). The Project X linac would provide roughly a factor of ten increase in flux. Slow extraction directly from Recycler ruled out by Project X Working Group  Will need to load beam from Recycler to Accumulator as we are planning to do for Phase I A preliminary scheme to exploit this additional flux will be included in our proposal.

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 23 Mu2e and Muon Collider/Neutrino Factory There are a number of synergies between this project and muon cooling efforts  The Debuncher beam could be extracted in a single turn to produce the short, intense bunch needed by muon production experiments  Muon cooling studies have increased the understanding of solenoidal transport.  It is possible that a “helical cooling channel”, of the sort envisioned for muon cooling, could generate a significantly higher muon yield for this experiment. We will investigate these in more detail for the proposal. A combination of increased flux from Project X and a more efficient muon transport line could potentially result in a sensitivity as low as

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 24 Experimental Challenges for Increased Flux Achieve sufficient extinction of proton beam.  Current extinction goal directly driven by total protons Upgrade target and capture solenoid to handle higher proton rate Improve momentum resolution for the ~100 MeV electrons to reject high energy tails from ordinary DIO electrons. Operate with higher background levels. Manage high trigger rates  All of these efforts will benefit immensely from the knowledge and experience gained during the initial phase of the experiment. If we see a signal a lower flux, can use increased flux to study in detail  Precise measurement of R  e  Target dependence  Comparison with  e  rate

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 25 Required Resources for Proposal ~$100K of FESS time  for a preliminary cost estimate of the experimental facility and beam line civil construction ~1/2 FTE beam line design expert  to produce a preliminary design of the primary proton line, including extinction channel ~1/2 FTE of ES&H radiation safety expert  to help us produce a plan to deal with the increased flux in the pBar enclosure (VERY important!) ~1/2 FTE of a TD magnet expert  to evaluate the MECO magnet design, and advise of possible improvements. A dedicated postdoc and guest scientist position  Focus on Monte Carlo work.  Could also be supplemented with PPD resources

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 26 Conclusions The mu2e experiment is an opportunity for Fermilab to make an important measurement  In the initial phase (without project X) we would either Reduce the limit for R  e by more than four orders of magnitude (R  e <6x10 90% C.L.) OR Discover unambiguous proof of Beyond Standard Model physics This experiment benefits greatly from both the voluminous work done for the MECO proposal and by fortuitous configuration and availability of Fermilab accelerator components. With a combination of Project X and/or improved muon transport, we could either  Extend the limit by up to two orders of magnitude OR  Study the details of new physics

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 27 Backup Slides

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 28 Momentum Stacking Inject a newly accelerated Booster batch every 67 mS onto the low momentum orbit of the Accumulator The freshly injected batch is accelerated towards the core orbit where it is merged and debunched into the core orbit Momentum stack 3-6 Booster batches T<133ms T=134ms T=0 Energy 1 st batch is injected onto the injection orbit 1 st batch is accelerated to the core orbit T<66ms 2nd Batch is injected T=67ms 2 nd Batch is accelerated 3 rd Batch is injected

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 29 Rebunching Scheme Accumulator  Momentum stack 1 to 6 booster batches  Adiabatically bunch at h=1- 4kV 500ns gap for kicker Some beam/halo cleaning in Acc and transfer Adiabatic easier at  T =5.5  Transfer to Debuncher Debuncher  h=1 90-degree phase rotation at fixed voltage 40kV s  Capture and store at h=4 ~200 to 250 kV ~0.02s;   = 42ns Beam halo cleaning also ….

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 30 Attractive Features of Debuncher Large Acceptance Low chromaticity Long, dispersion-free segments Lots of open straight sections after cooling hardware removed Problem:  Getting protons there

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 31 Production Region Axially graded 5 T solenoid captures pions and muons, transporting them toward the stopping target Cu and W heat and radiation shield protects superconducting coils from effects of 50kW primary proton beam Superconducting coils Production Target Heat & Radiation Shield Proton Beam 5 T 2.5 T

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 32 Transport Solenoid Curved solenoid eliminates line-of-sight transport of photons and neutrons Curvature drift and collimators sign and momentum select beam dB/ds < 0 in the straight sections to avoid long transit time trajectories Collimators Curvature Drift 2.5 T 2.1 T

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 33 Detector Region 1 T 2 T Axially-graded field near stopping target to increase acceptance and reduce cosmic ray background Uniform field in spectrometer region to simplify momentum analysis Electron detectors downstream of target to reduce rates from  and neutrons Stopping Target Foils Straw Tracking Detector Electron Calorimeter

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 34 Expected Sensitivity of the MECO Experiment We expect ~ 5 signal events for 10 7 s (2800 hours) running if R  e = Contributions to the Signal RateFactor Running time (s)10 7 Proton flux (Hz) (50% duty factor, 740 kHz micropulse)4   entering transport solenoid / incident proton  stopping probability0.58  capture probability0.60 Fraction of  capture in detection time window 0.49 Electron trigger efficiency0.90 Fitting and selection criteria efficiency0.19 Detected events for R  e =

Fermilab PAC Review, Nov. 1-3, 2007 E Prebys 35 Expected Background in MECO Experiment We expect ~ 0.45 background events for 10 7 s running with sensitivity of ~ 5 signal events for R  e = SourceEventsComments  decay in orbit0.25 S/N = 20 for R  e = Tracking errors< Radiative  decay< Beam e - < 0.04  decay in flight< 0.03Without scattering in stopping target  decay in flight 0.04With scattering in stopping target  decay in flight< Radiative  capture0.07From out of time protons Radiative  capture0.001From late arriving pions Anti-proton induced0.007Mostly from   Cosmic ray induced0.004Assuming CR veto inefficiency Total Background0.45Assuming inter-bunch extinction