Tackling Dementia Care as a Whole System Paul Forte The Balance of Care Group www.balanceofcare.com.

Slides:



Advertisements
Similar presentations
The Balance of Care Group Alternatives to Hospital MODELS OF INTEGRATED CARE Tom Bowen ORAHS 2008, Toronto, 29 July.
Advertisements

Pharmacology and the Nursing Process in LPN Practice
1 AT Funding Sources $ PublicPrivateCommunity. 2 AT & Public Funding Health Care Medi-Cal Pays for medically necessary treatment services, medicines,
THE COMMONWEALTH FUND 1 Comparing Health Care Systems Performance: Opportunities for Learning from Abroad Alliance for Health Reform April 11, 2008 Robin.
ProvenHealth Navigator: A Patient Centered Primary Care Model
Common Wealth Fund Webinar February 5, 2013
0 - 0.
Addition Facts
DELAYED DISCHARGE – AN NHS PERSPECTIVE RIETA VILAR JOINT FUTURE PLANNING MANAGER 11 June 2007.
Whole System Models of Care for Older People Tom Bowen The Balance of Care Group ORAHS 2004, Stockholm, Sweden 28 June 2004.
Whos in the beds? Experience of using the AEP in the UK Paul Forte ORAHS Working Group Prague, July 2003.
Commissioning Integrated Care for Older People London 1 February 2005 Paul Forte, Richard Poxton Chris Foote, Tom Bowen, The Balance of Care Group.
Whos in the beds: surveying and the aftermath Dr Paul Forte Balance of Care Group and Centre for Health Planning & Management, Keele University, UK.
A Whole System Approach to Developing Telecare Strategy Paul Forte The Balance of Care Group
Older People with Dementia in Acute Care: K ey messages from the NAO report Paul Forte The Balance of Care Group
Alternatives to hospital for end of life care Tom Bowen The Balance of Care Group NAO End of Life Care Conference, London, 17 June.
Achieving the 18 week maximum wait Tom Bowen The Balance of Care Group Routledge Health Management Conference 14 September 2006.
Acute Medicine Interface
FIFE FALLS AND BONE HEALTH TRAINING INTRODUCTION Aims and objectives 9.45 – Session Presentation – Introduction to Group.
1 0N-SITE TREATMENT OF HEPATITIS C - A PILOT STUDY Shay Keating, MB, PhD Medical Officer.
Mental Health is Integral to Overall Health. Health Issues Related to People with Serious Mental Illness People with SMI who receive services in the public.
Primary Care – Changing Future 1 PRIMIS 23 rd April 2002 Metropole Birmingham.
1 Medication Reconciliation at Osborne Park Hospital Karen Chapman, Senior Pharmacist Aaron Cook, SQuIRe Project Officer.
For the Healthcare Provider
Provider Portal and IC Reports Update for Artemis Users May 20, 2014.
MANAGING PRESSURES IN AN ACUTE SETTING Grant Archibald Director Emergency Care & Medical Services 10 TH JUNE 2011.
Paul Walley Associate Professor Warwick Business School Redesigning Emergency Care Lessons from the UK.
Transforming Health Care in Ontario HLA#2 Meeting May 17, 2013.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Addition 1’s to 20.
Sutton CCG and LB Sutton have come together to develop and deliver a joint strategy
The Sutherland Project KATE BONE ABHI Integration Coordinator.
Test B, 100 Subtraction Facts
Week 1.
Introduction to Standard 5: Patient Identification and Procedure Matching Advice Centre Network Meeting Nicola Dunbar March 2013.
1 Truman Medical Center Lakewood General Practice Residency in Dentistry.
David Pigott JIT Associate RESHAPING CARE FOR OLDER PEOPLE AND CHANGE PLANS Outer Hebrides Community Planning Partnership.
Baseline Model of care for proposed community wards Appendix 1.
Week 5- The Organisation of Health Services Part 2.
IMPs – Intermediate Mental & Physical Health Care Team
Frail Older People Co Chairs Maura Devlin and Dr April Heaney Engagement through a workshop with a wide range of stakeholders Key priorities areas identified.
Shaping a service Colin Hughes Consultant Nurse - Older People (Mental Health) Chesterfield Primary Care Trust.
Staying Healthy, Active and Involved in the Community Optimizing Your Resources The Lakeside Medical Unit Johns Hopkins Bayview Care Center.
Yvonne McWean Lambeth Primary Care Trust 24th February 2009.
GP Perspectives on the Home Based Crisis Team. City North Sectors, Cork. Muller Neff, D., O’Brien S.M. ABSTRACT: OBJECTIVES: The introduction of crisis.
SESIH Redesign Update Older Persons and Chronic Care Project Paul Preobrajensky Manager Redesign Program 19 September 2007.
South Tees Hospitals Hospital Discharge Bev Walker Assistant Director of Nursing and Patient Safety Patients are central to everything we do.
Reducing hospital admissions Improving care for people with dementia.
Idealised Design and Modelling of Alternatives to Hospital Care Tom Bowen ORAHS 2010, Genoa, Italy, July 2010.
Introduction Anticipatory care plans were introduced in October 2011 as part of the enhanced service contract for general practice, with the aim of reducing.
Programme for Health Services Improvement in Cardiff and the Vale of Glamorgan REHABILITATION, INTERMEDIATE CARE AND SERVICES FOR FRAIL OLDER PEOPLE CARDIFF.
The Health Roundtable Connecting Care in the Community Presenter: Nicole McDonald, Manager Ongoing and Complex Care, CCLHD Central Coast LHD - NSW Innovation.
Cardiff and the Vale Healthcare Community Programme for Health Services Improvement Rehab & Intermediate Care Workshop 19 July 06.
Our five year strategy 1. The health and social care system in NE Hampshire and Farnham faces an unprecedented challenge Greater demand as a result of:
Community Intervention Team – the role it plays in integrated patient centred care Noreen Curtin 6th October 2015.
Quality Education for a Healthier Scotland Pharmacy Pharmaceutical Care Planning Vocational Training Scheme: Level = Stage 2 Arlene Shaw Specialist Clinical.
CHILDREN AND YOUNG PEOPLE’S HEALTH SUPPORT GROUP Unscheduled Care Helen Maitland National Lead.
DISCHARGE DEVELOPMENTS ACROSS NORTH GLASGOW OUTPATIENT AND HOME PARENTERAL ANTIBIOTIC THERAPY (OHPAT) SERVICE Lindsay Semple Project Manager/Nurse Specialist.
Older People’s Services The Single Assessment Process.
Issues in Australian Health Care. Vocabulary list Biomedical model of health, medicare, complementary health services, alternative health care services,
The Balance of Care Group in association with Lincolnshire Partnership Trust, Lincolnshire PCT, United Lincolnshire Hospitals NHS Trust, Lincolnshire County.
The single assessment process
Performance assessment A performance assessment framework is a collation of statistics across a district or within a hospital and is far removed from.
Challenging Dementia in Brent Dr Etheldreda Kong Panel: Improving early diagnosis 25 th October 2013.
Discharge planning Discharge Liaison Nurse’s Patient Flow Team Janet Davies Christine Jones-Williams.
Sunderland MCP Vanguard. Before Vanguard: GPs operating independently with little influence on community services and over discharge planning. Hospitals.
Bed based response -information for design workshop
Complex Leg Wound Service - Preventing Leg Ulcers
IMPs – Intermediate Mental & Physical Health Care Team
IMPs – Intermediate Mental & Physical Health Care Team
Presentation transcript:

Tackling Dementia Care as a Whole System Paul Forte The Balance of Care Group

2 Pre admission AdmissionDiagnosisTreatmentDischargeRe-admission Social details alone, carers, residence Risk factors: age, drugs, co- morbidities, psychiatric/ dementia, falls Preventative care Disease management Managed populations Source of referral Time Waiting time Route Decision maker Reason for admission Alternatives to acute admission setting Admission diagnosis Inpatient diagnosis Delays in diagnosis Chronic disease Alternative access for diagnosis Delays in therapy Alternative settings for therapy (especially rehab) Discharge planning Delays in planning Delays in execution Alternative sites for discharge Revolving door Avoidable e.g. chronic disease management Alternative sites for readmission A whole system perspective

3 The Lincolnshire bed usage survey To identify the number and types of inpatients currently receiving hospital care (acute and non-acute) who might potentially have: –been treated elsewhere and avoided admission –required admission, but could now be treated elsewhere –particular emphasis on people with dementia

4 The Lincolnshire bed usage survey To identify the number and types of inpatients currently receiving hospital care (acute and non-acute) who might potentially have: –been treated elsewhere and avoided admission –required admission, but could now be treated elsewhere –particular emphasis on people with dementia Point prevalence survey on 29 November 2006 –All medical and orthopaedic inpatients (667) –All intermediate care inpatients (121) –All OPMH inpatients (75)

5

6

7

8

9

10

11

12 Appropriateness Evaluation Protocol On admission Severity of illness eg unconscious, unable to move (fall), acute bleeding Intensity of service eg surgery + general anaesthesia, regular monitoring, IV therapy On day of care Medical services Nursing services Patient condition eg acute confusion, other acute states, coma, fever

13

14

15

16

17 Some Key Points 111 out of 863 patients surveyed (13%) had a recorded dementia diagnosis 65 were in acute hospital There may be substantial under-diagnosis or under- recording of dementia Majority of acute hospital patients with dementia were outside AEP criteria on the day of the survey Potential alternative care settings cover a wide range of services; specialist coordination may be needed Demand for rehab support for people with dementia