Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.

Slides:



Advertisements
Similar presentations
Predicting Future Gas Lift Performance in a Mature Water Flooded Field
Advertisements

The Focus of Industry Lecture 1 Exploration Refining Production
Going Beyond Exploration
Which Prospects to Drill?
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
3-D Seismic Waveform Analysis for Reservoir Characterization
Power Plant Development Options in Abu Dhabi Application Portfolio ESD.71 Engineering Systems Analysis for Design Kyle Frazier December 2007.
PC Based Reservoir Analysis System Allows Quick Decision on E&P Well Plans for Black Widow Prospect J.L. Buchwalter Gemini Solutions, Inc. T.M. Campbell.
The E&P Business Lifecycle – Timescales and Drivers
ASIA GEOSPATIAL FORUM 2011 Sustaining Geospatial Data Integrity for Safe Exploration & Production (E&P) Operation By: Razali B Ahmad, Saiful Nizam B Mustafa,
JOHN HUDSON ELIZABETH WYANT DR. MIGUEL BAGAJEWICZ APRIL 29, 2008 Economic Potential of Stranded Natural Gas Hydrates.
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
IPAA OIL & GAS INVESTMENT SYMPOSIUM APRIL 21, 2004.
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
Model approach to future offshore exploration Peter Rosenkranz Utrecht 15 January 2009.
A Workflow Approach to Designed Reservoir Study Presented by Zhou Lei Center for Computation and Technology Louisiana State University June 25, 2007.
Black Rock Oil & Gas PLC Annual General Meeting 19 th December 2005.
“The Play’s The Thing!” William Shakespeare, as quoted to Pete Rose THE MOST CRUCIAL DECISION: SELECTING NEW PLAYS.
McGraw-Hill/Irwin Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. 8-0 Corporate Finance Ross  Westerfield  Jaffe Sixth Edition.
Renewable Net Short.
OVERVIEW OF PETROLEUM ENGINEERING.
Oil & Gas Underwriting Analyzing the Return Potential.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
Chapter 1 RESERVOIR.
National Iranian Oil Company
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
Dec.5, 2006 / Beijing China / 1. Dec.5, 2006 / Beijing China / 2 Sustainable Growth for Oil and Gas.
Marginal Field Development Advances in 3D Geological Modeling: How it can help?
Current and Emerging Trends in the Gulf of Mexico Andrew Slaughter, Vice-President, Energy Insight 2013 UK Trade and Investment Breakfast at Offshore Technology.
Workshop Simulated Licence Round 8 th - 10 th February 2012 Petroleum Economics.
Petroleum Engineering Presented by : Mostafa Khojamli November
SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully.
Stochastic Handling of Uncertainties in the Decision Making Process SPE London, 26th October 2010 Dag Ryen Ofstad, Senior Consultant, IPRES Norway.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Carbon Sequestration and CTL Technology in West Virginia West Virginia GIS Technical Center Evan Fedorko.
New Decline Curve Tool for GOM 3 /GOMsmart & “Forgotten Oil & Gas Study” 2012 GOM 3 User Conference at Anadarko John D. Grace, Ph.D. Earth Science Associates.
Risk in Well Plugging & Abandonment by Twachtman Snyder & Byrd, Inc
Spotfire User’s Conference Oct PC-Reserves/Spotfire Interface New Spotfire Link to PC-Reserves Accelerates QC and Reserves Reporting John Pederson.
Classification: Statoil internal Status: Draft
MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS
Automating Continuous Gas Lift
OIL AND GAS EVALUATIONS PROBABLE & POSSIBLE RESERVES WHAT WILL THE INVESTOR THINK? February 15, 2010 FORREST A. GARB & ASSOCIATES, INC. INTERNATIONAL PETROLEUM.
1 of 30 GIS for Reservoir Management: Estimating Original Gas In Place Jeffrey Vu, M.GIS Candidate Dr. Patrick Kennelly, Advisor.
Wytch Farm Field Development Project
Res A Performed By Gemini Solutions, Inc. May 2001.
1 October 2005 Energy Summit 2005: Louisiana’s Integration with Global Energy Markets.
E VALUATION OF THE S IRRI P ROSPECT A REA Hamed Kamel PEEG Fahd Al-Hashmi PGEG Khaled Aness PGEG Ahmed Al-Belooshi PEEG Engineering Staff:
Oil and Gas Insurance Lessons for East Africa 7-Dec-15.
老師:戴 子 堯 學生:陳 立 偉 日期: Outline INTRODUCTION THE DRY EDM PROCESS EXPERIMENTAL SETUP CONCLUSIONS 2.
Careers in Petroleum Geology Slides from aapg.org Presented by Rick Abegg Chevron.
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
 BASIC TERMS AND CONCEPTS (1) Petroleum: refers to crude oil and natural gas or simply oil and gas. (2) Crude oil: refers to hydrocarbon mixtures produced.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Oil & Gas Industry Introduction to the Upstream Sector.
Wellbore Stability in Olmos Formation
Introduction to Well Completions
Earth models for early exploration stages PETROLEUM ENGINEERING ÂNGELA PEREIRA Introduction Frontier basins and unexplored.
Study of the Niobrara Formation in the Borie Field Abdulaziz Muhanna Alhubil, Gabrijel Grubac, Joe Lawson, Rachael Molyneux & David Scadden.
1 Louisiana Assessors’ Association Oil & Gas Committee Recommendations LTC Rules and Regulations Tax Year 2010 Louisiana Assessors’ Association Oil & Gas.
Logo here… PORE PRESSURE PREDICTION OF SOME SELECTED WELLS; INSIGHT FROM THE SOUTHERN PLETMOS BASIN, OFFSHORE SOUTH AFRICA. Oluwatoyin Ayodele, Mimonitu.
1 Spars for Deepwater Developments Don Vardeman VP, Worldwide Projects Anadarko Petroleum Corp September 9, 2009.
INTRODUCTION © 2017, John R. Fanchi
Field Development Optimization
Petroleum Accounting.
INSTRUCTOR © 2017, John R. Fanchi
Dr. Roger N. Anderson Energy Research Center
Introduction to Effective Permeability and Relative Permeability
What are Lebanon’s oil and gas prospects
SPEGC Northside Study Group “Unconventional Reservoir Horizontal, Multi-Stage Completion Design Optimization” Presented by Stephen Schubarth President.
Presentation transcript:

Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly

2 Outline Introduction – the Business Challenge Summary of Discovery to Development Process Spatial Characterization of Prospects and GIS Methodology Engineering Characterization of Prospects Integration of GIS with Other Applications Presentation of Results Conclusion and Future Steps

3 The business challenge Estimate petroleum development costs to guide exploration program Automate, standardize and codify engineering cost estimation

4 The business challenge TD: WD: VOL: 310 AGE: Miocene Pressure: 28378psi HC Type: Oil TD: WD: VOL: 250 AGE: Miocene Pressure: 24480psi HC Type: Oil 15$ a barrel 50$ a barrel While X has bigger volume, Y might be a better value

5 Discovery to Development Process Exploration well Appraisal well Exploration Exploration prospect inputs −Outline of prospect area −Well location −Reserve Size −Water Depth −Target Depth −Fluid Type −Expected Pressures Output is well cost and well timing Appraisal Number of appraisal wells determined by reserve size Output is well cost(s), seismic cost, and timing Field Development Based on logic from tool which will be seen in upcoming slides Output is all development costs and production forecast for life of field

6 Spatial characterization of developments 30 o 3000 feet Well Spacing Calculation Bottom Holes Placement Maximum Drill Reach Calculation Drill Center Distribution Gathering System Alignment for Multi- drill Center Scenarios Generation of Tie-Back Options

7 Spatial characteristics of developments Well Spacing Calculation INPUTS: Hydrocarbon type Prospect Area and Shape Maximum Volume per Well

8 Spatial characteristics of developments Bottom Holes Placement

9 Spatial characteristics of developments Maximum Drill Reach Calculation INPUTS: Target Depth Water Depth Maximum drill reach Spatial Well Distribution 30 o 3000 feet

10 Spatial characteristics of developments Drill Center Distribution

11 Spatial characteristics of developments Gathering System Alignment for Multi-drill Center Scenarios INPUTS: Center of the Prospect Drill centers Spatial Distribution

12 Spatial characteristics of developments Generation of Tie-Back Options INPUTS: Hydrocarbon Type Platforms Spatial Distribution

13 Engineering characterization of prospects Engineering characterization of developments a. Drilling performance and well types b. Completion technologies and configurations c. Production facilities and tie-backs d. Additional production parameters

14 Engineering characterization of prospects Drilling Performance and Completion Technologies 30 o 3000 feet Drilling performance (days to drill 10,000ft) Varies by geologic target Well tangibles vary by geologic target Drill rig day rates ($/day) – company rates Rig type MODU or Platform Rig Type of Well Exploration, appraisal, or development Completion type Wet tree or dry tree Maximum drill reach Establishes number drill centers required

15 Engineering characterization of prospects Production Facilities and Tie-backs Wet Tree Local FPS host cost a function of: Peak field production Water injection requirements Number of wells Shut in Tubing Pressure Water depth Typical Wet Tree Development Subsea tie-back to existing FPS host Oil – 25 mile radius Gas – 75 mile radius Subsea cost a function of: Number of wells Number of drill centers Distances between drill centers Shut in Tubing Pressure Dry Tree local FPS host cost a function of: Peak field production Water injection requirements Drill rig requirements (Dry tree development only) Number and type of wells Shut in Tubing Pressure Water depth

16 Engineering characterization of prospects Additional Production Parameters Field production forecast is the sum of individual wells brought online per drilling and completion schedule. Well forecasts utilize initial rate, reserves per well, and decline by geologic age. Water injection wells are the ratio of producing wells with well depth consideration. Optimize facility options (dry tree versus Subsea tie-back) based on number of wells at each drill center Export pipeline cost included to existing FPS’s within 30 miles or nearest one Matches facility cost spending profile with first oil date Facility abandonment and salvage cost included

17 GIS and Information Technology applied Flow of Automation Spatial characterization of developments ArcGIS & ET GeoWizards Engineering characterization of developments MS Excel Organization of results MS Access Presentation of results PowerPoint VBA Automation

18 Organization of results A

Subsurface Data: Gross recoverable mmboe 250 Net recoverable mmboe 63 Reserves per well mmboe/well 9 Number of producers 27 Number of injectors 9 Capital ($m): GrossWI:9% E&A Drilling: Dev drilling:11,788 1,107 Facilities: 3, Cap OH: Total:16,248 1,525 Indicators(NRI)SuccessRisked Ps:25% IRR % NPV7 ($m) % Disc. payback (yrs) IE (NPV/WI capital) ProspectX SS Development w Semi Host BP CONFIDENTIAL

20 Conclusions Manual process was automated for a batch of prospects Took days for each prospect manually, a matter of minutes automatically with favorable results ARCGIS was a key technology to automate the calculation Integration of GIS Technology with Access, Excel and PowerPoint Generated results for hundreds of prospects for comparison purposes: 800+ prospects, 2,300+ development options Future Steps: −Incorporate an economic model for the output −Simplify cost estimate updating −Incorporate portfolio analysis toolkit

21 Acknowledgements BP Engineering Team - Engineering Characterization of developments Charles Fried - Flow of Automation between GIS and Excel Engine Patrick Kennelly – Penn State Program Advisor