G. Maron, Agata Week, Orsay, January 2007 1 Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.

Slides:



Advertisements
Similar presentations
Prometeo Workshop on Front-end electronics for gamma and complementary detector systems 17 th -18 th November 2011 – IFIC (Valencia) Diego Barrientos.
Advertisements

CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
GNAM and OHP: Monitoring Tools for the ATLAS Experiment at LHC GNAM and OHP: Monitoring Tools for the ATLAS Experiment at LHC M. Della Pietra, P. Adragna,
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
CMS Michele Gulmini, CHEP2003, San Diego USA, March Run Control and Monitor System for the CMS Experiment Michele Gulmini CERN/EP – INFN Legnaro.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
CMS Michele Gulmini, Cern, DAQ Weekly 07/05/ RCMS – Plan of work Michele Gulmini DAQ Weekly 7th May 2002.
F. Lelli, Advanced Training Workshop on Instruments and Sensors on the Grid,Trieste, April 25, 2007 Instrument Elements at Work Imperial Brunel Elettra.
The Run Control and Monitoring System of the CMS Experiment Presented by Andrea Petrucci INFN, Laboratori Nazionali di Legnaro, Italy On behalf of the.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
CMS Luigi Zangrando, Cern, 05/03/ RCMS for XDaq based small DAQ Systems M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
C. Combaret 14 jan 2010 SDHCAL DAQ status in lyon C. Combaret, for the IPNL team.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Introduction to UniDAQ Makoto Yoshida (Osaka Univ.) MICE DAQ 2005/9/1.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
ALICE, ATLAS, CMS & LHCb joint workshop on
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
DDM Monitoring David Cameron Pedro Salgado Ricardo Rocha.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
Incorporating Scientific Instruments into the Grid Francesco Lelli University of Lugano F. Lelli, Incorporating Scientific Instruments into.
Gaetano Maron, CPT week, CERN, 18 April Run Control and Conditions DB CMS CPT Week, CERN 18 April 2002 G. Maron INFN – Laboratori Nazionali di Legnaro.
A simple Desktop DAQ for U2F readout Ulf jörnmark Physics Dept. Lund Status and plans.
Gaetano Maron, CPT week, CERN, 16 April RCS Discussion.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
DAQ Andrea Petrucci 6 May 2008 – CMS-UCSD meeting OUTLINE Introduction SCX Setup Run Control Current Status of the Tests Summary.
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
Monitoring Update David Lawrence, JLab Feb. 20, /20/14Online Monitoring Update -- David Lawrence1.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
TBPM Front-End Software Design Review L.Piccoli April
NEDA collaboration meeting Neutron and light charged particle detector-arrays as complementary detectors for the future European large gamma-arrays AGATA,
1 Run Control and Slow Control Agata EDAQ Meeting Legnaro, 19/02/2009.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Towards new Graphical User Interfaces for nTOF experiment Collaboration meeting, Bologna 28 th Nov 2013 Towards new Graphical User Interfaces for nTOF.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: Implementation Plan.
OATS - An Example of LCOD Organic Aerosol Thermal desorption chemical ionization mass Spectrometer David Thomson NOAA Aeronomy Lab October 19, 2006 ALARM.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
TBPM Front-End Software Design Review
Online Control Program: a summary of recent discussions
GFA Controls IT Alain Bertrand
Controlling a large CPU farm using industrial tools
RCMS Structure RCMS Security UserDB Service Resource ConfDB
RCMS Internet - Intranet UI 9-1.
M. Gulmini, G, Maron, N. Toniolo, L. Zangrando
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
Presentation transcript:

G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro

G. Maron, Agata Week, Orsay, January General Overview Run Control and Monitor System Slow Control Event Builder Tracking Storage Pulse Shape Analysis Front-end electronic and pre-processing Data Readout Front-end electronic Trigger Agata Data Flow Ancillary Data Flow

G. Maron, Agata Week, Orsay, January Run Control Main Tasks Access to the Agata data acquisition system (login) Configure the daq –Select the partition to run (i.e. a gts partition, enable/disable ancillary, etc.) –Run multiple partition (e.g. calibration mode) Synchronize other sub-system (e.g. slow control, trigger, ancillary, etc.) to be configured Control the overall system (e.g. start, stop, etc.) Handle all the information (e.g. generic log) and error/state messages –Show (e.g. alarms) –Archive (history) –Handle the error in some automatic way (e.g. expert system) to help to fix malfunctioning Monitor the DAQ (e.g. data rate, error rate, etc) Provide access to the GUIs Provide tools to help the cooperation for people in shift (e.g. logbook, chat, videoconference, etc.)

G. Maron, Agata Week, Orsay, January Slow Control Main Tasks Main Slow Controlled Components –Agata Global Trigger –Agata Front End Electronics –Agata Pre-Processing –Ancillary Front End Electronics –... Slow Control main tasks –Store (DB) hardware configurations –Load a given configuration –Monitor the component –Handle error/alarm events and pass them to the Run Control

G. Maron, Agata Week, Orsay, January Slow Control and Run Control (Slow) Controlled Component Configuration DB Slow Controller GUI Standalone System RUN CONTROL Get State Configuration to load Errors Values to monitor

G. Maron, Agata Week, Orsay, January GUI Front-end electronic and pre-processing Pulse Shape Analysis Event Builder Tracking Storage Control Information/errors Monitor Ancillary Slow Cntr GUI Resource Service Login Service Info / Moni Service (IMS) Top Instrument Manager.(IM) Run Control Problem Solver IM. Controls, Errors and Monitors: the “hooks” of the Sub-Systems

G. Maron, Agata Week, Orsay, January “Hooks” definition General –The sub-systems hooks should be an interface as much as possible homogeneous between the different systems. This help the task of the top IM. –Some effort should be put in this phase to define these interfaces Hooks –Controls Send commands and receives back a status Set and get parameters –Errors Send log information and errors. Errors are sent asynchronously –Monitor A publish/subscribe mechanism should be used to select the variables to monitor

G. Maron, Agata Week, Orsay, January Monitor Hooks Daq application e.g. Data Readout V1 V2 V3 1. Publish the variables that can be published (defined at the code level of the application) 2. Brows the variables you want to monitor (e.g. Data rate) 3. Get the selected variables (e.g. Data rate every 2 seconds) e.g. V1 = Data Rate V2 = Error Rate V3 = Buffer Occupancy

G. Maron, Agata Week, Orsay, January Every DAQ node should have the monitor hooks Monitor Collector nodes should be defined in order to have summary views of the sub-system of part of it Daq application V1 V2 V3 Daq application V1 V2 V3 Daq application V1 V2 V3 Daq application V1 V2 V3 Monitor Collector V4 V5 V6 Monitor Subscribers Monitor Subscribers

G. Maron, Agata Week, Orsay, January Top IM GUI Services Services PSA Chf d’Or EVB Chf d’Or Tracking Chf d’Or Storage IM SlwCtrl IM EVB Sub- System Storage Sub- System PSA Sub-System Tracking Sub-System SlowCtrl Sub- System Maestro IM = Function Manager Web Services Resource Service Log Collector Error Collector ….. Ancillary IM Ancillary Sub- System Narval Systems