Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov 2010 - Cavity WG.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
ESS cavities interfaces
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Mechanical issues SPL cavities/cryomodules: Objectives V.Parma Mini-workshop on Mechanical issues SPL cavities/cryo-modules, CERN 30th September 2009.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Longitudinal HOM damping estimations for SPL cavity. status W. Weingarten 26 July 20101SPL Cavity WG Meeting.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
JRA1 – SRF report CARE Steering Committee meeting,
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Lutz Lilje DESY -MPY- SCRF Infrastructure at CERN? Electron Accelerator R&D for the Energy Frontier Lutz Lilje DESY –MPY-
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
Report from WG2 (cavity) and objectives of the meeting W. Weingarten / CERN 3 rd SPL Collaboration Meeting CERN 11 – 13 Nov /Nov/2009 W. Weingarten13rd.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
LASA status for medium-beta cavity Paolo Michelato.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ELENA installation progress F. Butin / ELENA collaboration.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
WP High Beta Cavities Delivery
CERN – Zanon discussions
WP5 Elliptical cavities
Crab Cavities Contribution from the U.S.
T5.2: Harmonization - Material and Component Reference
Complementary ISTC Projects #3888, 3889p
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
WG-1 Session Cavity Performance Cryomodule Performance
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Superconducting RF Crab Cavities
HIE-LINAC status report
Nick Walker (DESY) EU GDE Meeting Oxford
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG

Recent organisational developments W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG2  CERN management had the SPL – study approved and allocated resources in the Medium Term Plan  This fact allowed us to establish an ambitious but achievable planning with the aim to test a fully equipped (short) cryo-module in mid 2013  CERN is now member of the TTC (TESLA Technical Collaboration) and more specifically in its Proton Accelerator Working Group  CERN prepared participation in the recent FP7 “CRISP”*) proposal to the EU (SPL cavities diagnostics and SRF staff training linked with XFEL, ESS, DESY)  TRIUMF withdrew from the SPL collaboration  *) Cluster of Research Infrastructures for Synergies in Physics

Recent technical achievements 1 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG3  HOM damping requirements  From the beam stability point of view, a damping corresponding to Q ext < 10 5 is recommended, if all possible chopping schemes shall be coped with.  The previous requirement of Q ext < 10 4, valid for resonant excitation of HOMs, corresponding to a maximum extracted RF power less than 100 W, can be avoided by tuning the resonant frequency of the specific HOM.

Recent technical achievements 2 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG4  Power coupler We are within the construction process, and not so much more to report right now… ‘Clean room lines’ identified Design stage completed Raw material ordered Prototyping underway Machining has started March 2011: ‘vacuum lines’ 4 SPL-LHC couplers 4 SPL-SPS couplers 8 Double walled tubes 4 tests cavities April 2011 : Assembly of 2 x 4 couplers in DESY facilities June 2011 : RF power Tests at CEA

Recent technical achievements 3 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG5  Electro-polishing equipment Top interface Bottom interface Still missing... Main equipment Cathode(s)

Recent technical achievements 4 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG6  Diagnostics  Required equipment defined 6 Camera Temperature sensor strips Photodiodes & temperature sensors

Recent technical achievements 5 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG7  Clean work & post mortem inspection  Upgrade proposal and cost estimation for cleean room finished;  attention: useful space < 13 m Outer working place Personnel access, with air shower Class Class 100 Ionized air shower Class 10 Control room Air supplier Baldaquin 1 Class 100 Baldaquin 1 Class 100 Cleaning & rinsing room Class 100 HPR system UPW production Baldaquin 2 Storage area Class 100 Baldaquin 2 Storage area Class 100

Recent technical achievements 6 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG8  Mechanical issues  A lot of coordination work needed – “copy-paste solution are an illusion” – still some mechanical tests at cryogenic temperatures to be understood (Ti - Cu gasket – SS flange) – interfaces is an issue – stainless steel tank could be the baseline for the future – Nb procurement underway – cavity manufacture market survey launched – Ti/Nb welding preferred wrt Nb/NbTi/Ti – manufacture and treatment sequence defined (including 800 °C annealing) – manufacturing by industry foreseen Feb delivery end 2011

Recent technical achievements 7 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG9  Mechanical issues  Magnetic shielding:  active shielding discarded  conclusion achieved on design proposal

Recent technical achievements 8 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG10  HOM coupler design  CERN-Saclay-Rostock hook coupler vs. band stop filter coupler

Recent technical achievements 9 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG11  Other issues and outlook for future work  Necessity of taper in cavity string  FM coupling only weakly sensitive to taper  HOM coupling increases without taper  To be balanced against increased impact energy of field emitted electron current  HIPIMS  coating with ions preferred First sample coated yesterday by biased HIPIMS, for RF test with the quadrupole resonator

Recent technical achievements 10 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG12  News from partner institutes  CEA – Saclay  Fabrication of tuners started  Design of tank completed, drawings & specs in progress  High power RF tests are going on in the frame of the SLHC-PP program ; processing of new couplers from CERN will follow  Impressive new SRF processing and assembly area Assembly and alignment workstationCavity string in front of the CEA-Saclay CR

Recent technical achievements 11 W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG13 15 th Oct ’10: CERN-CEA-CNRS major decision  Beta=1 and Beta=0.65 cavities will be tested in CRYHOLAB only!  Helium vessel design: free from CERN cryomodule requests 15 th Oct ’10: CERN-CEA-CNRS major decision  Beta=1 and Beta=0.65 cavities will be tested in CRYHOLAB only!  Helium vessel design: free from CERN cryomodule requests Final design News from partner institutes – CNRS - Orsay

Open issues for guiding future work W. Weingarten5th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG14  Fine tuning of planning with external partners: