Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850) 245-8555

Slides:



Advertisements
Similar presentations
Mercury and PCBs TMDL Implementation Tom Mumley San Francisco Bay Regional Water Quality Control Board.
Advertisements

What are TMDLs? and What Might They Mean to MS4 Permittees?
Fecal Coliform “Hot Spots” Monitoring Stacie Greco Senior Environmental Specialist Alachua County Environmental Protection Department.
The Lake Allegan/Kalamazoo River Total Maximum Daily Load (TMDL) Plan Implementation by Jeff Spoelstra, Coordinator, Kalamazoo River Watershed Council.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Nutrient Trading Framework in the Coosa Basin Alabama Water Resources Conference September 6, 2012 A Feasibility Study of Nutrient Trading in Support of.
The New York City Watershed Agreement “A commitment to Partnership”
Water Quality Credit Trading Florida League of Cities 2013 Annual Meeting.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
Imperial River: Water Quality Status and Basin Management Action Plan.
Lee County Government Division of Natural Resources TMDL/BMAP Update TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Allen Berthold Texas Water Resources Institute. Review: Clean Water Act Goal of CWA is to restore and maintain water quality suitable for the “protection.
Florida Department of Environmental Protection Watershed Assessment 2015 Strategic Monitoring in the Florida Keys DEAR- Water Quality Assessment Program.
Tom Singleton Associate VP, Director, Integrated Water Resources an Atkins company Linking TMDLs & Environmental Restoration.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
State Approaches to Funding Local Projects A Survey of RFPs The State/EPA NPS Partnership New Orleans, November 27, 2001.
Grand Haven Pond Study: An Investigation to Reduce Nutrient Loads and Evaluate Alternative Management Practices in Stormwater Ponds Mark Clark Wetlands.
Implementing the Municipal Separate Storm Sewer System Permit Stormwater Division General Services Department Board of Supervisors Work Session October.
Source Water Protection Plans A case study of the Ross Barnett Reservoir in Central MS.
Total Maximum Daily Loads in MS4 Storm Water Programs.
West Metro Water Alliance A Path to Clean Water – Understanding TMDLs and Watershed Planning September 21, 2011 Diane Spector Wenck Associates, Inc.
YOUR SCHOOL AND YOUR WATERSHED LORNA ROSENBERG- US EPA MID-ATLANTIC OCT 1-2, 2014 CHESAPEAKE BAY SCHOOLS WORKSHOP – SHEPHERDSTOWN, WVA.
Executive Committee Meeting February 27, Year Assessment Report Overview This is the fifth annual report on the basin management action plan (BMAP)
1 “ Understanding the Local Role of Improving Water Quality” Virginia Association of Counties November 14, 2011 Virginia Association of Counties November.
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Chesapeake Bay Policy Committee Meeting Bay Program Water Quality Goals: Focus on Funding Presented to COG Board of Directors September 10, 2003.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Total Maximum Daily Load (TMDL) Program Status Update and Needs Assessment Presented by the Environmental Protection Division March 18, 2008.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
What is the Chesapeake Bay TMDL? Total Maximum Daily Load –Amount of pollutants that a water body can receive and still support designated uses Drinking,
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Stormwater… Problems & Solutions Jim Nash. A water resources commissioner Then… Unique to Michigan Initially cleared swamps and marshes Each township.
Upper Ocklawaha River DRAFT Basin Management Action Plan For the Implementation of Total Maximum Daily Loads (TMDLs) Adopted by the Florida Department.
Update on Chesapeake Bay Program Developments Briefing to the Water Resources Technical Committee January 8, 2009 Briefing to the Water Resources Technical.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Latest Developments - Effectiveness Assessment and Research Priorities Geoff Brosseau California Stormwater Quality Association (CASQA) December 4, 2007.
Lake Jesup BMAP Adoption Environmental Protection Division February 23, 2010.
2004 Tributary Strategies: Assessment of Implementation Options Steve Bieber Water Resources Program Presented at: COG Chesapeake Bay Policy Committee.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Nutrient Effects on Springs Biota Synthesis: Springs Management and Research Needs Mark Brown & Richard Hamann.
Total Maximum Daily Load (TMDL) Program Lake Jesup Basin Management Action Plan (BMAP) Environmental Protection Division September 1, 2009.
Introduction to Water Quality Trading National Forum On Water Quality Trading July 22-23, 2003 Chicago, Illinois.
AN INTRODUCTION TO STORMWATER AND STORMWATER MANAGEMENT Eric H. Livingston Bureau of Watershed Management Florida Dept. of Env. Protection Tallahassee,
Overview of the Total Maximum Daily Load Program.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
BMAP Forward & Septic Tanks 2012 Environmental Symposium John P. Pappas, P.E. Department of Public Works.
St. Johns County Water Quality Program Update March 15,
1975 EPA Study  Extensive construction in 1950s -1970s  Poor canal flushing results in “stagnation, putrification, and excessive nutrient enrichment.
Protecting Georgia’s Waters Jennifer Welte Program Manager Regulatory Development & Regional Water Planning Georgia EPD – Watershed Protection Branch.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
Improving Local Water Quality in Pennsylvania and Restoring the Chesapeake Bay.
TMDL Implementation: Now What?
New York’s Chesapeake Bay WIP
Mulberry Watershed Management Plan
Water Quality Restoration Challenges
Water Quality Trading Advisory Committee MDA Headquarters
What is a Watershed Implementation Plan?
Water Quality Trading Advisory Committee MDA Headquarters
Water Infrastructure Funding and Update on the Amendment I Lawsuit
High Rock Lake TMDL Development
Presentation transcript:

Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)

Provides: Quantitative restoration targets Identification of pollutant sources Regulatory “backstop” Application of good science to management Total Maximum Daily Loads Basin Management Action Plans (BMAPs) implement TMDLs Water quality targets needed to return a waterbody to a healthy state

BMAP Waterbodies Newnans, Orange, Wauberg, & Alachua Sink: Nutrients Hogtown, Tumblin, & Sweetwater: Bacteria ______________ Related Waterbodies Hatchet Creek: Iron, natural condition Lochloosa: Elevated nutrients, TMDL on hold

Developed by stakeholders; guidance from DEP Adopted by DEP Secretarial Order Linked directly to municipal stormwater and GRU wastewater permits Linked to best management practices and education for nonpoint sources (e.g. agriculture) Evaluated annually; revised every five years BMAP Basics

BMAP Stakeholders ( ) EPD Public Works Health Dept. EPAC Others Public Works Water Mgmt. Comm. Others Sustainable Alachua County & Other Forestry Representatives Women for Wise Growth & others… Gainesville Clean Water Partnership

Key Parts of the BMAP Document Refined source identification Management actions (projects) Focused studies (good science) Funding Monitoring & project tracking Commitments Follow-up and plan revision

Improved scientific understanding (nutrients and bacteria) Developed new projects to address TMDLs, including cooperative efforts Expanded the scope of existing projects Began implementing projects to address known issues Identified additional studies to refine source understanding BMAP Development

Many unknowns remain in this watershed (e.g. lake nutrient sources) Thus, the Orange Creek BMAP does not lay out all necessary actions to achieve TMDLs Significant restoration efforts are underway to address known sources Additional projects will be implemented as the scientific understanding matures Working With Uncertainty Application of Good Science Wise Use of Resources

Stormwater retrofits Wastewater infrastructure management Pollution prevention Agricultural and municipal BMP implementation Land use planning and land development Public education BMAP Projects The BMAP contains over 100 activities that address bacteria and nutrient sources

Extensive water quality sampling and microbial source tracking (GRU & Alachua County) completed to identify hot spots “Hot Spots” addressed geographically Pilot = Elizabeth Creek Bacteria “Hot Spot” Project GRU = sewerACEPD = monitoring G’ville = stormwaterDEP = Data collection & evaluation ACHD = septic tanks

Paynes Prairie/Sweetwater Branch Sheetflow Restoration Feasibility study completed Constructed water quality treatment area Rehydrate existing wetlands Remove direct discharge to Floridan aquifer Will help meet TN reductions identified in TMDL Steps needed for project to proceed Funding commitments Land acquisition Project design

BMAP identifies specific studies and monitoring needed to guide management Studies Underway and Planned Microbial source tracking In-stream bioassessments Storm event nutrient assessments Stormwater inlet protection pilot project Reclaimed water master plan

Approx. $200M in projects completed or in progress for the Orange Creek BMAP area Detailed Studies Restoration Projects Directed Public Education Agricultural BMPs Land Acquisition Stormwater Permit Program Stormwater BMPs Wastewater Infrastructure Mgmt. BMAP Implementation Cost $14M in broader actions/ programs emphasized in BMAP areas Costs not estimated for most future projects (not adopted)

Once adopted by DEP, the BMAP is legally binding for responsible parties through Watershed Restoration Act and stormwater permit program Local commitments are needed before DEP will adopt the BMAP Government and non-government Working Group members signing statements of commitment Commitment to Plan Implementation

Recommended Action Adopt Resolution 07-xxx A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ALACHUA COUNTY, FLORIDA, TO SUPPORT AND WORK ON THE IMPLEMENTATION OF THE ORANGE CREEK BASIN MANAGEMENT ACTION PLAN