FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Balancing Update Stakeholder Group Meeting - 4 November 2009.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
1 Meeting the Regional Electricity Market Opportunities South East Europe Energy Week “Athens Forum” Meeting Rome, March 2003.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
1 WHOLESALE ELECTRICITY MARKET DESIGN AND STRUCTURE Massimo Parati Market Department Italian Regulatory Authority for Electricity and Gas Milan, March.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Market design and market power in wholesale electricy markets Guido Cervigni IEFE-Bocconi University, Milan CEEM – Summer School on Economics of electricity.
SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013.
1 IFIEC Energy Forum 22 November 2011 Electricity.
France-UK-Ireland (FUI) Region 5th Stakeholder Group (SG) 26 th November 2007, London Interconnector Operator (ICO) Update Simon McVeigh (NGIL) Jean-Gabriel.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
FUI Stakeholder Group 4 th July 2008 Congestion Management.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG December 2008 John Prime - Claude Perret.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Renewable & CHP Generators : A suppliers perspective Presentation by Steve Armitage Tel
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
1 Identification of the needs to modify auction rules in the FUI region Congestion management meeting – 11 January 2007.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
European Commission views on intra-day and balancing markets
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
Report from balancing workshop Lesley Queripel 1 February 2007.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
Electricity Markets Simon Watson. Overview UK as exemplar The state-owned Electricity Supply Industry The Electricity Pool Hedging Your Bets! Deregulation.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Electricity Markets Simon Watson.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Regulators’ update on Congestion Management and Balancing
SG meeting FR/UK/IR region 14 June 2007 Congestion management
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Draft document – Work in progress
Interconnector trading in SEM 7th June 2007
Presentation transcript:

FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime

5 Principles  Competition  Enhanced Balancing Services procurement in respective control areas  Transparency and non-discriminatory access  Inherently transparent arrangements with no impact on TPA  Preserving security of supply  Must not endanger system security in the local area  Inter-TSO Emergency arrangements remain  Compatibility and reciprocity  Reciprocal arrangements between GB and French markets  No Interconnector Capacity Reservation  Unutilised IFA capability identified post gate-closure

Process 23:00 All times approximate GMT D-1 D Y-1/M-1 Start 07:45 01:00 23:00 IFA Contract Day Secondary Mechanisms Re-Alloc’n/Assign’t 06:00 LT Transfer Nomination New Reciprocal Balancing Arrangements NGET and RTE formulate balancing offers in D+xh timescales, only after all commercial intraday nominations have been completed following the respective Interconnector Intraday gate closure (Day Ahead Nomination) UIoSI rule implemented for unused LT capacity 03:0005:0007:0009:0011:0013:0019:0021:0017:0015:00 XX:00 13:00 UIoLI rule implemented for unused LT+DA capacity XX:00 * 12 Intraday Gates illustrated See next slide etc Rolling hourly pricing of SO-SO balancing offers for service delivery at x+1h. Offered prices based on those in the deliverer’s domestic BM. User capacity rights and volumes unaffected as per the previous slide with SO-SO balancing services superimposed over User’s volumes.

Timing Illustration 04:00 05:00 06:0007:00 08:00 Interconnector Intraday gate closure Period of activation Delivery period BM Services can only utilise unused and available interconnector capability following each intraday gate closure. TPA capacity allocation mechanisms in all timescales not impacted by balancing service actions. Formulation of balancing services offers Publication of prices

Activities Pre Gate Closure: Normal TPA access arrangements TSOs may NOT reserve IFA capacity TSOs calculate and exchange inter-TSO balancing bids/offers (interim solution) TSO bids/offers are published (interim solution) At Gate Closure: Market participants submit final notifications, nominations and BM bids/offers Participants may no longer trade over the IFA TSOs calculate residual IFA capability Post Gate Closure: TSOs calculate and exchange inter-TSO balancing bids/offers TSO bids/offers are published TSOs notify bid/offer acceptances Delivery of accepted volumes Details of TSO transactions are published

Pricing and Volume Principles  Prices submitted close to GB Gate Closure  Prices Curve  Different prices for different tranches of volume  Prices will be cost-reflective and will reflect forecast conditions in real time  Market Imbalance (NIV)  Bid and Offer prices available in BM  Transmission constraints  NGET will NOT sterilise reserve in GB  NGET will take on a limited degree of pricing risk  Volume will initially be limited to 500MW  To be reviewed after a suitable period of operation (initially proposed as 1 year)

Implementation Timetable (Interim)

Implementation Timetable (Enduring)

Interim (Hybrid) Solution  Manual work-around based on current BASA  Significantly increased functionality  TSOs exchange 6 prices at day-ahead stage  Price windows correspond to current intra-day gate closure in French market (subject to availability of IFA capacity)  National Grid will have ability to re-submit prices intra-day  Price exchange and acceptance based on present arrangements  Implementation targeted for August 2008

Summary – Enduring Solution  “Real Time” Balancing, after IC Gate Closure  Hourly prices, set 1-hour before delivery  Price Curve – prices in 100 MW tranches  Prices influenced by anticipated real time energy and transmission issues  Volume - initially maintain current 500 MW cap  Implementation targeted for July 2009

FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime