Goals 1.Reduce inventory 25% 2.Improve productivity 25% 3.Create Standard Operations September 15- 19, 2005 Quality Control Lab Kaizen Event.

Slides:



Advertisements
Similar presentations
Service Process Improvement
Advertisements

Supplier Development Kaizen Implementation Kit
CSUN Engineering Management Six Sigma Quality Engineering Week 4 Measure Phase.
IMPROVE Phase Consider these Improvement Initiatives! Six Sigma Simplicity.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Six Sigma Quality Engineering
Lean Six Sigma: A Vision
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Monitoring the Project
Premium Reduction & Delivery Improvement
Six Sigma What is Six Sigma?
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Chapter 1 Enterprise Wide View.
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
Black Belt Level DMAIC Certification Checklist
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Greater Cincinnati Lean Improvement Consortium
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
LeanSigma® Fundamentals
Visual Management Quick Review
Lean Manufacturing Chapter 15 pp June 29, 2012.
Paper Cutting Exercise
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Gage Repeatability and Reproducibility (R&R) Studies
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Energy efficiency and reliability First year project rev AH BEE GOH 19 MARCH April 2011.
© 2002 Six Sigma Academy0 Define Point one Point two Point three Increase Market Share.
1 LSSG Green Belt Training Improve: How do we get there?
Project Selection Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.
Yellow Belt Training 10 Step Kaizen Process
© 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Chapter 15 Lean Operations in Services.
Kaizen Event Flow Kaizen Facilitation Project Management.
TM 1 ©The McGraw/Hill Companies, Inc.,2006McGraw/Hill Each Appraiser vs Standard Assessment Agreement Appraiser # Inspected # Matched Percent (%) 95.0%
Assets Returned From Lease Project: Bill Cody Black Belt Week 3 Report Out.
Reduction of Disputed Late Charges Fred Williams, BB Corporate CI Group March 18, 2004.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
DIMAC 12/2/2003Six Sigma Green Belt (Ref: The Six Sigma Way Team Fieldbook)1 Measurement and Analysis Interaction (A1) Measure Hypothesize stratification.
OPERATIONS & TECHNOLOGY MANAGEMENT (JMP 5023) MANAGING QUALITY & SIX SIGMA.
6 - 1© 2014 Pearson Education, Inc. Managing Quality PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
General Guidelines for this Template Add the letter of the stage (DMAIC) you are in on EACH SLIDE. Don’t feel like you have to use the tools at the end.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
DSQR Training Attribute MSA
TM 720: Statistical Process Control DMAIC Problem Solving
The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
Control Phase Wrap Up and Action Items
Enterprise / Production System Interface Expand Internally/Externally
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
Lean Healthcare Deployment and Sustainability Ch
and its applications to improve animal welfare during transportation
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Lean Tools & Approaches
EMBA 8355 Satish Nargundkar
Lean Tools & Approaches
Measure Phase Wrap Up and Action Items
Lean Six Sigma Green Belt
Lean Tools & Approaches
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Goals 1.Reduce inventory 25% 2.Improve productivity 25% 3.Create Standard Operations September , 2005 Quality Control Lab Kaizen Event

Baseline Metric: People Flow 320 ft worth of movement !!

Takt Time Chart Takt Time = 620 minutes = 525 seconds 71 Tests

Trial Setup Denier Coherency Instron T.S. WIP Material Flow Exit Operator One Operator Two Operator 3

New Cellular Layout Before Layout

Summary of Achievement MeasureBeforeAfterImprovement Operators per Shift 5420% Inventory % Movement per Test 320 ft60 ft81% Tests per Shift % Equipment Used % Material Flow Intersecting, colliding One direction, flow Goal is 71

Trial Results Computer issues disrupt ability to meet Takt Time TAKT TIME

Six Sigma: Reducing Variation Network too slow Re-Test procedure causing extra tests Eliminated unnecessary test Mistake-proofed sample log screens Coached adherence to standard operations across all four shifts Separated log screens to minimize file open/close time Achieved Target of 71 Tests!

Sigma Kaizen Event Reduce Fray Defects by 50% March 28 – April 2, 2005

Define and Measure Charter Defined defect as broken filament High level process map Detailed Quality Map Gage R & R on measurement systems Fish bone diagram to determine cause and effect Difficulty impact matrix Process Capability Comparative Analysis

Visual Inspection Gage R & R Results Within Appraisers Assessment Agreement Appraiser # Inspected # Matched Percent 95 % CI Brenda (60.03, 90.72) Vic (53.25, 86.25) Chris (53.25, 86.25) Katrina (56.60, 88.54) Edgar (56.60, 88.54) Sue (16.12, 50.01) # Matched: Appraiser agrees with him/herself across trials Repeatability Goal should be > 90% correct decisions! Between Appraisers Assessment Agreement # Inspected # Matched Percent 95 % CI (9.28, 39.97) # Matched: All appraisers' assessments agree with each other. Reproducibility

Visual Inspection Gage R & R Results No operators met the gage R&R goal of 90% Visual expert was only 62% repeatable! Completed parallel study using automated defect counter Gage results met 90% goal Through MSA, determined good product was labeled defective.

DMAIC at Kaizen Speed Project Charter to Implementation completed in 6 weeks! Kaizen Team process helps buy-in and sustainment Improved yield 2.5%! Traditional Black Belt Project Kaizen 9 to 12 months 6 weeks