Functional Requirements Generate an AC current Supply an output of 500 to 1000 Watts Supply power to the Coover Hall grid Turn off in high wind speeds.

Slides:



Advertisements
Similar presentations
E2 Motors and Motor Starting (Modified)
Advertisements

Understanding Electrical TransmissionDemonstration A1 A Guide to the National Grid Transmission Model Demonstration A1 How is electricity generated and.
Wind Turbine Session 4.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
» When you have completed this module you will know, what components do, what they physically look like and how they are represented in a circuit diagram.
Accelerometer’s for Wind Turbines Alternative Energy Wind turbines are a growing source of alternative clean energy sources. As individual machines, or.
Vibration Sensors for Cooling Towers Challenges Cooling towers offer the vibration analyst many challenges in sensor selection, mounting and environmental.
This is Miller, he told us something about WINDGENERATORS.
Chapter 33 Charging System Fundamentals.
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
ECE 4411 Dynamic Braking of Induction Motors Slow down a machine by converting kinetic energy stored in the rotating mass to heat energy in the rotor and/or.
Wind Turbine Design and Implementation.. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Alternate Energy Activities A look at Wind Power.
Wind Turbine Energy Conversion System Design and Integration Advisor: Venkataramana Ajjarapu 2009 Project Team Elsammani Ahmed Hassan Burawi Brandon JanssenLuke.
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
Abstract In 2008 President Geoffrey introduced the Live green program which called for environmentally conscious living. In light of this initiative, it.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Chapter 19 Charging Systems.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
Advisor: Venkataramana Ajjarapu May Project Team Elsammani AhmedHassan Burawi Brandon JanssenKenneth Thelen.
Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda Butler (EE) Advisor: Venkataramana Ajjarapu.
1.4b Charging System 1. Charging System Function of the charging system 2 Convert mechanical energy into electrical energy Recharge battery Provide higher.
Electrical Fundamentals
Electromagnetism
Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
Generators Mrs. Brostrom Integrated Science C. Generators II. Magnetism can create electricity – A moving conductor (wire) in a magnetic field generates.
Honeywell Proprietary Honeywell.com  1 Customer Needs (Inverter Manufacturers and Solar Panel Installers) 1.PV solar panel manufacturers – not our focused.
Wind Energy Station Directions. Simple Wind Generator 1.Connect the LED to the motor in the pvc stand (using the red and black wires). 2.Place the motor.
SFC UPSHAW POWER GENERATION EQUIPMENT Preventive Maintenance & Troubleshooting.
Synchronous Induction
CHARGING SYSTEM Major Parts Battery                                               Alternator Regulator.
W IND T URBINE D ESIGN AND I MPLEMENTATION P HASE III P ROJECT O VERVIEW Our senior design team expanded a previous wind energy project led by Dr. Ajjarapu.
Elec467 Power Machines & Transformers
MUEV Phase III By: Kevin Jaris & Nathan Golick. Introduction Petroleum is a finite resource. Demand for clean energy is driving the increase in the production.
Introduction In 2008 President Geoffrey introduced the Live Green Program which called for environmentally conscious living. In light of this initiative,
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Wind Turbine Simulation (Phase IV)
Renewable Energy Research Laboratory University of Massachusetts Wind Energy: State-of-the Art and Future Trends Southwest Renewable Energy Conference.
Period 1 presentation. The ruins of a Persian windmill.
Page 1 International Future Energy Challenge Integrated starter/alternator topic IFEC ‘07.
ISU Science Center : Phase 3 : Dec Speedometer Station This station matches two areas of study into one cohesive system. Current will be induced.
Power Factor Improvement Lecture 9. Normally, the power factor of the whole load on a large generating station is in the region of 0·8 to 0·9. However,
Understanding the                                                                                                                                                                                                                          
Project Web Site: Client: Jim Walker Advisor: Professor Ajjarapu Abstract.
The WindMaster Lee Creviston Ben Peters Mark Rizzitiello Lindsey West.
Wind Turbine Project Plan (Dec08-04) ‏ Lindsay Short Nick Ries Luke Donney Dario Vazquez Chris Loots Advisor: Dr. Ajjarapu Client: Dr. Aliprantis.
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Wind Energy. How does wind energy work? The wind blows on the blades and makes them turn. The blades turns a shaft inside the nacelle (the box at the.
Period 7.   The more curved side generates low air pressures, due to more surface area. While high pressure air, pushes on the other side of the design.
Wind Turbine Design & Implementation Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
Wind Turbine Energy Conversion System Design and Integration
E2 Motors and Motor Starting (Modified)
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
Electrical and Computer Engineering Cumulative Design Review Team 22: Driver Assist.
Portable Power Station University of Wyoming Electrical and Computer Department EE Done By Mohammad S. Almoallem Mahmood S. Almoallem Advised.
Prototype Wind Turbine Presentation by – Anthony Benasco Brody Holloway Hulon Reid Advisors – Dr. Cris Koutsougeras Dr. Junkun Ma Senior Design Teacher.
From Lecture1 vi , ii vo , io Power Processor Controller Source Load
Power Electronics and Control in Wind Energy Conversion Systems
IG BASED WINDFARMS USING STATCOM
Hybrid Transaxle.
Lesson 16: Asynchronous Generators/Induction Generators
ACTIVE LEARING ASSIGNMENT
UNIVERSAL MOTORS.
From Lecture1 vi , ii vo , io Power Processor Controller Source Load
Wind Turbine Energy Conversion System Design and Integration
ME 252 Thermal-Fluid Systems G. Kallio
Introduction to Residential Wind Energy
Electric Machine Design Course
Presentation transcript:

Functional Requirements Generate an AC current Supply an output of 500 to 1000 Watts Supply power to the Coover Hall grid Turn off in high wind speeds Protect internal components from power surge Controls connect to a display to display data Non-Functional Requirements Enough space below the blades for a person to stand under them safely Comply with building code weight and height limits Components comply with federal and state electrical regulations Turbine type is fixed speed and upwind Deliverables Wind turbine and tower Control electronics and power electronics Manual Client Dr. Dionysios Aliprantis Faculty Advisor Dr. Venkataramana Ajjarapu Team Members Dario Vazquez (CprE) Nick Ries (EE) Luke Donney (EE) Lindsay Short (EE) Chris Loots (EE) Dustin Dalluge (ME) Design Mechanical Safety Brake can be applied for maintenance Furling tail turns the nacelle and blades out of the wind whenever it is too strong Tower is high enough (15’ height) that a person can safely walk under the blades Tower base is wide to keep tower and nacelle stable (10’x10’ square base) Electrical Safety Motor has thermal overload protection that disconnects it from grid Protection circuit disconnects turbine from grid whenever voltage, current, or wind speed are not within specifications Lightning rod mounted on nacelle diverts energy from lightning strike Implementation Mechanical Nacelle is made of ¼” steel plate for sturdiness and durability Blades are made of fiberglass composite and are 9.2’ in diameter Gearbox increases speed from the blades by a factor of 10 to drive motor Electrical Generator is 208 VAC, 3-phase, 1.5 HP induction motor Microcontroller monitors motor speed and connects it to grid when above synchronous speed (1800 RPM) Motor can produce an estimated 330 Watts to the grid Project CostsProject Hours To provide a more accurate analysis of our equipment we have tested all equipment individually, as subgroups, and as a whole system. Individual Motor The AC motor was driven by a DC motor to measure voltage and current output Capacitors were used to build up residual magnetism in the AC induction motor. We will connect three light bulbs as loads and measure the voltage and current output. The AC motor was connected to the grid and driven at 1800 RPM to measure its power output. At 1800 RPM, the AC motor was floating, which means that it was not drawing nor providing power to the grid. Unfortunately, the DC motor could not drive the turbine past 1800 RPM, but we will use another source to drive the AC motor. Gearbox The output shaft was marked, and the input shaft was rotated to verify that the gearbox has a 1:10 input to output ratio Brake The brake was tested to make sure it keeps the blades, gearbox, and motor from rotating Subgroups Nacelle After installing all components in the nacelle, the mechanical resistance of the system was tested by turning the shaft to make sure everything was lined up correctly. Control System RPM sensor was tested using a computer fan that had its speed sensor wire connected to a computer for actual RPM reading Output that activates contactor was tested to ensure that it is only on when the motor RPM is between 1800 and 1860 RPM Whole System Nacelle/Control System/Protection System: Before a permanent installation into the grid our system must be tested for safety. Wind energy is a good sources of renewable and environmentally friendly energy. Our project is our attempt to show and provide an example of this wonderful resource. The turbine in this project is designed to be tied into a power grid system and provide a very low amount of supplementary power to the grid. With this system in place Iowa State and the Electrical Engineering department can be viewed as leaders in the pursuit of “green” energy. Special thank you to Tom Donney, Lee Harker, Dr. Greg Smith, and Trishna Das for providing materials, advice, and/or help in our project. Problem Statement Iowa State University announced on January 2008 that it aims to become a model of energy efficiency. To help this vision become a reality, we wanted to create a wind turbine that would serve as an attraction for future engineers and as a tool for alternative energy experimentation or research. Proposed Solution The proposed solution was to install a small-scale wind turbine on the roof of Coover Hall. The turbine would generate between 500 and 1000 Watts of AC electricity and feed it to the Coover electrical grid. We decided that the best choice for turbine was a fixed speed, upwind type that faced west. System Block Diagram