CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.

Slides:



Advertisements
Similar presentations
“Words” Do Matter in Public Works Contracts
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
MASBO February Information to purchase Services Information to purchase Construction.
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ISTISNA’.
Contracts – important issues
Procurement Management
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
Chapter18 Contract Construction 1CE 417, King Saud University.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Price Undertakings Under U.S. Antidumping Duty Law Prepared by Import Administration, U.S. Department of Commerce for the June 2 nd Korea Trade Commission’s.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Darren R. Krattli Eisenhower Carlson PLLC Mechanics’ and Materialmen’s Liens: Start to Finish RCW Main: (253) Direct: (253)
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
PROCEDURES FOR SELECTING THE CONTRACTOR
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
Construction Engineering 221 Contracts & Contractor Procurement.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Changes To California’s Mechanic’s Lien Laws: Effective January 1, 2012 and July 1, 2012 Hanson Bridgett LLP.
CONSTRUCTION ADMINISTRATION Changes and Extra Work in Construction Management Dr. Alaattin Kanoğlu Spring, 2013 Professonal Practice Management I.B.U.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
CONSTRUCTION CONTRACTS – MASTER CHART
Thou Shall It’s Appealing For Short Takin’ Care of Business Odds & Ends
4/28/2003CVEN Maxwell 1 Job Site Issues Module October 14, 2015.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
King Fahd University of Petroleum & Minerals
Rabbanai T. Morgan Chief, Contingency Contracting 26 May 2005 Commercial Contract Financing.
1 18 International Payments and Related Issues. Summary: 18.1 Payment Currency Clauses Mobilization and Progress Payments Insurance Issues.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID# PREPARED FOR Dr. ABDULAZIZ BUBSHAIT.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Chapter 15 Payments. Payments typically made monthly. Retainage typically withheld (5% - 10%) Project payment: –series of periodic payments –single final.
CONSTRUCTION ADMINISTRATION Claims and Disputes Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
Joint Venture Agreements. Joint Ventures Joint Venture (JV) : Two or more construction contractors jointly competing for a particular project pooling.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
And other issues. The General Contract Form is included in every solicitation requiring insurance. The general requirements of the contract.
CHANGE WORK ORDER A change work order may be issued by implementing official any increase or decrease in quantities of original work items in the contract.
ASC (FAS 146) SFAS No Accounting for Costs Associated with Exit or Disposal Activities — requires companies to recognize costs associated.
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
Mike Ellis Executive Director – Property + Projects
ISO/IEC
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
(Additional materials)
Commercial Contract Financing
Construction Operation
ARCH 435 PROJECT MANAGEMENT
Presentation transcript:

CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program ARCH472

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS2 Outline Authority and responsibility of all parties Opening a project Administrative activities Suspension or termination of the work

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS3 Authority and responsibility of parties Depending upon the type of contract the owner may be authorized: to award other contracts in connection with the same work, to require contract bonds from the contractor, to approve the surety proposed, to retain a specific portion of the contractor’s monthly progress payments,

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS4 Authority and responsibility of parties to make changes in the work, to carry out portions of the work with the owner’s own forces in case of contractor default or neglect, to withold payments from the contractor for adequate cause, and to terminate the contract for cause.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS5 Authority and responsibility of parties The right of the owner: to inspect the work as it progresses, to direct the contractor to expedite the work, to use completed portions of the work before contract completion, and to make payment deductions for incomplete or faulty work, are also common contractual provisions.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS6 Opening a project Opening a project requires many details to be completed before the contractor even moves a single piece of equipment onto the project site.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS7 Opening a project Immediately after award of the contract, the contractor is expected: to make arrangements for the required policies of insurance, to obtain permits, to order long-lead purchase items, to check the site to determine the availability of storage and work staging areas, to make arrangements for off-site disposal of surplus or waste materials, and to take care of numerous other tasks.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS8 Opening a project It is desirable for the owner, either directly or through the design firm or construction manager, to issue a written Notice to Proceed to the contractor, which will designate the actual beginning of the contract.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS9 Opening a project This is important when attempting to establish the amount of Liquidated Damages where the contractor has exceed the contract time. The Notice of Award can not serve as a valid Notice to Proceed, as no contract will have been executed between the owner and the contractor at that time. The notice to proceed sets a precise date that the job began and eliminates any later argument over the time of the contract.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS10 Suspension or termination of the work Work may be suspended in whole or in part, and the nature of a suspension is to cease all or part of the work without actual contract termination. The owner may order the contractor in writing to suspend, delay, or interrup all or part of the work. However, if the work is delayed or suspended for a longer period than specified, the contractor may claim an adjustment in price for delay damages as well as additional time.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS11 Suspension or termination of the work Motives for suspension of the work vary. The owner may have budgetary limits and decide to stop work in certain areas or work may be suspended due to bankruptcy of the contractor.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS12 Suspension or termination of the work Some contract documents contains provisions allowing the owner to discontinue all or any part of the work being done by a contractor. Such termination may be for reasons such as abondoning the work, bankruptcy or insolvency, unnecessary delay of the work.