STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary.

Slides:



Advertisements
Similar presentations
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Advertisements

RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cavity-Coupler Treatment & Testing Preparation of crab cavities for KEKB RF aging of input couplers. 17 th September 2009, LHC-CC09 at CERN K.Nakanishi.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Heat load study of cryomodule in STF
ESS cavities interfaces
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
HD target.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Field emission issue and strategy to improve H. Hayano.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Dec/3/2015WG2 in TTC Meeting Field emission / Radiation in V.T. Kirk.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
ILC 07 May 30-June 3, 2007 N.Solyak 1 MULTIPACTORING SIMULATIONS IN CAVITIES AND HOM COUPLERS Nikolay Solyak, Ivan Gonin, Jiajian Li Fermilab.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
OUTCOME OF FIRST CAVITY TESTS With help of T. Junginger, N. Schwerg, K. Liao, P. Maesen, M. Gourragne, A. Benoit, O. Brunner SPL Seminar 2012 at CERN 112/07/2012Mathieu.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
S A Griffiths CM42 June 2015 Electrical & Control.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Cornell Updates Commissioning of T-map for ILC single cell starts.
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
Teleconf ACS – FREIA 28th March 2017
HOM-BPM study in STF for cavity miss-alignment detection
ILC10 Beijing Global Design Effort
Inspection of STF Baseline cavity #5 and #6
HFM Test Station Main Cryostat
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
RF interlocks for higher intensities (LMC 15 June)
Masaru Sawamura (JAEA)
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
KEK injector cryomodule
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
CEPC-650MHz Cavity Cryomodule
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Cavity & Cavity Integration; recent KEK activities
Teleconference ACS – FREIA 19th June 2017
ESS Spoke cryomodule testing: cryogenic experience
Presentation transcript:

STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary of RF Conditioning ▪ Experimental Log ▪ Sensor 2K&4K ▪ After the Vertical Test… ▪ About Inspection of Cavity Inside ▪ Summary 2006/09/15 Kirk

Q 0 -E acc 2K for this measurement π mode only ! 14.1MV/m

Q 0 -E acc 2K&4K for all measurements 7.0MV/m 17.1MV/m 16.3MV/m π mode only ! 6.8MV/m 14.1MV/m

Q 0 &E acc time 4K

Q 0 &E acc time 2K π 8π/9 7π/9 π 6π/9 5π/9 4π/9 π 3π/9 8π/9

Q 0 &E acc time 2K π 8π/9 7π/9 π 6π/9 5π/9 4π/9 3π/9 π

Summary of RF Conditioning dateTemp. [K]Total time [h:m]π mode only [h:m]Max. E acc [MV/m] 9/524:032: /624:171: /724:021: /840: /825: ~10:00 (π mode

Experimental 2006/09/04 9/04 16:40Cavity installation into the cryostat 17:00~Vacuum evacuation for the cryostat 17:17Dewar valve open Cool down start 21:05Cavity temp. 3.9K

Experimental 2006/09/05 9/05 10:401000ℓ dewar exchange 11:10Pass-band measurement 12:20cable correction 14:27calibration for RF diode :30standard data 4.2K (over-coupled) f 0 = [MHz], τ=28.8[msec] :34standard data 4.2K (under-coupled) f 0 = [MHz], τ=29.6[msec] :41decompression start 15:10We found that the helium pressure data had been mistaken. 18:00decompression finish R s =14.26[nΩ] :082K Run start :21electron 8.1[MV/m] :32X-ray emission 11.0[MV/m] 14.0[MV/m] ⇒ self-pulse mode 14.1[MV/m] ⇒ self-pulse mode 14.1[MV/m] ⇒ self-pulse mode :32Mode change (π ⇒ 8π/9 mode, f 0 = [MHz]) 16.0[MV/m] ⇒ self-pulse mode 20:22Mode change (8π/9 ⇒ π mode, f 0 = [MHz]) 14.1[MV/m] :28self-pulse mode 21:01Mode change (π ⇒ 4π/9 mode, f 0 = [MHz]) 9.1[MV/m] 9.9[MV/m]

Experimental 2006/09/05 (cont.) 9/05 21:44Mode change (4π/9 ⇒ 3π/9 mode, f 0 = [MHz]) 10.1[MV/m] 12.1[MV/m] 12.4[MV/m] ⇒ self-pulse mode 22:11Test was finished

Experimental 2006/09/06 9/06 9:43He transfer start 10:52He transfer stop 11:08decompression start 16:45RF Amp. On Set the concrete shielding 17:002K Run start 13.0[MV/m] 18:50Mode change (π ⇒ 4π/9 mode, f 0 = [MHz]) self-pulse mode 19:13Mode change (4π/9 ⇒ 7π/9 mode, f 0 = [MHz]) 14.1[MV/m] 15.2[MV/m] 20:36Mode change (7π/9 ⇒ 6π/9 mode, f 0 = [MHz]) 14.3[MV/m] :48electron detected self-pulse mode :58Mode change (6π/9 ⇒ 5π/9 mode, f 0 = [MHz]) 21:00electron detected 12.1[MV/m] 12.8[MV/m] self-pulse mode :17Mode change (5π/9 ⇒ 8π/9 mode, f 0 = [MHz]) self-pulse mode Test was finished

Experimental 2006/09/07 9/07 9:35Dewar exchanged 10:30He transfer start 12:00decompression start 15:10decompression stop :20RF On 2K Run start 14.0[MV/m] ⇒ self-pulse mode 16:00Mode change (π ⇒ 8π/9 mode, f 0 = [MHz]) 16.6[MV/m] ⇒ self-pulse mode :21Mode change (8π/9 ⇒ 7π/9 mode, f 0 = [MHz]) 15.2[MV/m] ⇒ self-pulse mode :50Mode change (7π/9 ⇒ 6π/9 mode, f 0 = [MHz]) 14.6[MV/m] ⇒ self-pulse mode 17:17Mode change (6π/9 ⇒ 5π/9 mode, f 0 = [MHz]) 12.6[MV/m] ⇒ self-pulse mode :48Mode change (5π/9 ⇒ 4π/9 mode, f 0 = [MHz]) 7.5[MV/m] ⇒ self-pulse mode 9.9[MV/m] ⇒ self-pulse mode 18:29Mode change (4π/9 ⇒ 3π/9 mode, f 0 = [MHz]) 12.4[MV/m] ⇒ self-pulse mode :59Mode change (3π/9 ⇒ π mode, f 0 = [MHz]) 14.0[MV/m] ⇒ self-pulse mode 19:28Test was finished

Experimental 2006/09/08 9/08 9:25He transfer start 10:18He transfer stop :30RF On :504K Run start 6.1[MV/m] 6.8[MV/m] 6.8[MV/m] RF Off decompression start 14:35decompression stop 15:092K Run start 14.0[MV/m] self-pulse mode 20:14Test was finished

Experimental 2006/09/09 9/09 9:35Warm-up start 12:52Warm-up finish

E pk per cell cellπ8π/97π/96π/95π/94π/93π/9 1 & & & & unit : [MV/m]

Sensor Position in this measurement Cell #4 HOM #1 tip weld

Heating detected by Carbon Resistor Around cells Cell #1 had the heating spot at 4K.

Heating detected by Carbon Resistor Around cells π 8π/9 7π/9 π 6π/9 5π/9 4π/9 3π/9

Heating detected by Carbon Resistor Around #4 cell π 8π/9 7π/9 π 6π/9 5π/9 4π/9 3π/9 Cell #4 APD 45mm

Heating detected by Carbon Resistor Around cells ππ