Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
MODIFICATION 5/ N N Y PROGRAM TO BE MODIFIED STILL IN PRODUCTION 6/ Y SEPARATE ACQUISITION EFFORT 5/ N TOTAL COST OF MODIFICATION >= MAIS or MDAP 5/, 8/
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Ms. Nancy Dolan CNO N Human Systems Integration in DoD Acquisition.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
SEE OTRR LONG-RANGE PLANNING CHECKLIST SEE OTRR PLANNING CHECKLIST SEE OTRR PRE-REVIEW CHECKLIST LONG RANGE PLANNING PHASE PRE-REVIEW PHASE At OTRR, the.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
Lean & Green Overview: Month One Day 1: Get Your Feet Wet – Overview Both Lean and Green Wastes – Project Charter Training and Outline – In Class: Draft.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Presented at the 2nd Annual DAU-South CONTRACTING CONFERENCE & EXPO
Life Cycle Logistics.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
P r o j e c t : from INITIATING to CLOSING ( 1 ).
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
PRODUCTION/ DEPLOYMENT
Small Business Superannuation Clearing House - Transition to ATO
Principal Investigator ESTCP Selection Meeting
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Technology Readiness Assessment (TRA)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Module 8: Effective Innovation Review and Selection Process
NAVAIRINST D.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
DAE CAE PEO PM OIPT Acquisition Category (FY14 $) ACAT ID
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Principal Investigator ESTCP Selection Meeting
Milestone A to Milestone B Requirements Management Activities
JTAMS MILESTONE A ANALYSIS
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Milestone A to Milestone B Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Phase 2 Tollgate Review Discussion Template
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
The Department of Defense Acquisition Process
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Presentation transcript:

Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition Coordination Team (ACT) Planning Begin Milestone B Decision Brief Notify Participants Validate Adequate R&D Funding Draft ADM (Phase B Exit Criteria) Phase A Exit Criteria Met Validate AoA Plan, AS, ICD, TDS, and Develop CDD, TEMP Complete and Submit Milestone B Decision Brief Milestone B Decision Brief With PEO PEO Approve Exit Criteria ACAT III and IV START Coordinate with SECDEF Coordinate with SECNAV Coordinate with OPNAV Coordinate with SYSCOM Schedule Milestone B Decision Meeting Assess Technology (S&T / ACTD / ATD) FINISH SEE MILESTONE B LONG-RANGE PLANNING CHECKLIST SEE MILESTONE B PLANNING CHECKLIST SEE MILESTONE B PRE-REVIEW CHECKLIST SEE MILESTONE B REVIEW CHECKLIST LONG RANGE PLANNING PHASE PRE-REVIEW PHASE ACQUISITION STRATEGY APB (Including CAIV-based objectives) ADM AoA Plan, CDD, ICD TDS TEMP PHASE B EXIT CRITERIA THREAT ASSESSMENT TEST PLANS (Especially for IOT & E) ENVIRONMENTAL CONSEQUENCES CCA Requirements COST ESTIMATE LRIP QUANTITIES (as applicable) SEE MS B CHECKLIST FOR MORE INFORMATION At Milestone B, the MDA typically emphasizes validation of the following: BEGINNING OF SDD PHASE -LRIP Quantities Approved -Program Initiation -Phase B Exit Criteria 30 DAYS (PRE-REVIEW PHASE) LONG-RANGE (PLANNING PHASE) ~1 DAY (REVIEW PHASE) EXIT CRITERIA FOR PHASE A SATISFIED BEGINNIN G OF PHASE B BEGINNING OF PHASE A – TECHNOLOGY DEVELOPMENT PHASE A This phase focuses on reducing technology risk and on determining the appropriate set of technologies to be integrated into a full system. 180 DAYS CONDUCT ACT MEETING – Obtain consensus to proceed. ( minutes to ACT Participants) DRAFT ACT CHARTER CONFIRM AVAILABILITY OF PRINCIPLES For proposed briefing date SCHEDULE PRE-BRIEF AND BRIEF VIA ACQUISITION WEBSITE AND PEO FRONT OFFICE CALENDAR VALID ICD, AoA PLAN, APPROVED TDS, AND TECHNOLOGY RISK REDUCED 5 DAYS SEND FINAL BRIEF AND ADM TO ACT FOR REVIEW 30 DAYS ENSURE PRE-SYSTEM ACQUISITION ACTIVITIES ARE COMPLETED CONDUCT THE MILESTONE B PRE-BRIEF (Closed Session) 7 DAYS SEND PRE-BRIEF TO ACT MEMBERS FOR REVIEW REVIEW MILESTONE B PRE-REVIEW CHECKLIST 6 MONTHS (PLANNING PHASE) For ACAT ID and IAM see page T2 for additional DAB TIMELINE requirements TIMELINE ~ 1 or More YEARS BETWEEN MILESTONE A and MILESTONE B PEO C4I and SPACE MILESTONE B REVIEW TIMELINE PHASES MS A MS B ADM PEO C4I and SPACE ACQUISITION PROGRAM STRUCTURE GUIDE ENCLOSURE (13) Page T-1 Version 3.0 Feb 2004 NOTE: Milestone B is conducted to assess technology maturity and technical risk for entry into System Development and Demonstration. Refer to DoDI , Para 3.6 and SECNAVINST C, Para for Milestone B requirements. The DAB timeline can be found on page T2. PROCESS BEGINNING OF MILESTONE B PLANNING PHASE REVIEW MS B CHECKLIST & PEO MAJOR REVIEW CHECKLIST DAYS REFINE AoA PLAN, AS, ICD, TDS, AND DEVELOP CDD AND TEMP DAYS PREPARE EXIT CRITERIA FOR PHASE B AND ANY ANTICIPATED ISSUES WITH RESPECT TO PRE-SYSTEMS ACTIVITIES 90 DAYS DRAFT BRIEF AND ADM 30 DAYS 20 DAYS SUBMIT MAJOR PROGRAM REVIEW READINESS SHEET TO PEO 2 DAYS Ensure Adequate R&D Funding Execute Pre-System Acquisition Activities Draft Phase A Exit Criteria Conduct ACT Meetings/Draft ACT Charter 90 DAYS Milestone B Decision Brief With MDA MDA Approve Exit Criteria ACAT I and II