Invensys and the Invensys logo are trade marks of Invensys plc 17 October, 2015 Invensys proprietary & confidential Slide 1.

Slides:



Advertisements
Similar presentations
Delivering solutions Applying the Future Today - Intelligent Transport Systems (ITS) Presentation by Dr Adrian Withill Technical Director - WSP.
Advertisements

Platform Screen Door SAI SYNERGY (India)
© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
Functional Workshop / Training Part 2 Pick Lists
Overview What is the National ITS Architecture? User Services
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
CBTC from the start: 28 years of SkyTrain in Vancouver
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
Managing Human Factors in Hong Kong through a Risk-based Approach
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
Streamlining rail operations with RFID Jarkko Miettinen Vice President of Sales, Confidex Radio frequency identification in rail operations.
DEPARTMENT OBJECTIVES 1. To Identify and deploy information technology to meet business objective at CKPL. 2.To Provide support to users for systems usage.
Russia – EU seminar on rail transport research, October
Express Rail Link The First Operational TETRA System for Rail in the World Dr. Aminuddin Adnan CEO Express Rail Link Sdn Bhd 18 May st Malaysian.
Application of Integrated Management Systems (IMS) in Hong Kong (HK) Presenter: Dr. Linda C.N. Fan Department of Building & Real Estate, The Hong Kong.
Railway Safety Plan and Its Status in Korea
Downtown Seattle Transit Tunnel (DSTT)
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
Transport presentation October An integrated railway solutions provider Sales 4.9 B Euros Orders received 4.7 B Euros Employees Market Share.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
4 Incident Command System. 4 Objectives (1 of 2) Describe the characteristics of the incident command system (ICS). Explain the organization of the ICS.
© 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
New Satellite-based Solutions for Train Control Systems
UPM TRANSPORT RESEARCH GROUPS UNIVERSIDAD POLITECNICA DE MADRID SPAIN
Title: Railway Safety Plan in Korea Name: Sanglog Kwak, Sungbae Yoon, Kwanghag Choi Organisation: MLTM, KRRI Economy: Republic of Korea Thirty Fourth APEC.
Overview System modelling and holistic simulation :
Enhancing ERP System with RFID: Logistic Process Integration and Exception Handling Dickson K. W. CHIU Senior Member, IEEE Eleanna Kafeza Athens University.
THNS 2010 Open supervision platforms for smart and sustainable cities, Yves PERREAL, Strategic studies Director, THALES.
Traffic Management System And Passenger Information System Western Railway Experience.
ANSALDO: BACKGROUND experience in dependable Signalling Automation Systems experience in dependable Management Automation Systems experience in installation,
ARRC Collision Avoidance System
ERTMS state of the art and evolution of the applications considering customer’s orientations.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
THE Reference in Traffic Video Detection Benjamin Schiereck, Sales Manger Traficon Germany Improving road and tunnel safety via incident management: implementing.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
TETRA IN A MASS RAPID TRANSIT ENVIRONMENT (Singapore)
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
ETCS Level 2 Operational Concept in Austria
Nursing Home Incident Command System
RESTRAIL Final Conference Lessons Learned from WP4 – Mitigation of Consequences Gilad Rafaeli, MTRS3,
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Peter Gurník, Oldřich Trégl Satellite based train location.
Flexible, Modular Interlocking Systems for a modern railway network
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
ISO17799 Maturity. Confidentiality Confidentiality relates to the protection of sensitive data from unauthorized use and distribution. Examples include:
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
European Commission 1 Directorate General for Energy and Transport Discussion for a co-ordinated trans-European Deployment Plan for ERTMS 15 June 2004.
Visual 2.1 G191: ICS/EOC Interface Workshop Unit 2: Incident Command System (ICS) Review.
Signalling: Convergence of needs
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE.
Transportation Systems IREE Conference, Delhi, India 26 July 2014 “ Using Communication-Based Train Control to Improve the Efficiency of Metro Railway.
1FK/WSMAY2000 European Commission Information Society DG FROM THE 4TH TO THE 5TH FP Fotis Karamitsos European Commission DG INFSO/B/5.
To Create a Better Life through Green Network ERTMS Application in Korean Railroad
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
Data Enabled Railway July 2015 Railway Suppliers Summer Conference 2015 Steve Warner, EMEAR Head of Data & Analytics.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
IRSC 2005 Cape Town - South Africa 9 – 14 october 2005
Communications in Railway Centralized Traffic Control Systems
The Implementation Experience of CTCS-3 Train Control System and the Implication of “Go Global” of China High-speed Railway Good morning. October 2017.
Emergency Radio Services SchoolSAFE Communications
CORPORATE PROFILE JUNE 2016
Communications System for Railway
COMMUNICATION SOLUTIONS
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
TS2 PSS Architecture, Concepts of Operations and Interfaces
Presentation transcript:

Invensys and the Invensys logo are trade marks of Invensys plc 17 October, 2015 Invensys proprietary & confidential Slide 1

© 2009 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys or its subsidiaries. All third party trademarks and service marks are the proprietary marks of their respective owners. © Invensys 17 October, 2015Invensys proprietary & confidential 2 The future of Railway Operations - The importance of Operational Control Centres (OCC) Luis González Cepeda Invensys Rail Dimetronic 3 March, 2011

© Invensys 17 October, 2015Invensys proprietary & confidential 3 Index 1.Traditional approach to designing railway control systems 2.Reasons for higher levels of railway automation 3.Benefits of an Integrated systems engineering approach 4.Some examples – Madrid, Hong Kong, Porto, Vancouver 5.Implications of these ideas for the purchaser 6.Summary

© Invensys 17 October, 2015Invensys proprietary & confidential 4 1. The Traditional Approach to Designing Railway Control Systems Early railway engineering led by invention of new devices Developments driven by technology Railways were the “high-tech” field of the age Railways were “engineering led” This useful looking device is an early version of an ERTMS beacon.

© Invensys 17 October, 2015Invensys proprietary & confidential 5 1. The Traditional Approach to Designing Railway Control Systems Railways grew and organisations developed Engineering Departments became specialised Each Engineering Department had specialist experts Equipment became more specialised and staffed by experts in their own fields General Manager Operating Dept. Chief Engineers Dept Rolling Stock Engineer Civil EngineerSignal Engineer Admin Dept Traditional departmentalised structure

© Invensys 17 October, 2015Invensys proprietary & confidential 6 1. The Traditional Approach to Designing Railway Control Systems - Problems Traditional specialist disciplines do not align with overall functionality requirements Traditional architecture requires interface control between disparate systems Traditional architecture imposes constraints on total system response

© Invensys 17 October, 2015Invensys proprietary & confidential 7 2. Reasons for Higher Levels of Automation Increased levels of safety - particularly during emergencies and failures Diagnose and Maintenance improvement Cost saving… and prestige

© Invensys 17 October, 2015Invensys proprietary & confidential 8 2. Reasons for Higher Levels of Automation – increased Safety DURING NORMAL OPERATION Observing the Guideway - automatic obstacle detection and intrusion detection. Passenger Transfer - passenger door control and platform edge detection. Train status management Platform screen doors are one method of enhancing safety.

© Invensys 17 October, 2015Invensys proprietary & confidential 9 2. Reasons for Higher Levels of Automation – increased Safety DURING EMERGENCIES AND FAILURES Detection and Management of Hazardous Situations Train diagnostics Fire and smoke detection and management Emergency Handling – terrorism, earthquake (including automated evacuation announcements) Understanding the incident enables accurate and appropriate action.

Self-diagnose of hardware and communications status Registration and reconstruction (“replay”) of all sequences of all events Remote implementation of - software upgrades - tests - changes in layout 2. Reasons for Higher Levels of Automation – increased Safety

Position of trains and service reorganisation (ATS) Tunnel ventilation fans (EMS) Isolation of traction power (Power SCADA) Closure of stations (BMS) Public Announcements (PA) Situation Monitoring (CCTV) Specialist Disciplines do not align with overall functionality requirements – f.i., response to tunnel fire: In an integrated system these functions can be heavily automated to avoid overloading control room staff 2. Reasons… - Cost improvement and prestige

Supervisor Post Local Control Panel Interlocking Traffic Operator Power Operator Radio GSM-R Train’s antennae On-board ATC BRAKES TRACTION DRIVER’S HMI JTCs, pumping,…EMS Radio GSM-R Operational Control Centre OCC Passenger stations Maintenance Centre Depots and yards Trains Track Traction subestations FIBER OPTIC (DOUBLE WAN) CATENARY CIRCUIT BREAKER - SCADA Ticketing,ventilation…BMS Integrated System LCP Signals Interlocking Point machines

3. Benefits of Integrated System Approach Use of one integrated control system simplifies complex interfaces It ensures a co-ordinated response to emergency situations It ensures that all relevant information is available in one location – the OCC Reduced Initial Investment Accommodates Business Expansion Integrated systems provide the management of information from corporate HQ to stations.

Increased Operational Efficiency Reduced Operator Error Increased Multi-skilling of Operators and Maintenance Staff Efficient incident management Reduced Time-to-Clear an Incident Simplified Operator Work Environment Reduced maintenance costs A common “look & feel” operator interface for all sub-systems can provide many benefits. 3. Benefits of Integrated System Approach

4. Metro de Madrid – Alto del Arenal OCC Local legal regulations may avoid operators integration

4. Kowloon Canton Railway Corporation 1 Million passengers per day Track length: 53km A train every 2.5 minutes The first completely integrated control solution in the world… Integration has allowed KCRC to operate East Rail with 3-5 operators.

4. Porto commuter network, Portugal Porto urban & northern lines 20 operational posts Track length: 460 km Commissioned in 2008

4. Canada Line Project in Vancouver Greenfield project 16 stations SIL2 required for underground stations Unmanned operation Completed for 2010 Winter Olympics Total system integration was the requirement for this greenfield project.

5. Implications for the System Purchaser Higher levels of automation benefit from a careful definition of the required functionality for the control system The functionality needs to consider both normal and emergency operation The definition of functionality should be considered independently of the traditional engineering disciplines There are diagnostic & maintenance advantages in using an integrated control system which controls all relevant system elements. Need to take into account legal regulations – external consultants with integrating experience might be helpful

6. Summary The traditional approach of separate engineering disciplines being designed by their own experts has been successful for traditional railways. Railways with higher levels of automation need to exploit that automation to derive Safety and Maintenance improvements. Using traditional methods of design for these non-traditional railways is very likely to result in sub-optimum systems. Using an integrated control system approach, covering all the traditional disciplines, will deliver a system with superior performance at a lower cost.

Many thanks for your kind attention. Tesekkürler.

Invensys and the Invensys logo are trade marks of Invensys plc