Solar-B E I S EUV Imaging Spectrometer Consortium Meeting, June 99, BU A System View of EIS Matthew Whyndham, MSSL Hirohisa Hara, NAOJ.

Slides:



Advertisements
Similar presentations
Writing Good Use Cases - Instructor Notes
Advertisements

PROJECT MANAGEMENT BASICS
Slide 1 Insert your own content. Slide 2 Insert your own content.
Chapter 1: The Database Environment
Chapter 26 Legacy Systems.
Assessing the Influence of System Engineering Processes on Project Success Presented by Paul J. Componation Professor, Industrial and Systems Engineering.
1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
Overcoming Customer Constraints on Requirements Documents Presented by: Robert Smole Presented by: Robert Smole November 5, 2008 Sub-Optimization of Systems.
Railways Systems: Applications HSI beyond DoD Dr. Jen Narkevicius Jenius LLC Dr. Jen Narkevicius Jenius LLC Human Systems Integration.
1 Introducing the Specifications of the Metro Ethernet Forum.
EA Demonstration Study : Dissemination Forum – 8 June EA Views and Sub-views Patrick Bardet EA Unit.
EA Demonstration Study : Dissemination Forum – 8 June EAEA Framework Proposal Paolo Monaco EA Unit.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
4. What is the boundary between two drainage basins called?
Modern Systems Analyst and as a Project Manager
1 9 Moving to Design Lecture Analysis Objectives to Design Objectives Figure 9-2.
EIS/Solar-B: 3. Electrical Interface to MDP EISMDP PIM HK PIM DHU DR analog data (temperature, current, etc.) S/C bus image compression status data command.
Solar-B E I S EUV Imaging Spectrometer Consortium Meeting, June 99, BU Recent Progress a Summary of Progress during the last six months Matthew Whyndham.
BALANCING 2 AIM: To solve equations with variables on both sides.
© Institut für Wirtschaftsinformatik, Universität des Saarlandes 1999 Slide 1/14 MARVIN Modelling Workshop Saarbrücken 18 th - 19 th march 1999.
Construction process lasts until coding and testing is completed consists of design and implementation reasons for this phase –analysis model is not sufficiently.
Week 2 The Object-Oriented Approach to Requirements
Electric Bus Management System
Software change management
Mind Mapping Techniques to Create Proposals APMP Colorado Chapter March 6, 2012 James J. Franklin San Diego PMI Chapter PMI is a registered trade and service.
ABC Technology Project
By Anastasia Lidya Maukar
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
O X Click on Number next to person for a question.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Overview of the PBN Airspace Implementation Processes
Probabilistic Volatility in the Western Interconnection Matthew Elkins.
Squares and Square Root WALK. Solve each problem REVIEW:
Executional Architecture
© CGI Group Inc. CONFIDENTIAL Reference case : Real time passenger counting Virtual train: combine all information on assets 9 januari 2013Riccardo Becker.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Week 1.
We will resume in: 25 Minutes.
Dantzig-Wolfe Decomposition
O X Click on Number next to person for a question.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Improving the way we learn
Karolina Muszyńska Based on: S. Wrycza, B. Marcinkowski, K. Wyrzykowski „Język UML 2.0 w modelowaniu SI”
ISIS Turnkey Missions ISIS designs, manufactures, launches and operates affordable, capable, nanosatellites ISIS provides turnkey missions for institutional,
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
1 Arizona State University Senior Design ASU/JPL Flight System Group Members: Robert Hoffman, Dusty Terrill, Adam Nikolic, Josh Ruggiero.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Introduction to Project Management
Planetary Lander PDR Team Name
GLAST Large Area Telescope:
<Your Team # > Your Team Name Here
Presentation transcript:

Solar-B E I S EUV Imaging Spectrometer Consortium Meeting, June 99, BU A System View of EIS Matthew Whyndham, MSSL Hirohisa Hara, NAOJ

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 2 Outline jMWT yThe core technical requirements yEIS subsystems (components) + documents yEIS interfaces yFlow of interface information yStatus of the subsystems yEIS Development Schedule yMass Budget yPower Budget yEnvelope yData flow – sensors to ground j HH yThe Solar-B Spacecraft and its environment yEIS interface information report (to MELCO) ySpacecraft Development schedule

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 3 Core Technical Requirements Essential … we must achieve these: yDeliver Science yConform to Spacecraft Accommodation yFeasible design (cost, schedule and risk) Desirable: these factors are to be considered where possible: yenhancements to science return ytechnology development (strategic directions) ynice ideas

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 4 Science Requirements

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 5 EIS Subsystems - Components xA definitive list of subsystems is given in the System Hierarchy document : EIS-sys-des-hierarc - e.g. hierarc3.pdf Is there a document which explains the nature of each subsystem in relation to the whole and the functionality of each element and the responsibility for its design and manufacture? - NO, not yet ! xBut see System Hierarchy and Master Interface List EIS-sys-des-mintlist xThe system block diagram is EIS Physical View EIS-sys-des-physview This diagram does not show any dimensions xThese are core documents and will be maintained on the web

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 6 System Hierarchy on the web

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 7 EIS Interfaces yFlight Equipment xExternal - with spacecraft xInternal - between components xInternal - same institute xTest / GSE - non-flight configuration yGround Segment similar breakdown … yMaster Interface List only shows Flight (External, Internal) xTest and Ground Segment interfaces not shown

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 8 Master Interface List on the web

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 9 Flow of Interface Information mailto:eis-tech cc:PIs, Co-Is System Design Team (SDT)

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 10 Status of the subsystems

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 11 EIS Development Schedule on the web

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 12 Mass Budget on the web

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 13 Power Budget jEstimate ypreliminary 6/99 y45.5 W Average y84.19 W Peak yAJM -> detailed breakdown jAllocation y?

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 14 Envelope jQuasi rectangular envelope assumed y3200 X 250 X 550 ybased on strawman design yEvolving... -> SM structure concepts jsize of thruster tank and space for momentum wheels may increase, the size and shape of bus structure will be affected by those. When the size and shape of bus structure change, EIS interface points will also be affected. The system side wants to know the size and shape of EIS structure by this reason. If there is a small room in the EIS envelope region which was sent on May 24, the system side can use it as a freedom for the bus structure.

Solar-B E I S EUV Imaging Spectrometer June '99 (BU) Consortium Meeting System View of EIS - MWT 15 Data Flow - Sensors to Ground jPossible constraints of data flow yFPA -> ICU yICU framestore -> ICU output packets yICU -> MDP xMDP processing rate yMDP -> DHU yDHU capacity yGround station link yGround segment interfaces yExplored in more detail later (Software, RAG)